LHC Experimental Vacuum Systems Status October ‘07

Slides:



Advertisements
Similar presentations
14 June 2007VELOEddy Jans 0 Recent VELO-installation++ activities June 14, 2007 Potmeter calibration Bake-out Cabling & Commissioning.
Advertisements

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Vacuum studies at LAL Bruno Mercier, Christophe Prevost Alexandre Gonnin, Christian Bourgeois, Dirk Zerwas R.P. ILD MDI Meeting 24/3/15.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
25 January 2007VELO sub-projectsEddy Jans 0 VELO-meeting January 25, 2007 Sub-projects: SX & SX connectorize cooling cables alignment procedure.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Update on Experimental Beampipe Progress Ray Veness For Beampipe project team in AT/VAC and TS/MME With special thanks to: S.Calatroni, W.Cameron, D.Duarte,
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
1 st LTEX meeting Protecting the experimental caverns and personnel from a "sector 34 like" incident: work planned in the LHC tunnel Prepared by M GASTAL.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Movable beam pipe and NNC Study & prototype development Manchester 14/12/20091D. FP meeting.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
ELENA installation progress F. Butin / ELENA collaboration.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Vacuum System P. Chiggiato TE-VSC
Teleconf ACS – FREIA 28th March 2017
Detector status and commissioning: LUCID
TAXS and TAXN ABSORBERS - OVERVIEW
Francois and Lau EATM 17 July 2012
ELENA installation and commissioning status
Status of LHC installation & New Installation Schedule
Pre-installation and Functional Tests
Installation of an Instrument on a CERN machine
Machine-Experiment Interface
CMS Area Working Group Meeting
Components for the Machine-Interface Regions
Long Shutdown for the LHC: Vacuum Beam Pipes
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Progress with Experimental Vacuum Chambers
Accelerator and Experiment Interface Session: LS2, LS3
Current Status Future Progress Monitoring
Upgrade Strategy for the Experimental Vacuum Systems
LUCID Mechanical support and cooling proposal Status of the current design development Erik Richards, Raphael Vuillermet December 10th 2013.
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Installation plans from mid 2005
VELO-meeting January 25, 2007 Sub-projects: SX & SX
Polarized 3He target installation
Presentation transcript:

LHC Experimental Vacuum Systems Status October ‘07 Ray Veness For the project team (AT-VAC, TS-MME, with many thanks to the experimental teams)

Introduction and Contents Last presentation 19 June 07 ATLAS installation VAX installations Contents VAX zones ATLAS ALICE CMS LHCb Installation summary Budget and Schedule LEMIC 16 X 07 Experimental Beampipes - R.Veness

VAX Zones Overview Issues Status Consists of beamline components between experiment and Q1 plus gas injection system in IR1L, IR2R, IR5L Part of the experimental vacuum sector, used for pumping and venting sectors (ex.LHCb) Issues Very limited access in ATLAS and CMS Limited installation window between triplet repairs and machine sector cooldown Co-activity with survey, triplet repairs and warm magnet commissioning Integration conflicts with survey have led to modifications of injection and pumping lines in IR1 and 5 Status 2 fully complete (IR5R, IR8R) 2 commissioning this week (IR2R, IR8L) 2 installation in progress (IR1L, IR5L) 2 to be done (IR1R, IR2L) Beam line components IR5L VAX zone in IR1L LEMIC 16 X 07 Experimental Beampipes - R.Veness

ATLAS VI installation and Alignment Installed VI was integrated in the PIXEL package in SR1 from Dec ’06 The PIXEL and VI were installed together at the end June ’07 … and aligned The VI was nominally centered within the PIXEL package during integration After installation it was re-surveyed, then re-positioned using the specially developed laser alignment system LEMIC 16 X 07 Experimental Beampipes - R.Veness PIXEL and VI installation

ATLAS VA Installation (x2) VA-A side and C-side installed VA-A Installed from C-side, passing through the ID bore VA-C installed from an extension to the PIXEL installation scaffolding VA-A in the ID bore LEMIC 16 X 07 Experimental Beampipes - R.Veness VA-C in transport box during positioning VA-A in the Barrel – endcap gap

Installation Status: VT VT installed A and C sides VT support rails installed in JTT and tested July ‘07 VT chambers inserted inside JTT, but not mounted on rails – just resting on the JTT bore LEMIC 16 X 07 Experimental Beampipes - R.Veness VT and support rails in JTT Working platform for VT and TAS operations

ATLAS Remote flanges and Interface plates TAS flange A and C installed Mechanical components mounted on the TAS absorber, mechanical and leak detection successfully completed Interface plate A and C installed Plate positioned on beam axis with aid of TS-SU During this operation, it was found that both monoblocks (and hence TAS) are further than nominal from the IP: 29mm on A-side and 21 mm on C-side Actions As TAS is a machine element, F.Butin is circulating an NCR for approval with the recommendation to ‘use as-is’ Lateral alignment of the TAS is also required – F.Butin will coordinate Preparation for leak testing of TAS and remote flange Installation of interface plate Positioning of interface plate LEMIC 16 X 07 Experimental Beampipes - R.Veness

ATLAS VAX Sectors IR1L installed (A-side) IR1R (C-side) Cabling Equipment between TAS and Q1 installed and leak tested Gas injection lines installed, but will be modified due to interface issues with survey Gas purifier box to be installed on HO structure, A-side, level 6 (meeting area) week 46 IR1R (C-side) Equipment here to be installed from week 43 Cabling Additional cabling for Gas Injection and VAX bakeout will be routed into the ATLAS cavern Gas injection lines installed over the Q1 in IR1L LEMIC 16 X 07 Experimental Beampipes - R.Veness

Connection of VI to VA VA-A, VI, VA-C connected All three chambers were bolted together on 27/8/07 Pumping equipment was positioned below the TE, and connected with long (~8m) flexible hoses Chambers pumped overnight to reduce pressure background, then leak tested No leaks (on flanges) with sensitivity of ~2x10-10 mbar.l.s-1 Pumping equipment as installed LEMIC 16 X 07 Experimental Beampipes - R.Veness Pumping line on VA (non-IP end) Connection of VI to VA

Status of Bakeout Cable Routing in UX 40 cables, total length 1.4 km pulled 100% cables pulled for beam vacuum Connector attachment 100% complete TX1S patch panel PP2 patch panel LEMIC 16 X 07 Experimental Beampipes - R.Veness

Vacuum Instrumentation Routing in UX 28 cables, total length 1.9 km pulled 100% cables pulled for beam vacuum Connector attachment 70 % complete TX1S patch panel To US 15 LEMIC 16 X 07 Experimental Beampipes - R.Veness

ATLAS Remaining Tasks Testing Installation Commissioning Testing of bakeout circuits in the cavern Chambers must be under vacuum and circuits heated Integration and testing of LUCID with the VJ chamber in B.927 (in progress) Installation test of the VJ chamber in the cavern (Nov ’07) Full integration test of ATLAS reserve chambers in 927 Installation Opening and closing of the e-cal around the VA chamber Delicate operation, as the chamber must slide inside the detector Installation and alignment of VA fixed supports Requires ATLAS small wheel to be in place Connection and alignment of VT chambers Requires VA to be in final position Installation, connection, alignment and test of VJ chambers Requires ATLAS Toroid and VT to be in final position Commissioning Gas injection system – Scheduled for week 46 Final chamber commissioning VJ support cone being modified for LUCID supports (16 Oct ’07) LEMIC 16 X 07 Experimental Beampipes - R.Veness

ALICE Recent activities Remaining activities Transfer of central beampipe from Installation and Bakeout Shell to final supports Transfer VAX on IR2R to final configuration Temporary supports were installed to allow RB26 commissioning without the Q1 in place Now moved to final configuration, and gas injection lines modified Beryllium beampipe in ITS with last section of installation and bakeout shell Remaining activities IR2R VAX sector Commission VAX sector and re-pump gas injection system (in progress this week) RB24 and IR2L VAX sector Install and Commission VAX sector (scheduled from week 44) Install and commission RB24 copper chambers and supports ALICE want to delay this until 2008? LEMIC 16 X 07 Experimental Beampipes - R.Veness

CMS Recent Activities VAX 56-side Installation complete, finalising leak testing 54-side beamline equipment being installed Gas injection and pumping lines being modified Beam line components IR5L LEMIC 16 X 07 Experimental Beampipes - R.Veness Shielding closure tests

CMS Remaining Activities Integration testing in 927 Mechanical and bakeout test of the assembled forward chambers has been prepared in B.927 Tests will start next week Installation in the cavern Waiting for a window to install the 54-side forward chamber and remote flange Remaining chambers (Central, 2x endcap, 2x HF, 2x CT2) installed in 2008 LEMIC 16 X 07 Experimental Beampipes - R.Veness

LHCb Remaining Tasks A1R8 VAX sector A1L8 Sector (including VAX) Sector complete and commissioned in Aug ’07 A1L8 Sector (including VAX) Installed and leak tested, commissioning this week LHCb magnet test Beampipe position monitored during test Gas Injection System Control system being transferred to definitive rack Installation of VELO detectors Beampipe and detector volume under ultra-pure Neon Will open 29/10 to install detectors, then pump, leak detect and re-fill with Ne Leak between detector and beam volumes mean opening time must be minimised Need to ensure better than 10-5 mbar in detector volume to prevent early NEG saturation Leaking VELO boxes will be replaced by LHCb Access for VELO detector installation LEMIC 16 X 07 Experimental Beampipes - R.Veness

Installation Summary ALICE – 80% complete ATLAS – 60% complete RB24-side chambers and some follow-up on central region remain RB24 in 2008? ATLAS – 60% complete 5/7 chambers installed, 3/7 connected, 1/7 aligned Extensive permanent cabling is well advanced 1 / 2 VAX zones installed Remaining installation in 2008 CMS 10% complete 1/9 chambers installed 2/2 VAX zones well advanced Bulk of installation in 2008 LHCb 95% complete Installation of VELO detectors and some minor tasks remain LEMIC 16 X 07 Experimental Beampipes - R.Veness

Budget and Schedule Schedule and resources for remaining operations Major installation work in ATLAS and CMS will not be complete until at least March ’08, according to the latest experimental schedules Installation of ALICE RB24 sector may also be pushed to 2008 As schedule is not well defined, we need to keep flexibility for FSU support Request 50% contribution from experimental budgets Budget and manpower planning for 2008 AT/VAC budget and manpower plans are being made for 2008 Need information from experiments for possible detector openings in 2008/9 shutdown LEMIC 16 X 07 Experimental Beampipes - R.Veness