EM pre-integration review

Slides:



Advertisements
Similar presentations
Introduction to PSpice Simulation Software. The Origins of SPICE In the 1960’s, simulation software begins –CANCER Computer Analysis of Nonlinear Circuits,
Advertisements

GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
PALM-3000 Optical Bench Update Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss Team Meeting #15 10/29/2009.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
Computerized Train Control System by: Shawn Lord Christian Thompson.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Blackbody Controller 9 March 2004 Scott Ellington
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
Timothy QuinnFIELDS iCDR – EGSE Solar Probe Plus FIELDS Instrument CDR Electrical GSE Timothy Quinn UCB 1.
SPP Spacecraft Emulator (SCE) Introduction
Specview 32 Release 2.5 Enhancements
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
ASPERA-3 June 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 6_25/ Page 1 Monthly Status Report Report due 6/25/00 Schedule statused.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
SDR 7 Jun Associated Electronics Package (AEP) Curtis Ingraham.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
PACS SVR 22/23 June 2006 Test Campaigns1 Overview of PACS Test Campaigns Helmut Feuchtgruber MPE.
Reliability Applied to KM3NET
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
FGM peer CDR GSE - 1 Berlin, April 6, 2004 Ground Support Equipment Concept (GSE) Werner Magnes Institut für Weltraumforschung (IWF) Austrian Academy of.
FGM peer PDR GSE - 1 Braunschweig, October 8-9, 2003 Ground Support Equipment Concept (GSE) Werner Magnes Institut für Weltraumforschung (IWF) Austrian.
13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May , 2011 GSE Timothy Quinn.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope Instrument to Spacecraft Interface Simulator (ISIS) Test Readiness Review 15 December 2004 Jana Thayer Eric Hansen Stanford.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
Double Star meeting ESTEC 25/26 March Hardware Status Engineering breadboard fabricated to validate the FPGA concept – Using an ACTEL A1280 – Tested.
Double Star Active Archive - STAFF-DWP Data errors and reprocessing Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin LPP.
Double Star Active Archive - DWP/STAFF 1 Double Star Active Archive STAFF/DWP Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin.
WEC meeting TED status and WEC timing.
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
TRIO-CINEMA 1 UCB, 2/08/2010 System Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
BonnellFIELDS iCDR – AEB Solar Probe Plus FIELDS Instrument CDR Antenna Electronics Board AEB J. Bonnell, D. Seitz UC Berkeley, SSL
Double Star Active Archive - STAFF- DWP 1 K.H. Yearby, S.N. Walker, M. Balikhin University of Sheffield.
GLAST Large Area Telescope:
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
SPP/FIELDS Quarterly UMN 27 September 2016
Instrument Teams to SOC Test Specifications
Status of the DSP/ASPOC EM
Double Star: Experiment Activities
GLAST Large Area Telescope:
3 COMPONENTS OF MAGNETIC WAVES UP TO 4 kHz
I&T&C Organization Chart
Liquid LVs propellant consumption control terminal system
Double Star: Table of Contents
Double Star: Table of Contents
Cluster Active Archive – Wideband data BM2 mode
CSA Implementation overview since OR-8 Test campaigns Scheduled development plan Arnaud Masson CSA/CAA Operational Review 9 ESTEC, 04-June-2014.
ESA GSE.
RLGS Status / LCC B. Pätz, DLR/MUSC.
CAA-OR (End of Phase 1) CAA DWP Operations Review
GLAST Large Area Telescope:
Double Star Progress Meeting #3 Beijing 2 July, 2002.
ISUAL Associated Electronics Package
DSP Operation Management Center (DOMC)
0.0 Instrument Suite Name Presenter’s name
Proton Source and LEBT Luigi Celona & Lorenzo Neri
Peer Review Agenda (Suggested).
Electrical Ground Support Equipment Verification Test Support
GLAST Large Area Telescope
University of California Los Angeles
Integration and Test Organization Chart
Science Data Capture Jim Aloise Nov , 2004 System Programmer
FIRELEC Migration Solution
Integration & Test Instrument Operations Coordination
Chapter 13: I/O Systems.
Presentation transcript:

EM pre-integration review Double Star STAFF-DWP EM pre-integration review

STAFF-DWP EM experiment units for EM pre-integration Cluster DWP EM2, modified for Double Star. Cluster MWF EM. Cluster PWR EM. Intra-Experiment harness for above. Not included: STAFF-AMP and STAFF-ANT. A feedback connector is provided to simulate AMP and ANT during functional tests. 2002-08-27 Double Star STAFF-DWP EM pre-integration review

Double Star STAFF-DWP EM pre-integration review MWF - DWP - PWR 2002-08-27 Double Star STAFF-DWP EM pre-integration review

Double Star STAFF-DWP EM pre-integration review DWP - MWF - PWR 2002-08-27 Double Star STAFF-DWP EM pre-integration review

Deltas with respect to Double Star FM specification - DWP The modified Cluster DWP unit for EM pre-integration conforms to Double Star specification only in respect of the PDMS electrical interfaces, command and telemetry formats. The PEACE interface connector differs, although an adapter or compatible harness can be provided. The analog interface to MWF (J08) is not present, although a dummy connector is fitted and this data is simulated in the telemetry. The unit is not mechanically compatible with the Double Star specification. 2002-08-27 Double Star STAFF-DWP EM pre-integration review

Deltas with respect to Double Star FM specification - MWF The MWF EM unit is fully compatible with Double Star FM specification. However, it cannot be mechanically stacked with the Cluster DWP, so will be provided as a separate unit. 2002-08-27 Double Star STAFF-DWP EM pre-integration review

Deltas with respect to Double Star FM specification - PWR The PWR unit is compatible with Double Star FM specification for electrical and mechanical interfaces. The mass is somewhat reduced because radiation shielding required for Double Star is not present on this unit. 2002-08-27 Double Star STAFF-DWP EM pre-integration review

Deltas with respect to Double Star FM specification - harness The Intra-Experiment harness provided is of ‘bench test’ quality and is not representative of the flight harness. 2002-08-27 Double Star STAFF-DWP EM pre-integration review

Modifications relative to Cluster status - DWP Requires +/- 6V power for analog circuits (supplied by PWR). HK and Science telemetry block sizes changed. Minor changes to command parameters. New software for FFT spectrum analyser mode. Other Double Star modifications (mechanical interface, PEACE interface connector, MWF analog interface) are not implemented on the EM for pre-integration. 2002-08-27 Double Star STAFF-DWP EM pre-integration review

Modifications relative to Cluster status - MWF None. 2002-08-27 Double Star STAFF-DWP EM pre-integration review

Modifications relative to Cluster status - PWR The PWR for pre-integration is the Cluster EM with no modifications. Flight models have a modified lid to the enclosure to increase mechanical strength. 2002-08-27 Double Star STAFF-DWP EM pre-integration review

Modifications relative to Cluster status - harness The PWR to DWP harness is modified from Cluster specification to supply +/- 6V to DWP analog circuits. 2002-08-27 Double Star STAFF-DWP EM pre-integration review

Electrical test program The complete STAFF-DWP experiment for EM pre-integration has been tested prior to delivery using the simulator of the Cluster WEC testbed. Electrical interfaces to PDMS and PPD have been tested following the procedure defined by Roland Nord (based on the Cluster WEC integration procedure). A functional test has been performed following the IST/AFT procedure (these two tests are basically the same for STAFF). 2002-08-27 Double Star STAFF-DWP EM pre-integration review

Control file definition status - 1 Updated versions of control files provided to Imperial College on 26 July 2002. Further update supplied on 8 August as a result of ambiguity in CHECK syntax. Monitoring data base (HK parameters) updated during Beijing meeting, July 2002. 2002-08-27 Double Star STAFF-DWP EM pre-integration review

Control file definition status - 2 Control files are provided for IST, AFT, SFT and IEL tests, with separate versions of each for nominal and redundant interfaces (8 total). IST and AFT are the same except that AFT does not pause unless an error occurs. SFT and IEL are a reduced version of the same test. Files also provided for basic power ON/OFF functions, for use during electrical integrations. 2002-08-27 Double Star STAFF-DWP EM pre-integration review

Electrical test setup - block diagram 2002-08-27 Double Star STAFF-DWP EM pre-integration review

Electrical test setup (part of Cluster WEC testbed) 2002-08-27 Double Star STAFF-DWP EM pre-integration review

Interface verification test Electrical interface measurements performed on 25/26 July 2002. Results sent to CSSAR on 6 August, and included in ADP. DWP conforms to EID-A specification. PWR conforms to EID-A specification except for minor non-conformance in grounding of synchro shield - no consequence for pre-integration. OBDH simulator has several non-conformances from EID-A specification, but these should not invalidate measurements of experiment units. 2002-08-27 Double Star STAFF-DWP EM pre-integration review

Interface verification test - representative screen shots PWR inrush current Current J01.1 100mA/div Voltage J01.1 10V/div 2002-08-27 Double Star STAFF-DWP EM pre-integration review

Interface verification test - representative screen shots DWP HK telemetry bit pattern Tlm Data J10.3 2V/div Tlm Clock J10.5 2V/div 2002-08-27 Double Star STAFF-DWP EM pre-integration review

Double Star STAFF-DWP EM pre-integration review Bench level test A functional test has been performed following the IST/AFT procedure. Minor adjustments made to procedure to adapt to Cluster WEC TM formats. Full test printout and charts are included in ADP. Data available on ESTEC FTP server (archive file STAFF-DWP/data/T020805A.zip) Experiment is working correctly and is compatible with control files provided. 2002-08-27 Double Star STAFF-DWP EM pre-integration review

EGSE for pre-integration STAFF-DWP will require two network connections, one each for CETP and Sheffield. PARADISP software has been received from China, installed on DWP EGSE computer and verified using bench test data. We also plan to adapt our own EGSE software to listen to DITS multicast data. 2002-08-27 Double Star STAFF-DWP EM pre-integration review

Readiness for pre-integration The STAFF-DWP EM experiment is ready for pre-integration. 2002-08-27 Double Star STAFF-DWP EM pre-integration review

Outlook to FM status and schedule All flight units except for DWP and harnesses are available now. A DWP EM, fully compliant with Double Star specification is under development. Mechanical enclosure is being manufactured. Electronics design has been completed since January, but waiting for funding before manufacture starts. Software is complete except for driver for new interface (and installed in Cluster DWP EM for pre-integration). DWP FM delivery estimated at funding + 9 months. 2002-08-27 Double Star STAFF-DWP EM pre-integration review