FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 1 UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE-

Similar presentations


Presentation on theme: "FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 1 UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE-"— Presentation transcript:

1 FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 1 UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL REVIEW (PER) INSTRUMENT DATA PROCESSING UNIT Michael Ludlam University of California - Berkeley

2 FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 2 UCB, November 10, 2005 Outline Summary of IDPU Status at FM2&3 PSR/ FM4&5 PER FM Configuration by SN End-Item Data Package, Summary Environmental Tests Summary FSW Status Engineering Change Notices RFAs PFR Status

3 FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 3 UCB, November 10, 2005 IDPU Status Requirements and Design: –No major changes to Requirements or Design since M-CDR –2 Engineering Change Notices since FM1 PSR (Discussed Below). Assembly and Test: –All 5 IDPUs have been successfully integrated. –FM2, FM3 have undergone final assembly, vibration, TVAC. –FM4, FM5 have undergone final assembly, require CPT with Suite and then then ready for environments. –FM1 has undergone environments successfully. It is currently disassembled while rework (ECNs, FGM Sensor Swap) is completed. Assembly will happen in 1 week. Requires a single axis workmanship vibration. –50% of FM6 (spare) boards are ready. Remaining boards very near completion. Integration will follow when full complement is ready.

4 FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 4 UCB, November 10, 2005 IDPU Configuration IDPU: DCB Software Prom Version: –Version 2.01. Current Code version 2.13 Actel Revisions: –Green box indicates part was programmed successfully

5 FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 5 UCB, November 10, 2005 IDPU End-Item Data Package (EIDP) The following items are part of the End Item Data Package for the IDPU Stored in the Instrument Bookcases Individual Boards – contains schematics, assembly instructions, bill of materials, test reports, connector mate/demate log, power log. LVPS Binder #6 PCB/FGE Binder #4 DCB/ETC Binder #3 DFB Binder #5 BEB Binder #1 DAP Binder #2 Integrated IDPU – contains test reports for integration of IDPU. IDPU Binder #17 Integrated Instrument Testing – contains test reports for instrument integration, connector mate/demate log for instrument integration and test, power log for instrument integration and test. Integration Binder #16 Flight Software Binder #38 ICDs are stored on the Themis FTP site. PFRs are stored on the Themis FTP site. Full mechanical drawings are stored on the PDMWorks Server.

6 FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 6 UCB, November 10, 2005 IDPU Vibration Vibration test carried out to specification SAI-TM-2430-RevD (Acc) Acceptance level vibration carried out 08/30/05 (FM2) and 09/01/05 (FM3). Test report located in IDPU EIDP Binder. Test Passed – verified by visual inspection and Instrument CPT. Rework on IDPU necessitated single axis Workmanship vibration on 11/04/05 for both FM2 and FM3. Vibration will be tested to same specification as FM1, FM2 & FM3 (SAI-TM- 2430-RevD (Acc)) FM2 & FM3 FM4 & FM5

7 FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 7 UCB, November 10, 2005 IDPU Thermal Vacuum 2 cycles of thermal vacuum run with IDPU/ESA Combination – includes hot and cold non-operational soaks at +65°C and -60°C. Operational temperatures are between +55°C and -40°C. Configuration includes SST sensors, FGM sensor, SCM preamp and EFI external EFI-GSE. Test report and As-Run LPT Procedures stored in the Instrument Integration binder #16. FM2 & FM3 FM4 & FM5 Thermal vacuum cycling will be the same as FM1, FM2 & FM3

8 FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 8 UCB, November 10, 2005 Software Change Requests VersionSCR IDDescriptionStatus V2.01SCR-01Change the ESA Mux Control register definitionV2.02 V2.01SCR-02Add PCB FPGA Reset to Safe ScriptV2.02 V2.01SCR-03Mode Change Command Scripts Should Force ExecutionV2.02 V2.01SCR-04ESA Initialization Script - Additional CommandV2.06 V2.01SCR-05BKG Telemetry Manager Calling Frequency IncreasedV2.02 V2.01SCR-06ESA Digital HSK Format Added to SOHV2.03 V2.01SCR-07ETC Digital HSK Read back Extended to 15 usecV2.06 V2.01SCR-08TM Should Periodically Reset Error Flags on HST RegisterV2.04 V2.01SCR-09SSR Must Account for TM FIFO Packet DelaysV2.05 V2.01SCR-10ETC ESA Cover and SST Attenuator Status ByteV2.05 V2.01SCR-11FGM APID 405 Faster Copy Routine UsedV2.07 V2.01SCR-12ESA HV INDICATOR IF CDI[A6]="BAD0"V2.07 V2.01SCR-13SST Sync CommandV2.08 V2.01SCR-14ACS Handle Invalid Sun Period ValuesV2.08 V2.01SCR-15ESA Analog HSK Needs to be 0-2.5V Range OnlyV2.08 V2.01SCR-16TM PLAY Command Checks if HST ActiveV2.09 V2.01SCR-17Add Bit Setting/Resetting Control of CDIV2.10 V2.01SCR-18EFI Filter (IFILTER1, 2) Read back into SOHV2.10 V2.01SCR-19EFI S/C Potential Calculation for SSTV2.10 V2.01SCR-20EFI 2100 Command Should Start DFB in Slow SVYV2.10 V2,01SCR-21FGM XYZ & Rate Codes Should be Added to HskV2.10 V2.01SCR-22Lower ESA/SST Cover Limit to 1.0VV2.10 V2.01SCR-23EFI Should Mask Low Rate Swap RegisterV2.10 V2.01SCR-24EFI BEB HSK should be LimitedV2.11 V2.01SCR-25ESA Initial Command List UpdateV2.12 V2.01SCR-26EFI 2100 Command Should Start DFB in Fast SVYV2.12 V2.01SCR-27SST Digital Housekeeping Process ChangeV2.12 V2.01SCR-28Automatic Selection of Filter for HousekeepingV2.13 V2.01SCR-29ETC TM Manager Allocated More Interrupt TimeV2.13 V2.01SCR-30ESA Initialization Script – Additional CommandV2.13 V2.01SCR-31EFI, ETC, FGM modules should disable packets when offNeed spec All change requests implemented in V2.13, except SCR-31. This primarily concerns dealing with packets after launch and does not affect functionality during I&T

9 FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 9 UCB, November 10, 2005 FSW Development Status Phase 3-4 Development Status & Plans (on ETU) Phase 3 & 4 software is being tested on the ETU. Once complete a software CPT will be performed on the ETU before it is tested on flight units. Version 2.13 is planned for instrument integration to probes.

10 FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 10 UCB, November 10, 2005 FSW Verification FSW Level 3 Requirements 205 Total Requirements 32 Met by Inspection (thm_fsw_011) 173 Test Requirements (6% remain to be tested)

11 FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 11 UCB, November 10, 2005 Two Engineering Changes to IDPU, both to the LVPS. ESA 28V Supply – Improvement to efficiency of supply was found to save ~700mW. Implemented on all LVPS boards. Thermal Qualification will be during FM4/FM5 TVAC, although lowering of power dissipation is a low risk. 2.5V Supply – High current draw on the 2.5V supply and drops across instrument switches on PCB caused concern for margin in this supply. A tight tolerance is required by the end user (Actels). Although the supply had worked well throughout all integration and environmental testing it was felt margin should be improved. This was achieved in two ways; (i)2.5V level was increased to 2.6V at LVPS. This has been used successfully on other missions using the same Actels. (ii)Instrument switch on PCB had impedance of 1 Ohm. A lower impedance FET was paralleled to this to give a total impedance of 85 mOhms. The lower impedance meant less voltage was dropped across switch and more was supplied to the instruments (FGM &SST). Implemented on all LVPS boards. Successful retest during integration of FM5 gave greater confidence of margin. Engineering Change Notices

12 FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 12 UCB, November 10, 2005 RFA from FM1 PSR Project Response: We tested FSW V2.10 with various packet minimums. Higher minimums eliminated packet header errors that occurred consistently with lower minimums. See details below. We have tested extensively with a version of LPT_TV_HOT.CMD that always produces packet header errors (ITM_ERRORS) on the ETU IDPU. The test version of the LPT_TV_HOT script (and sub-scripts) is like the original, except that it eliminates manual and unneeded steps to speed testing. We have used this with FSW versions 2.07 through 2.10. The script uses the default packet minimums of 4/4/10/10 (hex) for the EN/QL/SV/PB SSR segments. The script produces errors because it allocates ApIDs to SSR segments in a way that violates the ‘1%’ rule. No ITM_ERRORS occur when I run the same script with packet minimums of 20/20/40/40 or 8/8/20/20 (hex). These results support the explanation that packet header errors and absent packets are due to abnormal ApID/segment allocations and small packet minimum settings. Action Requested: If the problem represented by PFRs 45 and 65 is readily reproduced, run a test which produces the error, then change the “minimum packet” threshold and rerun the same test and confirm that the problem does not occur, so that you can better justify not addressing these problems.

13 FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 13 UCB, November 10, 2005 There are no open PFRs for the IDPU FM2 and FM3. Three Open PFRs presented at previous review (FM1 PSR) are now closed: PFR-045: Packet problem with ESA data & PFR-065: Packet problem during ‘continuous mode’. Both of these were found to be problem with the packet minimums in SSR memory. This has been changed and the scripts have been updated. Since then the problem has not been seen during testing. See RFA response above. PFR-056: Power disruption during CPT. The cause of the anomaly was tracked down to plugging in the SPB motor simulators into the SPB Enable connectors while power was applied to the instrument suite. This setup should not have been used. The instrument suite should be powered off prior to any mates/demates to any connectors. The procedures for the CPT and Boom Deploy scripts have been modified to incorporate this change. All future testing will be carried out in this manner. On all occasions the instruments have been retested after the anomaly and behaved nominally. Analysis of the housekeeping and data recorded at the time of the anomaly does not lead to concern of latent damage. PFR Status for FM2 & FM3

14 FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 14 UCB, November 10, 2005 PFR Status for FM2 & FM3

15 FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 15 UCB, November 10, 2005 FM4 & FM5 PFRs No Open PFRs on FM4 or FM5 for IDPU.

16 FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 16 UCB, November 10, 2005 PFRs Opened since FM1 PSR PFRs opened (and subsequently closed) since last review PFR-094 SST Attenuator Monitor reads invalid at hot – modification to FSW fixed in V2.12. PFR-099, PFR-113 Anomalous behavior by software caused by interrupt timing problem. Fixed in s/w version 2.13 PFR-100 DCB FM5 dropped short distance in packing case. Board fully inspected and no damage found. PFR-108 EEProm table not loading correctly. Table was uploaded again from GSE and error has not reoccurred. This is run each power on of the IDPU and will be spotted immediately if reoccurs. PFR is closed, but will reopen if seen again. PFR-111 Misconnection of MAG Boom GSE to instrument suite. No damage occurred or possible. PFR-114 PCB Unused Op-amp pins shorted together in design. No parts damage. All boards have been reworked. PFR-116 Command missing from ESA initialization table in FSW. Fixed in Version 2.13.

17 FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 17 UCB, November 10, 2005 Backup Backup Slides

18 FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 18 UCB, November 10, 2005 FSW Resources PROM/EEPROM PROM Functions EEPROM Load Uplink Support Deployments EEPROM/Uplink Compression Burst/Triggering Initialization Params Science Upgrades RESOURCE USAGE 96% PROM 48% RAM 50% EEPROM 51% CPU w/o Compression Compression Rate 4-6 Mb/minute

19 FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 19 UCB, November 10, 2005 CMP Status Compression Module Status Src: thm_fsw_001F Software Requirements Specification CMP Huffman and Delta Modulation compression has been verified on the ETU with the IDPU GSE encoding the original waveforms. CMP has been tested with Burst logic so that FSW can demonstrate compressing Bursts. Test Procedures which are complete are Green, Incomplete are Yellow.

20 FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 20 UCB, November 10, 2005 SCI Status Science Module Status Src: thm_fsw_001F Software Requirements Specification Test Procedures which are complete are Green, Incomplete are Yellow.

21 FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 21 UCB, November 10, 2005 SCI Status Science Module Status Src: thm_fsw_001F Software Requirements Specification Test Procedures which are complete are Green, Incomplete are Yellow.