Open Issues Modification of Cactus Arm bending tool required

Slides:



Advertisements
Similar presentations
Thule Smart RV™ Pod Kit Installation For Smooth-Sided Fiberglass RVs
Advertisements

J.P. Langston Brake Retrofit
Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
AnaSonde Assembly. What is the AnaSonde? *Reads temperature, pressure, and humidity data from the atmosphere *After it is sent into the atmosphere, it.
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
RockOn! Canister Integration RockOn! 2009.
Installation. Indoor Unit Installation Typical Installation.
Click on this image to open the full PDF document.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Mer/Sup. 2 & 3 Door Evaporator Coil Repositioning Procedure S. Starnes 7/11/03 1. Remove the 2 screws holding one end of the evaporator coil. (view shows.
Pneumatic Arm Assembly Instructions
Electronics Merit Badge Class 4 5/17/2015Electronics Merit Badge Class National Scout Jamboree1.
Drinks Bottle Using CREO DEVELOPMENT
Takashi Matsushita Imperial College T. Matsushita 1 Station 5.
July GLAST Project Installation Review LATLAT 1 Tracker Tower Installation Review Peter Amnuaypayoat
Tracker Subsystem1 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 GLAST LAT Tracker Tower7/9 Pre-Ship Review INFN-Pisa.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 1 TMCM connector stay clear problem Alessandro Brez INFN - Pisa
Tracker Subsystem1 GLAST LAT Project FM-B PSR, 10 Feb, 2005 GLAST LAT Tracker Tower-B Pre-Ship Review Luca Latronico INFN-Pisa
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
Installation. Indoor Unit Installation Typical Installation.
LAUNCHER BASE PARTS B A D E F C G. LAUNCHER BASE PARTS B A D E F C G.
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
Installation. Indoor Unit Installation Typical Installation.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Installation of nephelometer Remove 4 screws from top round plate of instrument (will need a Phillips head screw driver) turn “neph” upside down (careful.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
1 Jim Thomas - LBL Sector Tools – a conversation with Jon Wirth and Eric Anderssen August 28 th, 2015.
GLAST LAT ProjectPisa 9/1/04 A.Brez 1 GLAST Large Area Telescope: Grid interface proposal Alessandro Brez INFN Pisa Gamma-ray Large Area Space Telescope.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
Installing Guttering and Rainwater Systems
1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
RockOn! RockOn! Structure Build RockOn! 2009.
Tracker Subsystem GLAST LAT Project 1 ANNEX 1 to NCR/FM/INFN/PI/372 STATIC TEST TORQUE LOSS OUT OF SPEC’S ON BOTTOM TRAY S/N 005 Andrea Tenze
VIEW SERIES with Sliding Door
Installation Walkthrough Image Guide
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
RE 4/3 RPC Pre-assembly manual 1. HCP case preparation
Procedure for MCM rework on tray MID 070
ATLAS pixel module assembly flow
INSTALLING BYRNE POWER BOX INTO FLEX SYSTEM
CAUTION GENERAL TOOLS REQUIRED ASSEMBLY AND INSTALLATION
Ladder Assembly All tools and jigs produced Glue dispensing works
GLAST Large Area Telescope:
The Reading Tug – Schuylkill By: Barry Hensel
Methods for Mounting LCD Displays
Easy-Cliner Manual Cable Version Assembly Instruction
Ladder Assembly All tools and jigs produced Glue dispensing works
Endcap shielding senarios:
HB RM prototypes Ianos Schmidt Aug 17, 2017.
SWITCHES W. C. “Buster” Hounshell Spring 2002.
Teacher training resource: Robotic Assembly
CAUTION GENERAL TOOLS REQUIRED ASSEMBLY AND INSTALLATION
Hydraulic Arm Assembly Instructions
CL4NX +Dispenser (KITTING MANUAL)
LST Module Installation
GLAST Large Area Telescope:
A circuit is the circular path that electricity flows through
Teacher training resource: Robotic Assembly
US-HiLumi – Shipping Post Assembly Status
Repairing the Electrical Components
Tracker to Tracker Clearance Reduction Contributors
Presentation transcript:

Open Issues Modification of Cactus Arm bending tool required August 25, 2004 Open Issues Modification of Cactus Arm bending tool required New bending tool necessary for last arms of C-2 and C-3 cables Difficulties to install the bi-adhesive under cables because of excessive peeling Difficulties to install the sidewall due to not perfect alignment between trays reference holes, thermal boss and structural side treaded holes Some trays thread-holes were found to be obstructed from glue Dark box over tower assembly jig installation not safe N° 8 Studs not installed on the tower (see NCR-104) Some modification to Cones Installation Plan required LPT Electrical test performed instead of CPT (see NCR-104): this was done to save time and leave the tower to the alignment team as soon as possible, given the team constraints from their travel schedule. A LPT was enough to check the status of trays and cables after assembly. A CPT will be performed anyway after alignment Tie down strap (LAT-DS-02090) have wrong fixing holes (see NCR-109)

August 25, 2004 Open Issues Connector mount: screw final torque too high (NCR/FM/INFN/PI/116) Tower need grounding (probably on Base Plate) Connector savers on TEM side do not remain attached Cables on Cable Holding Plate are twisted. Concerns about this configuration during vibe tests. Improve assembling of Top Bracket and Cables Top Bending: Tape needs to be placed over the gaps between the closeouts on the top tray and the sidewalls to prevent object falling. Care needs to be taken to push the cables all the way against the clip when placing the mid screw. After the pushing the cable down there was no more interference and the third screw could be installed. The holes -X-Y corner bracket didn't match up with the holes in the top tray. Use adhesive tape to attempt to hold the cables to the brackets doesn't appear to be necessary or helpful. Top Bracket Nest: wrong screws and not OK for Vacuum environment (NCR/FM/INFM/PI/117) Top Bending cables clip fixing difficult (see NCR-118) Cable clip internal side should have kapton and all the edges should be rounded (see recommendation of September 9th)

Tower Zero Assembly Activities Cable Holding Plate assembling before Tower Turn Over Top Cables Bending

Tower Zero Assembly Activities Top Bending and installation of Top Tooling Ball Tower Zero CMM measurements confirm that the Tower is well done: Tower to Base Plate misalignment 134 microns Tower maximum shift (higher corner) 154 microns Overall misalignment =288 microns