Document Plan & Milestones WP7

Slides:



Advertisements
Similar presentations
Configuration Management
Advertisements

DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
New HV test specification for the LHC N. Catalan for the EI section.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
HL-LHC Quality management
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
TS, Length of YETS EYETS LIU & CONS Project
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
12/2/2004Module 2A1 The NCSX Engineering Web – An Overview Part I Work Planning, Project Files, Management Plans and Procedures.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
5 th Joint Hi-Lumi LHC-LARP Annual Meeting 2015 SC Link Protection A.Ballarino 28/10/2015.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
Thermosiphon project management and quality assurance EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
TE-MPE Workshop 14/12/2010, Manuel Dominguez, TE/MPE-EI 1 Nuria Catalan Lasheras, TE/MPE-EI REVIEW OF ELECTRICAL DRAWINGS FOR THE LHC SUPERCONDUCTING CIRCUITS.
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
D1/D2 Circuit Baseline Update Rationales for Baseline Discussion B. Auchmann, F. Rodriguez Mateos, A. Verweij, D. Wollmann CERN, TE-MPE.
Project Breakdown Structure Tracing changes to our different baselines I. Bejar Alonso and Project Office TCC – 14 th January 2016.
Review of the processes released in the framework of the MMP Goran Perinić.
TE-MPE participation on the GSI-CERN Collaboration for Testing Super-FRS's Superconducting Magnets (aka FAIR project) Daniel Calcoen Acknowledgements:
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
Database - How to keep BI information up to date? Samy Chemli on behalf of EN-MEF-DC.
Proposal: Use of ECRs for “Controls” Changes and Renovations Rende Steerenberg, Samy Chemli, Marine Gourber-Pace, Klaus Hanke, Verena Kain, Bettina Mikulec,
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Chapter 25 – Configuration Management 1Chapter 25 Configuration management.
Scope of PCP Phase 1: Solution Design of Q4 First-of-a-kind prototype QUACO Bid Conference, CERN, 07 th July 2016 Arnaud Foussat, CERN TE MSC-LMF Helene.
Brussels, January 16th, Overview and status of the project.
Crab Cavity Technical Coordination meeting:
Configuration Management
Cold mass design, assembly plans and QA/QC at CERN
HL-LHC IT STRING and Series test of SC link
D1 and D2 powering and protection
R. Denz, A. Gomez Alonso, AT-MEL-PM
Equipment simplified model SMR UR safety
Oct 22 Group Leaders Planning meeting
Software Configuration Management
The HL-LHC Circuits: Global View and Open Questions
Circuits description and requirements
Configuration Management
Configuration Management and Layout Database ELENA Project
International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock
Update on circuit protection simulations of the HL-LHC Inner Triplet circuit Matthias Mentink, Circuit specifics + STEAM simulations: Samer Yammine, LEDET.
Circuits description and requirements - Closed Session-
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
WP1 INERTIA Framework Requirements, Specifications and Architecture
Detailed global view on protection and detection of the circuits
Quench detection electronics for the HL-LHC magnet circuits of the LHC
Communication and Documentation Needs exemplified on WP 71
Validation & conformity testing
Request for Proposal (RFP)
TEST PLANS for HL LHC IT STRING
WP3 Meeting – December the 10th 2015 H. Prin
Control Hardware & Status
Chapter # 6 Software Configuration Management
A High Intensity Neutrino Oscillation Facility in Europe
Configuration Management
HL-LHC Quality management
ECR on pole order of the HL-LHC IT circuit and resulting implications
R. Denz, TE-MPE-EP Acknowledgements: J. Steckert
Presentation transcript:

Document Plan & Milestones WP7 R. Denz Acknowledgements: B. Auchmann, F. Rodriguez-Mateos, D. Wollmann, M. Zerlauth Conceptual Design Review of the Magnet Circuits for the HL-LHC 21-23 March 2016 CERN

Introduction Proper documentation is a fundamental part of any project and should be regarded as a deliverable of its own. This presentation focusses on the documentation for the HiLumi circuit protection. The timely delivery of the required documentation is essential. The quality and completeness of the documentation have a direct impact on the system dependability. Keeping all information up-to-date is self-evident but may require a significant effort.

HiLumi Circuit Protection Many actors involved in the circuit protection for HL-LHC Documentation supposed to be complete, coherent, up-to-date and approved

Deliverables & Actors For each circuit type an extensive set of documents is required : Detection specification (Mr. Circuit, WP 3, 6, 7,11) Heater design documentation (WP 3, 7, 11) Active protection specification (Mr. Circuit, WP 3, 6, 7,11) Specification of ELQA tests voltages (Mr. Circuit and WP 3, 6, 7, 11) PIC interface documentation (Mr. Circuit, WP 7) Bus-bar specification (Mr. Circuit, WP 3, 6, 7, 11) CLIQ, EE: reliability studies (Mr. Circuit, WP 7) Electric circuit diagram incl. instrumentation (Mr. Circuit, WP 3, 11, 15) Definition of instrumentation routing (Mr. Circuit and WP 3, 6, 11, 15)

Milestone / Document Plan Overview Part I: from R&D to Production 16Q1 Circuit & Protection Review Conceptual baseline update 16Q3 TDR V1 Conceptual baseline update Electrical drawings ECR (if applicable) 16Q3 Cost & Schedule Review Conceptual baseline update 17Q2 Protection R&D Documentation Mag. & Circuit Protection SC Link Protection ELQA Test Voltages Despite the sequential timeline many documents need to be created and processed in parallel. The functional specification been approved, design changes are still possible but by far more difficult to implement. 17Q4 Functional Specification Quench detection Heater powering CLIQ PC protection 17Q3 TDR V2 Functional spec. 17Q3 Cost & Schedule Review Functional spec. 18Q2 Eng. Spec. Quench detection Heater powering CLIQ PC protection Interfaces

Milestone / Document Plan Overview Part II: from Production to Operation Managed by sub-system owners Timeline still to be finalized Same sequence for the IT-String Some documentation (test procedures, manuals) not yet standardized Production Readiness Reviews Technical Specifications Tender & Production Test Procedures Acceptance tests Individual system tests etc. Delivery & Installation Managed by HC/MP3 Hardware commissioning procedures (WP16) Hardware commissioning Review (WP16) Operational & service manuals Hardware commissioning (WP16) Operation

Protection R&D Documentation New document type proposed and elaborated by Bernhard Auchmann Essential for understanding the choice of solution selection of components etc. Will ease further upgrades and trouble shooting To be maintained throughout the LHC lifetime Helps to ensure traceability of design project knowledge Not really existing for LHC Private communication, hard-disks etc., folders ... The partially lost minutes of the former EEWG is a “famous” example

Protection R&D Documentation The document is to be versioned on EDMS and supplemented by numerical data from measurements and simulations for long-term reference and comparison.

Status and Next Steps Current review expected to validate baseline choices Many R&D milestones have been already achieved and a large amount of work has been done. All relevant information needs to be harvested and compiled into the “Protection R&D Documentation” Developers, test engineers etc. to be contacted soon Documents supposed to be completed by the end of the year Preparation of functional specifications