Facilities, Assembly, Integration

Slides:



Advertisements
Similar presentations
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Advertisements

G.Barber Mice Tracker Integration Jun Tracker integration.
Accelerator Integration Design Integration Group [DIG] Apr. 2015
Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
Global Design Effort Compact Water Cooled Dump Resistor IRENG07 Wes Craddock September 19, 2007.
Disassemble, Assemble and Perform a Function Check on the M203
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
October 21, 2003LST Mechanical Design Review - SLACN. Yu BaBar IFR Upgrades An FEA Study of the Effects of Adding Brass Plates in the IFR.
May 4, 2004Bill Wisniewski1 Installation Review. May 4, 2004Bill Wisniewski2 Charge ( W. Althouse, G. Bowden, W. Innes(chair), J.Weisend, (D. Nelson))
Disassemble, Assemble and Perform a Function Check on the M9
Push Pull Considerations
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
Thomas Jefferson National Accelerator Facility Page 1 CD Workshop Dec 2-3, 2009 CLAS12 Central Detector Overview and Integration David Kashy Hall B Lead.
Site survey (hands-on). Configuration 1 A financial institution (part 1 - Headquarters) Position - 2 C F E B C F E E F No Communications Acceptable Poor.
Hall D Civil and Detector Progress Elliott Wolin 12-Sep-2002 U. Of Regina Middle of Nowhere Canada.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
August 6, 2007Bill Wisniewski1 D&D Task Force: PEPII team: S.DeBarger, S.Ecklund, A.Hill, D.Kharakh, M.Zurawel BaBar team: H.J.Krebs, S.Pierson, W.Wisniewski.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
An explosion ripped through Mexico's second-largest oil refinery on Saturday -- Tula produces 315,000 barrels per day -- causing a massive fire, killing.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
UF Telecom Standards Overview ITAC-Network Infrastructure Presented By John Madey Associate Director Computing & Networking Services Telecommunications.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
Aeronautical drafters prepare engineering drawings that detail plans and specifications used in the manufacture of aircraft, missiles, and related parts.
CB200 e Cabinet Extinguishant Control Panels Designed for cabinet extinguishant systems 2 zone extinguishant co-incidence operation Selectable discharge.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
Survey techniques for experiments and advanced 3 D Digital Reconstruction Aurelie Maurisset, Christophe Bault, Andrea Catinaccio October 1 st 2010 Ref.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
Source Page US:official&tbm=isch&tbnid=Mli6kxZ3HfiCRM:&imgrefurl=
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
This CD-ROM is STRICTLY for IN-DISTRIBUTOR and DEALER USE.
Layout of the Front-End Test Stand Ajit Kurup UK Neutrino Factory Meeting 12 th January 2005.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
Mobi Site Tutorial. Go To mobi.mytraceradmin.co.za.
May 31, 2010Bill Wisniewski1 Mechanical Integration Issues.
October 7, 2009H.J. Krebs1 Super B WorkShop Overview of BaBar Detector Assembly/Installation Documentation Jim Krebs.
Integration Prototype1 BaBar Integration as a Prototype for SuperB Bill Wisniewski SuperB Workshop at LNF 6 April 2011.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
Путешествуй со мной и узнаешь, где я сегодня побывал.
/ 11 Updates of PANDA 3D Model CM June 2016 at GSI, MEC Session J. Lühning, GSI Updates for: Panda Hall Target Spectrometer Latest version.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
October 6, 2009Bill Wisniewski1 State of drawings Remedies? Forward Region DIRC/DCH/EMC interplay Road Trip Discussion Beam pipe & forward cone plug ‘Quick’
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Experimental Hall in Mountain Regions
Integration meeting F.Raffaelli
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
Some Updates on Mechanics CM-MEC Session Dec J. Lühning, GSI
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
STRAW TRACKER SYSTEM CAD STATUS :
Target Spectrometer Updates CM-MEC Session Giessen, March 2015 J
cooling and supports of the forward endcap EMC
Bill Wisniewski SuperB Frascati Meeting September 30, 2010
Workshop Goals for the Detector Groups
Sub-Detector Assembly Area Summary of discussion at ALCW2015
Page 1. Page 2 Page 3 Page 4 Page 5 Page 6 Page 7.
GM Dealer Equipment Program
Integration and IR Hall
Undulator System Installation
The Civil War in Photos View the next 5 pages of actual photos (primary sources). Then respond to this question: Why are the photos so powerful in telling.
RDR Baseline Layouts for Interaction Region
SuperB Integration Summary of previous integration sessions.
Inner DET. Integration Inner detector envelope Radial clearances.
Magnet, Support and Infrastructure

SuperB Integration Summary of the Integration Status
For More Details:
Repairing the Electrical Components
Presentation transcript:

Facilities, Assembly, Integration Need to beef up the WP version to give details, as in BBR TDR. Facilities (include layout) (1-1.5 pages) Reuse of components (.5-1 page) Structural Support (1 page) Installation Use of hall space (1 page) IFR steel assembly (1 page) (include either CAD 3D or photos) Solenoid roll-in (1 page) (mention dump resistor, plant) Barrel EMC (1 page) (include CAD or photo) DIRC and horse collar (1-1.5 pages, needs thought for camera) DCH (1 page) (discussion of plug changes?) Forward EMC (.5 page) Vertex (2 pages) (need to discuss quick remove) Repair access (.5 page) Integration civil rules (.5 page) Services & cables (2-3 pages) Total ~15 pages Integration Session – QMUL 2011 1