HFM Test Station Main Cryostat

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
Vacuum Vessel Production Readiness Review
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
2 Technical seminar - 5 th June 2014 Vincent Roger - TE-MSC-TF.
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
1 11/11/2003 NBI Decay Tube and Windows Presentation by Ans Pardons 1 Decay Tube & Windows Introduction (Location, Planning) Decay Tube Entrance.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
HOW THE DUMP RESISTOR’S TANK LOOKS LIKE COOLING OF THE LHC ENERGY EXTRACTION RESISTORS G. Peón (ST/CV), K. Dahlerup-Petersen, G. Coelingh (AT/MEL) Air.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Inner Triplet Review Q1, Q2, and Q3 Mechanics T. Nicol April 24-25, 2007.
Agenda – Basics of cavity integration into CAST Introduction (M Davenport) Information exchange 2016 – Vacuum in cold bore – 2 cavities Cooling RF Cavities.
Readiness of test stations for design validation Marta Bajko on behalf of the TE-MSC TF team CERN, 11 th December 2014 QXF design review, CERN.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Cavity support scheme options Thomas Jones 25/06/15 1.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
The integration of 420 m detectors into the LHC
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
SPS High Energy LSS5 Thermal contact & cooling aspects
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Final Design Cryogenic and mechanical configurations
Design ideas for a cos(2q) magnet
Teleconf ACS – FREIA 28th March 2017
CERN – Zanon discussions
MQXC Nb-Ti 120mm 120T/m 2m models
IT-4189 Supply and installation of a cryogenic distribution system
Ti/SS transitions A.Basti INFN-PISA*
Fiber optic sensors integration in magnets and in test facilities
LEP cryostat Procurement strategy and plans
Proximity Cryogenics P&IDs meeting
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Teleconference ACS – FREIA 18th April 2017
Leak Detection Tutorial Work
Teleconference ACS – FREIA 10th May 2017
Cryostat design Mechanical design: Thermal screens: Specifications:
LARP Vertical Test Facility
CERN Cryomodule Requirements for Crab Cavities
Design of Distribution Feedbox at LHC P7
Block 4 and Cluster D - Safety
Cryostat design Mechanical design: Thermal screens: Specifications:
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
TEST PLANS for HL LHC IT STRING
FRESCA Cryostats Outer cryostat during pressure test at the manufacturer Top plate and lambda plate for the outer cryostat Inner cryostat during reception.
ESS elliptical cryomodule
Teleconference ACS – FREIA 19th June 2017
UPPSALA UNIVERSITY_GERSEMI PROJECT
Magnetic shielding and thermal shielding
Review Bloc 4 and SM18 facilities and upgrade
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

HFM Test Station Main Cryostat Arnaud Vande Craen (TE-MSC) HFM Test Station Main Cryostat TE-MSC-CMI – Section Meeting 19/02/2013 19/02/2013

Summary Introduction Concept Design 19/02/2013

Introduction 19/02/2013

What ? High Field Magnet Test Station Vertical Cryostat Temperature : 1.9 K Maximum pressure : 5 bar As much polyvalent as possible 19/02/2013

Why ? 19/02/2013

Why ? (2) FRESCA 2 Magnet Up to Nb3Sn strands Maximum current : 20 kA 2.5 m long 1.5 m diameter 8 tons Nb3Sn strands Maximum current : 20 kA Maximum field : 13 T (LHC ≈ 8.3T) 19/02/2013

Why ? (3) Large cryostat for magnet test Polyvalent FRESCA 2 (CERN) HTS dipole insert (CERN) LD1 (Berkeley) Temperature control (cool down) Magnet sensitive to strain Maximum current test Field analysis (future) Quench Protection Detection Analysis 19/02/2013

How ? Main cryostat Valve box Cold buffer 2 power supply Magnet cool down Magnet powering Valve box Cryogenic control Cold buffer Store helium in case of quench 2 power supply Main magnet (20 kA) Insert magnet (10 kA) 19/02/2013

How ? (2) Cold buffer Main cryostat Valve box 19/02/2013

Where ? (1) Vertical test benches Horizontal test benches 19/02/2013

Where ? (2) Cold buffer 20 kA power Converter Dump Resistor Cryogenic Control Cryogenic rack Control Room Valve box Pumping line HFM cryostat 10 kA power Converter Installed 19/02/2013

Concept 19/02/2013

Philosophy Vertical test station Easy magnet insertion Easy electrical connection Current leads Instrumentation Limit cryogenic connections during magnet insertion No dedicated helium vessel for magnet 19/02/2013

Principle Claudet bath Helium @ 1 bar Helium @ 16 mbar 4.2 K – 300 K 1.9 K (controlled) Helium @ 16 mbar 1.8 K 19/02/2013

Concept (1) Neck Lambda plate Lower volume Heat exchanger 1 2 3 4 19/02/2013

Concept (2) Vacuum vessel Helium vessel Magnet Lambda plate Top plate Supported by brackets Helium vessel Hanging to top cover Magnet Hanging to lambda plate Lambda plate Hanging to top plate Top plate Fixed to top cover 19/02/2013

Design 19/02/2013

Vacuum vessel Dimensions Stainless steel (304L) Conical cover 4.6 m height 2.3 m diameter 4.8 tons Stainless steel (304L) Conical cover 3 supports Static vacuum 19/02/2013

Vacuum vessel (2) Conical cover Vacuum vessel protection Jumper Support magnet weight Limit deformation Vacuum vessel protection Burst disk (DN200) Exhaust line (DN300) Jumper Connection to valve box Regroup all cryogenic lines 19/02/2013

Helium vessel Neck Lower volume Max pressure : 5 bar 300K 3 mm thick 1.6 m diameter 1.6 m long Thermalisation (limit heat in leak) Lower volume 6 mm thick 1.5 m diameter 2.5 m long Max pressure : 5 bar 300K 4.2K 1.9K 19/02/2013

Helium vessel (2) Jumper Fixed point Thermalisation Regroup all lines Avoid lines movement Thermalisation Welded ? Brazed ? 19/02/2013

Helium vessel (3) Heat exchanger Copper tube brazed to stainless steel tube U shape welded to flange (30 x) Closed box to pump Cooling power ≈ 100 W @ 1.9K (1.5 day Cool-Down) 19/02/2013

Thermal shield Actively cooled Supported from top cover Stainless steel structure Copper Sheet Pipe brazed 19/02/2013

Insert Top plate Radiative screens Lambda plate (50 mm thick) Current leads (20 kA & 10 kA) Instrumentation Radiative screens Limit heat in leak Lambda plate (50 mm thick) Stainless steel Lambda valve Splices Mechanical support Lambda plate to top plate Magnet (15 tons) to lambda plate 19/02/2013