THEMIS INSTRUMENT SUITE

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Tracker Subsystem1 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 GLAST LAT Tracker Tower7/9 Pre-Ship Review INFN-Pisa.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
THEMIS F2/F3 IPSR and F4/F5 IPER 1 By Telecon, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW Thermal.
THEMIS Instrument Suite PEREFI- 1 UCB, May 2, 2005 THEMIS Solid State Telescope (SST) Instrument Suite PER The THEMIS SST, IDPU and II&T Teams.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
MPSREFI- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW “Our Gateway to the Cape…” The Electric Field Instrument (EFI) John Bonnell University of California.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
FM4/FM5 PSRSCM - 1UCB, May 5 th, 2006 THEMIS FM4/FM5 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam University of.
THEMIS-SCM - PER THEMIS Instrument Suite PERSCM- 1 UCB, May 2, 2005 Search Coil Magnetometer Alain Roux, CETP.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
THEMIS SCM CDR MC VASSAL - 3D PLUS CETP 04/08/ Preamplifiers in 3D Technology EM manufacturing Part list and component Lot Acceptance Tests FM manufacturing.
FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THERMAL Chris Smith University.
THEMIS Instrument FM2/FM3 PERFGM 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Fluxgate Magnetometer (FGM) Dr Ellen Taylor.
THEMIS/SRR ESA- 1 UCB, 06/08/2003 THEMIS Electrostatic Analyzer (ESA) instrument David W. Curtis Space Sciences Laboratory University of California, Berkeley.
THEMIS SRR 1 UCB, June 8-9, 2003 Solid State Telescope Davin Larson SSL.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
THEMIS Instrument FM2/FM3 PERSystems- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review System Overview Ellen Taylor University.
FM1 Instrument Suite Pre-Ship Review (PSR)EFI- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) ELECTRIC FIELD INSTRUMENT John.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration and Test 2011 March 29 Dave Mitchell.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) MAGNETOMETER BOOMS Paul.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, SPF MAG Quarterly Report – June 2015 MAG FM1 electronics PCB assembled (see.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
FM2/FM3 IPSR AND FM4/FM5 IPERSYS - 1 UCB, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW SYSTEM OVERVIEW.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars.
FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 1 UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE-
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
THEMIS FM2/3 Instrument Suite PEREFI- 1 Telecon, Aug 30, 2005 THEMIS Instrument FM2/3 Pre-Environmental Review Electric Field Instrument (EFI) The THEMIS.
26th Oct 2006CAA cross cal meeting, MSSL RAPID Calibration Status RAPID team.
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
THEMIS INSTRUMENT SUITE
Solar Probe Plus – FIELDS Main Electronics Package
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
Bill Raynor Naval Research Lab
University of California - Berkeley
SPF MAG Quarterly Report – Feb 2015
FIELDS Mission Assurance Manager University of California, Berkeley
EIDP Status. Solar Probe Plus FIELDS Main Electronics Package iPSR Management Apr 10, 2017.
THEMIS INSTRUMENT SUITE FM4/FM5 PRE-ENVIRONMENTAL REVIEW
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
THEMIS Mission Assurance
Solar Probe Plus FIELDS V5 Mechanical Pre-Ship Review April 10, 2017
THEMIS Solid State Telescope Instrument (SST)
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
MISSION PRE-ENVIRONMENTAL REVIEW
THEMIS FM4/FM5 INSTRUMENT SUITE
0.0 Instrument Suite Name Presenter’s name
THEMIS MISSION PRE-SHIP REVIEW
CONTOUR NGIMS PRE-SHIP REVIEW
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
CRaTER Pre-Ship Review (I-PSR) Instrument Configuration Bob Goeke
Integration and Test Organization Chart
GLAST Large Area Telescope
Presentation transcript:

THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW INTRODUCTION Davin Larson SST Lead University of California - Berkeley

Outline Summary of SST Status at FM1 PSR FM1-5 Configuration by SN End-Item Data Package Final Test and Cal Results vs. Requirement Fulfillment Open Items

Status Current SST-DAP Status: FM1 - Delivered FM2 - Delivered FM3 - Delivered FM4 - Delivered FM5 - Delivered FM6 - Delivered (Needs memory test following conformal coating)

Status Current SST-Sensor Status: FM1 – (S01 & S02) Delivered FM2 - (S06 & S04) Delivered FM3 - (S05 & S10) Delivered FM4 - (S07 & S09) Delivered FM5 - (S11 & S12) Complete, Calibrated, awaiting delivery. FM6 - (S03 & S08) Refurbished, requires workmanship vibe.

Flight Configuration Current flight configuration of sensors and DAPs for all flight units.

FM1 EIDP: Sensors THEMIS SST Sensor: (Sensor1:Binder #33; Sensor2: Binder #34) Electrical Assembly Schematics Electrical Assembly Records Rework/Repair history Electrical test results QA signoffs Mechanical Assembly Mechanical drawings Vibration test results Thermal Vac test results Assembly Records. Special TVAC Acceptance Test Data.

FM1 EIDP: DAP THEMIS SST DAP: (Binder#2) Schematics Electrical Assembly Records Rework/Repair history Electrical test results QA signoffs

SST Vibration Testing (Pictures of Probe 2 units)

SST Acceptance Level Dynamic Test SST Serial Number Test Date Following Initial Build Retest Date (Rework/Redesign) 001, 002 13 Jan 05 Oct 11, 2005 (full-qual) 003, 004 22 Apr 05 Nov 4, 2005 (workmanship) 006, 008 June 13, 2005 007, 009 May 6 2005 Nov 7, 2005 011, 012 Nov 7 2005 Not needed 005, 010 Dec 13 2005

SST Acceptance Level Dynamic Test Per UCB THEMIS Document THM-SST-PRC-002 All 3 Axes Sine Survey, 0.5 G, 5 – 2000 Hz Sine Strength per Swales TM2430-RevD, 29 November 2004 Random Per Swales Document TM2430-RevD 12.51 G RMS 1 min duration per axis All Vibration Testing Performed at Quanta Laboratories Retesting (if required) ‘Workmanship Shake’ Validate any design changes following original Flight build shake Validate rework of any failures on previous vibration test Entire vibration protocol, single axis only Acceptance Sine Strength Specification SST Flight Unit Acceptance Level Random Specification

SST TVAC Testing SST Serial Number Test Date Following Initial Build Retest Date (Rework/Redesign) 001, 002 5 Jan 05 Not needed 003, 004 28 Apr 05 006, 008 Sept 7, 2005 Dec-3-2005 (sensor 6 only) 007, 009 May 25, 2005 not needed 011, 012 Dec 3 2005 005, 010 Dec 20, 2005 to Jan 11, 2006 (8 cycles)

Thermal Profile Procedure: THM-SST-PRC-003

SST -Magnetic cleanliness SST Magnetic Cleanliness Testing Status All units have been tested and are nominal.

SST -Magnetic cleanliness SST Sensor 07 All units have been tested and are nominal.

SST -Magnetic cleanliness SST Sensor 09

SST -Magnetic cleanliness SST Sensor 11

SST -Magnetic cleanliness SST Sensor 12

SST Requirements SST Mission Requirements Fulfillment: FM1 MR fulfillment noted in THEMIS Verification Matrix (see MSE Presentation) Integrated SST and component parts compliant with mission requirements

Open PFRs None

Recent PFRs PFR 169- Found poor ion energy response in 2 sensors. (S03 and S08). Found only in sensors that had undergone electron testing. Discovered that plasma discharges from the electron gun had inadvertently damaged adjacent ion detectors. (electron detectors where protected by foil that stopped all ions and never showed any damage.) Subsequent testing with the electron gun is done with the open (ion) detectors covered. Electron gun has also been refurbished. Swapped affected sensors with spares (S05 and S10). Replaced damaged open (ion) detectors in affected units. These are now the new spares. PFR is closed.

Results of Testing/Calibration Energy Threshold vs temperature measured and acceptable Energy resolution acceptable (<13 keV at 5C). Detector gain measured and is stable over temperature. Channel crosstalk measured and acceptable (<20 keV) Attenuator functions over full operational Temp range. Heater/Thermostat Functional at < -50 C *! Magnetic moments measured and deemed acceptable. End to End performance verified. (*!) Noise susceptibility from BAU is very low now