Global Design Effort - CFS 13 December 2012 PAC Review - KEK 1 PAC Review CONVENTIONAL FACILITIES AND SITING A. Enomoto, V. Kuchler, J. Osborne.
Advertisements

Nov. 17, 2008 ILC08 Global Design Effort 1 Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius.
Nov. 07 DR-KOM-CFS 1 Damping Rings KOM Conventional Facility & Siting Overview Tom Lackowski Acknowledgment: Atsushi Enomoto, Jean-Luc Baldy, John Osborne,
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
November 17, 2008 ILC08 HVAC and VE Update November 17, 2008 ILC CFS Workshop 2008 Chicago Lee Hammond, Fermilab Global Design Effort.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
Global Design Effort - CFS LCWS10 CFS Parallel Sessions 1 LCWS10 Americas Region Life Safety ILC CONVENTIONAL FACILITIES AND SITING GROUP V. Kuchler.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
1 ILC Mechanical & Electrical Review Conventional MECHANICAL System Design Summary Emil Huedem, FNAL Lee Hammond, FNAL Parsons Mechanical Team (Tim Sheehan,
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 HVAC OVERVIEW and VALUE ENGINEERING ITEMS August 13, 2008 CLIC Working Group CES Lee Hammond, Fermilab.
Value Engineering Session Air Treatment / HVAC November 27, 2007 Lee Hammond, FNAL CFS.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
1 Process Water and Air Treatment 01 June 2007 Emil Huedem, Maurice Ball, Lee Hammond Fermilab.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
SLAC_OCT07 BDS-KOM-CFS 1 Beam Delivery System & Interaction Region KOM Conventional Facility & Siting Overview Fred Asiri/SLAC Acknowledgment: Atsushi.
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Nick Walker for the Project Management ILC AD&I: Introduction and Overview.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
DR Layout Description ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
Aug 23, 2006 Low Power HLRF System and Impact on Distributed RF System Shigeki Fukuda and Task Force Team of DRFS in KEK KEK.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May ML Single Tunnel Configurations In Deep Underground Accessed with Long.
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
CFS EDR KICK OFF MEETING Air Treatment August 23, 2007 Lee Hammond, FNAL CFS.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
Conventional Facilities and Siting Global Group (ARCFS)
CLIC Civil Engineering Update
Conventional Facility & Siting (CF&S) Overview for the Positron Source
CFS EDR KICK OFF MEETING Process Water August 23, 2007
LCWS11 AWG9 PARALLEL SESSION SUMMARY
CONVENTIONAL FACILITIES presented by Peter H. Garbincius
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
ILC CFS AD&I Daresbury Lab Summary
Tom Lackowski Revised 10/12/2011
ILC Cryogenics -- Technical Design Report Planning
ILC - Global Design Effort
Presentation transcript:

Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius Nov. 17, 2008 ILC08 Global Design Effort

Agenda Afternoon Sessions - Klystron Cluster Design   Session Description: This session will be used to review the Klystron Cluster alternative for HLRF equipment distribution and its impact on CFS regional design options. Current work to date will be presented. It is intended that representatives from Working Group 1 as well as representatives of the HLRF and LLRF efforts will participate in this session. Session Objective: Establish an understanding within the technical groups of the CFS design and cost savings associated with this Klystron Cluster alternative. 13:30 – 14:15 Overview from FNAL (T. Lackowski) 14;15 – 15:00 Overview from KEK (A. Enomoto) 15:00 – 15:45 Overview of HVAC for Single Tunnel (L. Hammond) 15:45 – 17:00 Overview of Cost Impact (P. Garbincius) 17:00 – 18:00 Discussion Nov. 17, 2008 ILC08 Global Design Effort

August ‘08 we were introduced to the KlyCluster concept of RF distribution. September ’08 we were requested to develop a cost analysis of KlyCluster compared to the RDR cost. Cost Analysis addressed only the Main Linac Employed the tools developed for the RDR cost estimating to make the analysis. Used Americas Basis of estimate Nov. 17, 2008 ILC08 Global Design Effort

Bullet List Subtractions, Changes, and additions were identified for each WBS of the Main Linac estimate. Nov. 17, 2008 ILC08 Global Design Effort

Cost Comparison Methodology and Scope The Americas RDR Main Linac Estimate was used as the basis for the comparison. The site independent WBS sections (Electrical, Safety, Handling Equipment, and Survey and Alignment) are included and have been considered. The RDR unit costs used in the comparison estimate. Nov. 17, 2008 ILC08 Global Design Effort

Main Linac Configuration Four shafts added for RF Waveguides. Nov. 17, 2008 ILC08 Global Design Effort

The cost estimate was revised @ the lowest level of the RDR estimate, using the same back-up pricing details. Nov. 17, 2008 ILC08 Global Design Effort

Major Civil Changes Civil cost reduced by 28% (relative to Main Linac) + Added four; 3 meter diameter shafts + Added four (4) sites +Added eight (8) full and 2 half buildings for housing KLY Cluster and rack equipment. - Eliminated Service Tunnel: Maintained 4.5 meter tunnel Diameter + Added 28 Refuge Areas - Reduced caverns volumes by 25% (comparison made using a corrected excavated volume for caverns) Nov. 17, 2008 ILC08 Global Design Effort

Revised Tunnel Cross Section Nov. 17, 2008 ILC08 Global Design Effort

RF Building Layout Nov. 17, 2008 ILC08 Global Design Effort

Life Safety Analysis NFPA 520-2005 (Subterranean Spaces) Prescribes 2 paths of travel to an exit or refuge area. The travel distance to be less than 610 meters. Nov. 17, 2008 ILC08 Global Design Effort

Areas of Refuge Using the new shafts needed for the RF as exits, one area of refuge is required between shafts. Additional alcoves included for electrical switchgear, transformers and racks. Nov. 17, 2008 ILC08 Global Design Effort

Area of Refuge Nov. 17, 2008 ILC08 Global Design Effort

Air Treatment and Process Water Air Treatment increased by 25% + Added HVAC for the 4 additional shafts - Eliminated tunnel fan coils Process Water decreased by 54% - Eliminated chilled water + Reduced diameter of tunnel process piping but used stainless to distribute LCW -- Eliminated tunnel LCW Skids Nov. 17, 2008 ILC08 Global Design Effort

Process Water Plants Nov. 17, 2008 ILC08 Global Design Effort

Kly Cluster Scheme Process Water System RF in surface 68.6 KW per RF@ 48F DT (C.A. Email 7/21/08) Rough Costing of Kly Cluster Aug 15 -21 2008 Per RF Heat Load=Used loads & DT from C.A. emails Placeholder on the Kly distribution Terminate with valve to RF pipe Negligible 1KW heat load to air from rack (email J.C. 8/13/08)=No air cooling in tunnel All air cooling in surface (see Lee’s air treatment) RF Pipe in Shaft 30 KW ea@ 21.6F DT (C.A. Email 7/21/08) RF Pipe 4 KW @ 21.6F DT (C.A. Email 7/21/08) Loads/Circulators 38KW per RF@ 36F DT (C.A. Email 7/29/08) Nov. 17, 2008 ILC08 Global Design Effort

Surface RF Loads Used for Costing Nov. 17, 2008 ILC08 Global Design Effort

Surface RF Loads (updated) Nov. 17, 2008 ILC08 Nov. 17, 2008 ILC08 Global Design Effort

Overall Main Linac Air Flow Nov. 17, 2008 ILC08 Global Design Effort

Tunnel Air Flow Normal air flow and fire air flow below Nov. 17, 2008 ILC08 Global Design Effort

Other Areas Electrical reduced by 25% - Judgment used, reasoning that the electrical distribution reduced with KLY cluster scheme; elimination of Service Tunnel electrical distribution. Piped Utilities increased by 370% due to automatic fire suppression in Beam Tunnel (NFPA 520 requirements for single tunnel) Reduced Safety Equipment by 20% - Eliminate potable fire suppression units. Nov. 17, 2008 ILC08 Global Design Effort

Summary Functional Requirements used in the RDR have been maintained. Life Safety further study. Changes in the costs are a reflection of the KLY Cluster scheme only; potential savings from other value engineering ideas have not be incorporated. corresponds to -4.9% savings wrt ILC RDR est Nov. 17, 2008 ILC08 Global Design Effort

RF System Modifications Estimates from Chris Adolphsen, July 28, 2008 300 MW RF pipe: 1,370 meter per 30 RF units (PHG geometric guess) – scale to 560 RF units adds + 0.4% wrt total ILC RDR estimate Coaxial RF Couplers: scale to 560 RF units adds + 0.2% wrt total ILC RDR estimate Subtract: 22 m WR 650 waveguide per RF unit Ray Larsen: subtracts - 0.05% wrt ILC est Summing CFS + RF => - 4.4 % savings wrt to Americas’ ILC RDR est. Nov. 17, 2008 ILC08 Global Design Effort

Peter’s final comments: Similar considerations apply to the RTML CF&S and RF components => - 4.6 % Need better estimates for the RF pipe and coaxial couplers If ILC can live with single tunnel for ML, ILC can probably live with single tunnel almost everywhere This is example of a “what-if” feasibility study providing an order of magnitude impact in order to decide whether proof-of-principle R&D is worth potential savings Nov. 17, 2008 ILC08 Global Design Effort