ALICE 5 o’clock meeting Wk 3 - 2011.

Slides:



Advertisements
Similar presentations
TC meeting /11/14TC meeting2 ALICE LS1 plan from now till MarchWeeks Install TRD infrastructure46 TRD4&5 (and counterweights removal)47.
Advertisements

LS1 planning meeting Activities weeks 13, 14 & 15 22/3/13LS1 planning meeting - A.Tauro2.
ALICE planning meeting /12/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /12/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
TC meeting P2 planning wks 7&8 A.Tauro
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
winter shutdown preparatory meeting A.Tauro /1/12ALICE winter shutdown schedule - A.Tauro 1.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
ALICE 5 o’clock meeting Wk 49
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
SU ACTIVITIES PENDANT LS1 CMS ALICE. Antje Behrens | SU pendant LS1 day| | EDMS | page 2 CMS Quoi (quelles activités prévues pendant.
P2 status, LS1 planning A.Tauro - W.Riegler. Outline TS2 activities Detector activities during LS1 Proposal for ALICE recommissionig plan in 2014 Conclusions.
TS4 preparatory meeting TS4 – weeks Underground access possible in week 51 – as from Monday morning 9:30 –Ulli and Philippe will start.
winter shutdown preparatory meeting A.Tauro /12/11ALICE winter shutdown schedule - A.Tauro 1.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
ALICE TC meeting – Plans for the next technical stop A. Tauro.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
winter shutdown planning A.Tauro
winter shutdown planning A.Tauro
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
TS May 9-12 – Schedule SL instructions: Both magnets ramped down Monday May 9 th 7:00 latest Thursday: check with CCC before restarting magnets: – TE-EPC.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
ALICE planning meeting /2/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
TC meeting P2 planning wks 9&10 A.Tauro
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
TPC Collaboration Meeting Peter Glassel 1 Reminder on Installation Schedule (ALICE Forum June 2002)  Install Muon magnet directly into experimental.
ALICE 5 o’clock meeting Wk 49. INDICO You’ll find this meeting here: – The full shutdown planning.
winter shutdown planning A.Tauro /1/12ALICE winter shutdown schedule - A.Tauro 1.
ALICE 5 o’clock meeting Wk 49
TC meeting P2 planning wks 5&6 A.Tauro
TS2 preparatory meeting A.Tauro. General information LHC- TS2: from Monday 31st 6am, to Friday 4th 5pm LHC beam stops on Monday morning.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
TS3 preparatory meeting 14/9/2012 TS3: 17-21/
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
TS3 preparatory meeting A.Tauro. General information LHC-TS3: from Mon 9 6am, to Fri 13 5pm LHC beam stops on Mon morning at 6:00.
TC meeting P2 planning wks 3&4 A.Tauro
ALICE planning meeting /11/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
DCal-ALICE integration and installation plan and status A. Tauro.
ALICE Installation: Planning Meeting Agenda: 1- ALICE shutdown schedule 2- Miniframe removal sequence.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
EYETS planning A.Tauro.
ALICE 5 o’clock meeting Wk 51.
ALICE planning meeting
TS2 preparatory meeting
LS1 planning meeting - A.Tauro
LS1 planning meeting
TS1 preparatory meeting
ALICE TC meeting – Plans for the next technical stop
Shutdown conclusion, LS1 and LS2 planning - A.Tauro
LHCb & EYETS
ALICE 5 o’clock meeting Wk
DAYS OF THE WEEK.
Time management School of Rock.
Sunday Monday Tuesday Wednesday Sunday Monday Tuesday Wednesday
FIZZ FREE FEBRUARY 2019 Your name: Your school:
Days of the Week Monday Tuesday Wednesday Friday Thursday Saturday
Created by: Ramona Lewis-Dailey
Extended Christmas Hours Thursday December 8th 9am -6:30pm Friday December 9th 9am -6:30pm Saturday December 10th 9am-6pm Thursday December.
Time 1.
Contact
Created by: Ramona Lewis-Dailey
2011年 5月 2011年 6月 2011年 7月 2011年 8月 Sunday Monday Tuesday Wednesday
Week 25 Summary Coordinators: Mike Lamont and Barbara Holzer

BOOKINGS – Monday, 2nd July BAYWAVE
Mr. Butler 6th Grade Earth Science
Presentation transcript:

ALICE 5 o’clock meeting Wk 3 - 2011

INDICO You’ll find this meeting here: http://indico.cern.ch/categoryDisplay.py?categId=2957 The full shutdown planning is here: http://indico.cern.ch/conferenceDisplay.py?confId=121413

Access request Cavern and surface You should submit an ADI and a task procedure Attach task procedure Work breakdown structure – risk associated at each step Two persons minimum ADI https://edh.cern.ch/Document/ADI Task procedure Template EDMS 1103355 17/1/11 5 o’clock meeting

ALICE Christmas break schedule Open L3 doors TRD Close Experiment EMCal Open Experiment Close L3 doors 17/1/11 5 o’clock meeting

UX25 access Rules for access restrictions: Removal/installation of shielding (restriction includes RB24 triplets) PX24 blocks: no access CR5 and UX25 PX24 beams (35t): no access CR1-5, Expo, and UX-25 All other blocks: no access to UX-25 LHC evacuation test (7/12 after 18:00 and 24/12) – no access UX25 Gas functional test (10/12 - 2 hrs) – no access UX25 and CR1-5 AUG test (20/1) (Arrêt Urgence General – General Emergency Stop) – no access UX25 DSO test (12-13/1) (Department Safety Officer) – no access UX25 No access SX2 during manipulation of blocks in SX2 (except ACR and WRs) 17/1/11 5 o’clock meeting

L3 (and MNF) access No Ventilation 13 EMCal 3 No Ventilation 24 31 7 EMCal EMCal Evac. No Ventilation Lift Wks 50 and 5: access (TPC) to be coordinated with TC (transport) Wks 1-2: no access during EMCal SMs insertion inside L3 (see day-by-day) When moving from low-beta to yellow platform: no access to MNF When inserting the module: no access L3 and MNF Watcher needed in wk 49 and from wk 4 onwards Wk 7: Kr calibration – TPC T stability (all interventions to be agreed by TC/RC) 17/1/11 5 o’clock meeting

Day-by-day schedule UX25 and MNF - Wk 3

Activities in UX25 - Week 3 - 17/1 Monday Cooling towers maintenance (No primary water) Maintenance UX25, Muon TRK-TRG ventilation Maintenance ITECO (9:00 to 11:00) SPIE: cabling UX25-CR4 Reinstall laser hut door + PMD CROCUS platform It H Removal EMCal infrastructure TRD/EMC Survey TPC FEC Muon TRK: bus-patches SPD cooling SPD cooling Repair heater (nacelle) 17/1/11 5 o’clock meeting

Activities in MNF - Week 3 - 17/1 Monday TRD pre-trigger PMD: new T sensors 17/1/11 5 o’clock meeting

Activities in UX25 - Week 3 – 18/1 Tuesday Cooling towers maintenance (No primary water) Maintenance UX25, Muon TRK-TRG ventilation Google Street View: from 12:00 Maintenance AS 703 (UX-25) 7:30 to 9:30. No access to UX-25 from 7:30 to 9:30 Maintenance AS 715 (CRs) 9:30 to 11:30 SPIE: cabling UX25-CR4 Visit 10:00 (16 persons). Resp.: Naomi van der Kolk It TOF/PHOS/EMC cooling TRD/EMC Survey TPC FEC Muon TRK: bus-patches ST2 SPD cooling ST2: replace 2nd chamber Start 9:30 17/1/11 5 o’clock meeting

Activities in MNF - Week 3 - 18/1 Tuesday 17/1/11 5 o’clock meeting

Activities in UX25 - Week 3 - 19/1 Wednesday Cooling towers maintenance (No primary water) Maintenance UX25, Muon TRK-TRG ventilation Google Street View ZDF (9:00) Maintenance harmonic filter (EOF128/2X) Visit: (23 students). Dutch high school. About 14:00-17:00. (P. Kuijer) SPIE: cabling UX25-CR4 It TOF/PHOS/EMC cooling SDD fibers/ cooling TRD/EMC Survey TPC FEC Muon TRK: bus-patches SDD fibers/ cooling TOF TOF: re-cable 2 crates SM2-3 17/1/11 5 o’clock meeting

Activities in MNF - Week 3 - 19/1 Wednesday 17/1/11 5 o’clock meeting

Activities in UX25 - Week 3 - 20/1 Thursday AUG test. No access UX25 Cooling towers maintenance (No primary water) Maintenance L3, UX25, Muon TRK-TRG ventilation VIP visit (12:00: 12:00): Mr Michael Boddenberg, Hessischer Minister für Bundesangelegenheiten und Bevollmächtigter des Landes beim Bund, Hessen, Germany It 17/1/11 5 o’clock meeting

Activities in MNF - Week 3 - 20/1 Thursday 17/1/11 5 o’clock meeting

Activities in UX25 - Week 3 - 21/1 Friday Restart primary water Maintenance L3, UX25, Muon TRK-TRG ventilation It TPC FEC Muon TRK: bus-patches Close I-side door ACO Check ACORDE modules (PMTs optical connections, connectors, etc) 17/1/11 5 o’clock meeting

Activities in MNF - Week 3 - 21/1 Friday No access L3 (no ventilation) 17/1/11 5 o’clock meeting

Activities in UX25 - Week 3 - 22/1 Saturday No access L3 (no ventilation) It Close both doors ACO 17/1/11 5 o’clock meeting

Activities in MNF - Week 3 - 22/1 Saturday No access L3 (no ventilation) 17/1/11 5 o’clock meeting

Activities in UX25 - Week 3 - 23/1 Sunday No access L3 (no ventilation) It 17/1/11 5 o’clock meeting

Activities in MNF - Week 3 - 23/1 Sunday No access L3 (no ventilation) 17/1/11 5 o’clock meeting

AOB - 17/1/11 5 o’clock meeting