Preview of Access Processes for Working at SURF

Slides:



Advertisements
Similar presentations
Site Safety Plans PFN ME 35B.
Advertisements

Emergency Preparedness and Response
CLOW WATER Contractor Orientation April
Job Loss Analysis Overview
Hazard identification and Risk assessment
Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL W912DY-08-D-0020 TO 0012 Pre Construction Meeting Pre Construction Meeting.
DRAFT Annual Industrial Fire School Site/Class Safety Plan Discussion.
LAUSD INJURY AND ILLNESS PREVENTION PROGRAM FOR SUPERVISORS AND EMPLOYEES As required by California Code of Regulations, Title 8, Section 3203.
TRAINING AND DRILLS. Training and Drills Ensure A comprehensive, coordinated, and documented program as an integral part of the emergency management program.
Visual 5.1 Briefings Unit 5: Briefings. Visual 5.2 Briefings  Describe components of field, staff, and section briefings/meetings.  Plan to give an.
Permit to Work Procedure Document Number: KOC.SA.004
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
BUILD WITH US. ™ Contractors
Module 3: PPE 3.3 Training Susan Harwood Grant Number SH F-23.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Safety & Project Management by NABEEH JUM’AH. Eye on Safety  Proactive  Reactive.
Rev:01 Visitor Induction Rail Health, Safety & Environmental “Name of Project” 1.
Nov Readiness Review Course Implementation Plan - Mod 8 Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification.
1-1 Roles and Responsibilities. 1-2 Module Objectives  Recognize the roles of LEOs and others in work zones  List LEO responsibilities and expectations.
New Employee Orientation Job Hazard Analysis (JHA)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Permit-Required Confined Spaces 29 CFR
Permit-Required Confined Spaces 29 CFR Why Comply???? Confined space entry is a leading cause of occupational fatalities in this country.
Hot Work Procedure and Permit
HBR Best Practices Seminar Presented by CertifiedSafety Brady’s Landing June 30, 2005.
Know Your Vendors. Set standards and requirements for everyone entering your facility to protect: Employees Consultants Physical Property PatientsVisitors.
Jim Smith CONFINED SPACE Understanding the Space Park Requirements.
NEW TANK REPAIR PRODUCTS INSPECTION COATING Global AST Solutions Provider Since Personal Safety Awareness Initiative.
ASPEC January 2015 Incidents –0 incidents, 0 near misses Hours 27/12/14-30/01/15 13% Site, 1% Travel, 86% Office ASPEC QSHR January 2015 Minutes.
Outreach Training Program General Industry Procedures Directorate of Training and Education Revised April 2011.
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Permit-Required Confined Spaces 29 CFR
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
Duties of the Resident Inspectors at the Texas Low- Level Radioactive Waste Disposal Facility in Andrews County Diane Wakefield, Health Physicist, Resident.
Hot Work Permit Osan AB Fire Emergency Services.
Audits & DOE Walkthroughs ISO and OHSAS surveillance audits August 18 th – 20 th –CD, ESH&Q, and FESS organizations to be audited Software.
ES&H Roles and Responsibilities Jack Cassidy Construction Management and Safety 14 August 2014.
Global Marketing Managing Safe Work Practices Process
Strategic National Stockpile Points of Dispensing (PODs)
ORIENTATION - CONTRACTOR SAFETY REQUIREMENTS TEMPLATE TRAINING PROGRAM CUSTOMIZE TO RAILROAD See associated document called: “Contractor Safety.
10/1/2016Construction Management and Safety1 ES&H Roles and Responsibilities.
LCLS-II ES&H Requirements: Subcontractors
Environmental, Safety, and Health
Cessco Fabrication & Engineering Ltd.
Installation Procurement Package
Health and Safety Self Assurance Toolkit 2017
Some arrangements for personnel safety 1- Procedures for access
Pre-Job Briefings Continuing Education First Quarter 2017 Part 1
Safety in Construction and Upgrade Phases
Vessels and Facilities that are Temporarily Out of Service or Laid-up
The ORR/RA Pre-Visit and Other Prior Planning Items May 2005 Revision
Risk management - HIRAC awareness presentation
Outreach Training Program General Industry
Outreach Training Program Maritime Industry
Contractor Control system
PPE Program 29 CFR OSHA requirement for this company to have a Personal Protective Equipment Program to protect employees from exposure to.
2018 Contractor Safety Training What's New – What's Hot
Logistics Solutions for the Warfighter
Confined Space (Permit-required)
Safety is part of our culture at Halliburton
Gulfstream Permitting
Understanding the Space Park Requirements
Crane Operators Association of Bermuda
Safety & Health Programs
Safety & Health Programs
Ian Evans SSRL Safety Office
Safety & Health Programs
DOE Review of the LCLS Project October 2006
LAUSD INJURY AND ILLNESS PREVENTION PROGRAM FOR SUPERVISORS AND EMPLOYEES As required by California Code of Regulations, Title 8, Section 3203.
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Preview of Access Processes for Working at SURF Complete the FNAL ID Card Application form FNAL & SURF ID Badging Complete SURF Site Orientation Modules Training SURF Site Orientation – Surface SURF Site Orientation – Underground SURF Modified Underground Guide LBNF/DUNE ESH Introduction Video Apply for badge from the SURF Administrative Services Office Complete SURF badge request form Tobacco and Drug/Alcohol Free Property Tobacco products are NOT allowed to be used on property, includes but not limited to: Cigarettes, Cigars, Smokeless Tobacco, snuff, etc… 08.23-24.17 LBNF Project Team | LBNF/DUNE FS Interface Meeting

Fermilab ID Application Form 08.23-24.17 LBNF Project Team | LBNF/DUNE FS Interface Meeting

SURF Modified Underground Guide Training Requirements 24 hours of training Includes site specific “walks” All Superintendents, Foremen, Supervision Responsible for working groups UG Underground guide specific requirements Emergency Communications Emergency Planning/Response Ventilation flow paths Evacuation plan, routes, Area of Refuge Specific travel ways UG for LBNF/DUNE Facility specific hazards within easement space 08.23-24.17 LBNF Project Team | LBNF/DUNE FS Interface Meeting

Personnel Protective Equipment Requirements Hard hats – shall meet the ANSI Z89.1 & high voltage electrical work shall meet ANSI Z89.2. Hard hats should be marked with the appropriate designation Safety glasses with side shields – shall meet ANSI Z87.1 High visibility reflective garment – minimum ANSI Class 2 Gloves Suitable work clothing – minimum shall be short (1/4 length) sleeved shirt, long trousers, & safety toes boots providing ankle protection meeting ANSI Z41 No canvas, tennis, or deck shoes permitted in construction subcontract work area Cap lamp with battery & charging station (underground) MSA W-65 self rescuer – inspection program needed (underground) 08.23-24.17 LBNF Project Team | LBNF/DUNE FS Interface Meeting

Task based hazard analysis documentation Daily Work Planning Task based hazard analysis documentation Reviewed & accepted by CERN Gilmos Reviewed by LBNF ESH Coordinator Safety Data Sheets (SDS) Submitted to LBNF Far Site ESH Coordinator for submission to SURF ESH Department Burn/Hot Work Permits Utilize SURF hot work permit system Submitted to LBNF Far Site ESH Coordinator for approval by SURF 08.29-30.17 Mike Andrews | Environmental, Safety, and Health

Daily Work Planning Meetings Meeting held at the beginning of shift Attended by all personnel working onsite that day Meeting led by primary supervisor/Glimos Duration of the meeting approximately 10-15 minutes at minimum Each sub contractor foreman/work group lead to discussion work activities & locations for that day along with a summary of hazards Discuss deliveries of equipment & materials to the site ESH Manager to discuss any ESH issues & reinforcing ESH program Reminding work force to follow their HA’s & update as needed Feedback from work force 08.29-30.17 Mike Andrews | Environmental, Safety, and Health

Work Planning & Hazard Analysis Job site walk down-inspection of the job site should be conducted prior to developing the hazard analysis in order to assure all job site hazards and work control issues are identified and addressed Develop Hazard Analysis - catalogues potential hazards in all phases of project, and provides a solid basis for project design, planning, and execution Pre-job briefings- Dialogue between supervisor and crew to ensure that all understand the scope of what is to be accomplished, procedural steps, roles and responsibilities, and hazards and controls. Perform work- within controls in Hazard Analysis Post job review- After the activity has been completed, the HA should be updated to include improvements that were identified while performing the work. This will help assure better planning and a safer work experience the next time the job is performed. Jobsite walk down Post Job Review Perform Work Within Controls Pre Job Briefing Develop Hazard Analysis 08.29-30.17 Mike Andrews | Environmental, Safety, and Health

CERN ESH Oversight on all shifts Project ESH Oversight CERN ESH Oversight on all shifts Daily ESH oversight by the CERN Gilmos Verify flowdown of ESH requirements to sub subcontractors LBNF Project Daily Oversight ESH Coordinator, Deputy Project Manager, Engineering Support ESH coordination & walkthroughs External walkthroughs on a Monthly/Quarterly basis SURF ESH Department Fermilab ESHQ Section Department of Energy Fermilab Site Office SD Office of Risk Management 08.29-30.17 Mike Andrews | Environmental, Safety, and Health