Agenda item 7b Implementation of the Action Plan for Improvement of National Accounts Statistics in Azerbaijan N. Suleymanov State Statistical Committee.

Slides:



Advertisements
Similar presentations
Implementation of 2008 SNA in Jamaica. Outline Policy issues - relationship with national accounts framework The Jamaican System of National Accounts.
Advertisements

Regional Seminar on Developing a Programme for the Implementation of the 2008 SNA and Supporting Statistics January 30-February 1, 2013 Kingston, Jamaica.
Presented by: Denise Sjahkit SURINAME. Introduction Overview of the main policy issues Scope Current compilation practices Data-sources Requirements for.
Meeting of the Working Party on Meeting of the Working Party on National Accounts Statistics Directorate, OECD PARIS, FRANCE 3-5 October October.
PRIME MINISTRY REPUBLIC OF TURKEY TURKISH STATISTICAL INSTITUTE TurkStat NATIONAL ACCOUNTS IN TURKEY 1 TurkStat.
Ghana’s Experience in Setting Up a Plan for the Implementation of the 2008 SNA 2 nd Meeting of the Continental Steering Committee Addis Ababa, 2-4 April,
Government Sector Workshop on the Implementation of the 2008 SNA, 29 November-02 December 2011, Kiev REPUBLIC OF MACEDONIA STATE STATISTICAL OFFICE Agenda.
Department of National Accounts TURKISH STATISTICAL INSTITUTE (TurkStat) Workshop on the Implementation of the SNA-2008 in EECCA Countries and Linkages.
GENERAL GOVENMENT SECTOR OF THE REPUBLIC OF ARMENIA Workshop on implementation of the 2008 SNA in EECCA countries and linkages with BPM6 and GFSM 2014.
1 Transition of National Accounts of the Republic of Belarus to 2008 SNA Methodology and Cooperation between Producers of Official Statistics National.
1 Legal foundations and institutional arrangements on Energy statistics in the Republic of Azerbaijan Yusif Yusifov, Head of division Industry, transport.
JOINTLY ORGANISED BY UNECE, EFTA, AND EUROSTAT, IN COLLABORATION WITH IMF AND TURKSTAT NOVEMBER 2013, ISTANBUL, TURKEY COUNTRY PRESENTATION: ALBANIA.
MONGOLIA: IMPLEMENTATION OF THE 2008 SNA 1 B.BADAMTSETSEG Director of Macro Economic and Statistical Department, NSO Meeting the expert group on National.
Integration Development Programme in the Field of Statistics of the Eurasian Economic Union for EEC THE EURASIAN ECONOMIC COMMISSION.
1 Selected Issues with Implementation of 2008 SNA (continued) Training Workshop on System of National Accounts for ECO Member Countries October 2012,
GENERAL GOVENMENT SECTOR OF THE REPUBLIC OF ARMENIA Workshop on implementation of the 2008 SNA in EECCA countries and linkages with BPM6 and GFSM 2014.
Implementation 1993 SNA in statistical practice of Azerbaijan The State Statistical Committee of the Republic of Azerbaijan Sabina Guliyeva Senior Adviser.
Croatian National Accounts Jadranka Vuglar & Jasna Kiš Workshop on the Implementation of the 2008 SNA, Kiev, 29 November – 2 December 2011 Agenda item.
REPUBLIC OF BELARUS EXPERIENCE OF BELARUS IN THE NATIONAL ADAPTATION OF CLASSIFICATIONS OF ECONOMIC ACTIVITIES Olga Pintchuk, Chief of the department of.
Workshop on the Implementation and Links between the System of National Accounts 2008 and the Government Finance Statistics Manual 20 – 22 November 2013,
United Nations Economic Commission for Europe Statistical Division 2008 SNA - Implementation plans in SPECA countries Presentation by UNECE Gabriel Gamez.
Implementation of the 2008 SNA Implementation of the 2008 SNA UNECE recommendations and implementation strategy for EECCA and SEE countries Workshop on.
Seminar on Developing Programmes for the Implementation of the 2008 SNA & SEEA Ghana’s Presentation By Bernice Serwah Ofosu-Baadu (Head, National Accounts.
St. Vincent and the Grenadines Statistical Office IMPLEMENTATION OF 2008 SNA AND SUPPORTING ECONOMIC STATISTICS UNSD – KINGSTON, JAMAICA 30 JANUARY – 1.
MEASURMENT OF NON- OBSERVED ECONOMY IN THE NATIONAL ACCOUNTS OF UKRAINE Agenda item 6d Workshop on the Implementation of the 2008 SNA, Kiev, 29 November.
International Statistical Committee of the Commonwealth countries ( CIS Statistical Committee ) CIS Statistical Committee Work on Coordination and Implementation.
Implementation of the 2008 System of National Accounts in Azerbaijan and some challenges of FISIM estimation Author: Nuru Suleymanov State Statistics Committee.
 Statistical Center of Iran is legal responsible for compilation of economic statistics and national accounts. National accounts compile by Economic.
Non-observed economy in Kyrgyz Republic The National Statistical Committee of Kyrgyz Republic Sultanaliev M.K. – Leading specialist of the Department of.
United Nations Economic Commission for Europe Statistical Division Current status of implementation of SNA Implementation of the SNA in the EECCA, SEE.
Agency on statistics under the President of the Republic of Tajikistan Training Workshop on the Compilation of Quarterly National Accounts for Economic.
United Nations Economic Commission for Europe Statistical Division ISSUES AND CHALLENGES IN ECONOMIC STATISTICS IN EECCA COUNTRIES Lidia Bratanova, Statistical.
Real Financial Services 1 UN STATISTICS DIVISION Economic Statistics Branch National Accounts Section UNSD/ECA National accounts workshop November 2005.
1 Priorities and challenges faced in implementing SNA 2008 in Belarus National Statistical Committee of the Republic of Belarus.
1 1 Economic Statistics in Russia: development and new challenges for International Forum on Monitoring National Development (Beijing, September.
United Nations Economic Commission for Europe Statistical Division Implementation of the 2008 SNA in the Eastern Europe, Caucasus and Central Asia, South.
1 Overview of Economic Statistics in Africa UNECA Andry Andriantseheno Regional Workshop on Basic Economic Statistics Addis-Ababa October 2007.
1 1 R&D in the Norwegian National accounts Presented by Knut Ø. Sørensen Statistics Norway Agenda item 4 Invited paper 14.
1 Transition of National Accounts of the Republic of Belarus to 2008 SNA Methodology and Interaction between Producers of Official Statistics National.
On the Next Revisions of the JIP Database -Toward Harmonization with the JSNA- Presented at the 2 nd Asia KLEMS Database Management Workshop on October.
Planning, preparation and conducting TQS in Tajikistan Agency on statistics under the President of Tajikistan.
REPUBLIC OF SEYCHELLES
Faqi SHI Dept. of National Accounts, NBS
MALDIVES Project Support meeting for the Regional Programme on Economic Statistics Bangkok, November 2016.
EVIDENCE BASED POLICY MAKING: THE CASE OF ALBANIA Michelle Jouvenal, ISTAT, Office for International Relations and Cooperation Stefano Pisani, Revenue.
Statistical Institute of Jamaica
The main orientations, plans and problems when implementing the
Item 5а National Accounts of Ukraine: Current Status and Development Perspectives Irina N. Nikitina Director of Macroeconomic Statistics Workshop on the.
Implementation of the Sustainable Development Goals (SDG) in the Republic of Uzbekistan Geneva, April 12, 2017.
Highlights of the revision of National accounts
Environmental Protection Expenditure Account - Pilot study of Poland
THE BAHAMAS COUNTRY PRESENTATION
NATIONAL ACCOUNTS STATISTICS-INDIA
Assessment of National Accounts Compilation in the GCC Countries Giovanni Savio, Statistics Division, UN-ESCWA High level seminar on the implementation.
Agenda item 5b Main challenges and priorities for future work Implementation of the 2008 SNA in the EECCA, SEE and Mongolia Presentation by UNECE Workshop.
A SUMMARY NOTE ON REVISED GDP ESTIMATES
EVIDENCE BASED POLICY MAKING: THE CASE OF ALBANIA Michelle Jouvenal, ISTAT, Office for International Relations and Cooperation Stefano Pisani, Revenue.
O.V. Zavadskaya Head of National Accounts Department
CARICOM TRADE IN SERVICES STATISTICS (CTIS)PROJECT June-December 2016
General Government Accounts in Israel
Agenda item 7b Implementation of the Provisions of the SNA 2008 in the Practice of the CIS Countries CIS-STAT Workshop on the Implementation of the 2008.
Country report Nasriddinov Alayor
Regional Seminar on Developing a Program for the Implementation of the 2008 SNA and Supporting Statistics Bengi YOSUNKAYA September 2013 Ankara.
Overview 2008 SNA (cont’d) Training Workshop on System of National Accounts for ECO Member Countries October 2012, Tehran, Islamic Republic of Iran.
General Challenges and Drawbacks.
IMPLEMENTATION OF THE 2008 SNA IN AZERBAIJAN
Implementation of SNA2008 in China
Country Report of the Statistical Center of Iran for Workshop on Integrated Economic Statistics and Informal Sector for ECO Member Countries November.
Selected Issues with Implementation of 2008 SNA (continued)
ՀՀ ԱԶԳԱՅԻՆ ՎԻՃԱԿԱԳՐԱԿԱՆ ԾԱՌԱՅՈՒԹՅՈՒՆ
Presentation transcript:

Agenda item 7b Implementation of the Action Plan for Improvement of National Accounts Statistics in Azerbaijan N. Suleymanov State Statistical Committee of the Republic of Azerbaijan Workshop on the Implementation of the 2008 SNA Kiev, 29 November - 2 December 2011

In April 2009 The State Statistical Committee (SSC) of the Republic of Azerbaijan developed and approved «Action Plan for the Improvement of National Accounts Statistics in 2009 - 2011»

Main objectives: Addressing the «gaps» in the implementation of the 1993 SNA; Improvement of the business statistics and price statistics data, used for the compilation of national accounts; Setting the methodological and informational basis for the implementation of the recommendations of the 2008 SNA

Main areas of work (1) Improvement of the methods for measuring the output of the informal sector and of illegal activities (2010-2011); Implementation of the revised classification of economic activities (NACE rev.2) ; Improving the measurement of FISIM (2011); Improving the GDP estimates in constant prices (2010-2011); Development of relevant price indices (2009-2011); Improving the estimates of consumption of fixed capital (2010-2011).

Main areas of work (2) Improving the estimates of holding gains (2010-201); Recording of expenditure on research and development in national accounts (2010-2011); Recording of military expenditures in the national accounts (2010-2011); Setting of information and methodological basis for the development of estimates of non-produced non-financial assets (2009-2011); Improving the estimates of the output of the central bank (2011).

Priorities of the SSC of Azerbaijan in the Implementation of the 2008 SNA Output of the informal and illegal sectors; Improving the estimates of FISIM; Improving the GDP estimates in constant prices; Improving the estimates of consumption of fixed capital; Improving the estimates of holding gains; Recording of expenditure on research and development in national accounts; Recording of military expenditures in the national accounts; Improving the estimates of the output of the central bank.

The Action Plan was developed by: National Accounts Division; Branch Statistics Divisions; Price Statistics Division; Labour Statistics Division; Scientific-Research and Technological Design Center of the SSC.

Technical assistance for the implementation of the Programme Eurostat funded two-year TWINNING Project was launched in 2009. The project covers improvement of the Business register, business statistics data, price indices used in national accounts and as well improving the following national accounts area: sector accounts, input-output tables, financial accounts, estimates of consumption of fixed capital, measuring non-observed economy. The project objectives generally coincide with the objectives outlined in the Action Plan.

Results from the Implementation of the Action Plan (1) Methodological guidance and establishment of Working Group to estimate the stocks of non-produced non-financial assets, which includes representatives from relevant ministries and government agencies; Improved recording of military expenditures in national accounts, on the basis of additional data provided by the MoF; Improved estimates of holding gains; Improved spreadsheets and software for the calculation of national accounts indicators;

Results from the Implementation of the Action Plan (2) Revision of the statistical reports (questionnaires) to collect the necessary data for improving the estimates of consumption of fixed capital, production and distribution of R&D, FISIM, financial accounts indicators, accounts for the financial corporations sector; Integrated system of statistical reports and questionnaires was developed and put in place; Experimental estimates of supply and use tables in constant prices;

Results from the Implementation of the Action Plan (3) The following indices were developed: producer price index of transport services, postal services and telecommunications, price index of the housing market, the total price index for investment goods, taking into account imports and domestic production; Improved estimates of FISIM in current and constant prices; Allocation of FISIM to user sectors;

Results from the Implementation of the Action Plan (4) Analysis of the practices of European countries and development of methodological guidance for the estimate of illegal activities; Identification of data sources, collection of data and experimental estimates of illegal turnover and consumption of drugs, illegal production of alcohol and tobacco; Inquiry of tax inspectors on misreporting practices and corresponding estimates were done in cooperation with the Ministry of Taxes;

Results from the Implementation of the Action Plan (5) Experimental balances of labour resources for 2008-2010; Improved source data, methodological guidance and estimates of non-observed economy using the labour input method; Work on estimation of the number of foreign citizens working in Azerbaijan and of remittances to abroad was launched in cooperation with the Central Bank and the State Migration Office.

Thank you!