NICET Fire Alarm Tech Level 1 Practice Test

Slides:



Advertisements
Similar presentations
Denver Fire Alarm Test FUNDAMENTAL, POWER SUPPLIES, CIRCUITS, INSPECTIONS, TESTING and MAINTENANCE.
Advertisements

Initiating Devices Manual Fire Alarm Boxes Ionization Smoke Detectors
Denver Fire Alarm Test Preparation Speed Drill © Ted Smitty Smith 2013.
NFPA 72 - National Fire Alarm Code Chapter 4 - Notification Appliances
NFPA 72 and NFPA 101 Supervised Automatic Sprinkler System Overview
NFPA National Fire Alarm & Signaling Code
Ted “Smitty” Smith  I have included in the following slides some key sections from each of the codes you will primarily encounter on the test. I recommend.
Inspection and Testing of Fire Alarm Systems (ITFAS)
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
FIRE ALARM SYSTEMS AND FUNDAMENTALS
WELCOME DBI & SFFD Meet the Pros October 11, 2007.
Ted “Smitty” Smith  This slide show contains multiple timed questions. All questions can be answered using the International Fire Code, The National.
Chapter 14: Inspection and Maintenance
2014 CHANGES TWO MINUTE DRILL COPYRIGHT TED “SMITTY” SMITH ©2014.
© 2012 Ted “Smitty” Smith  This slide show contains multiple timed questions. All questions can be answered using the International Fire Code and the.
Two Minute Drill #8 Copyright 2005 Ted "Smitty" Smith Practice Code Look Up.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Two Minute Drill #9 Copyright 2005 Ted "Smitty" Smith.
© 2008 Delmar, Cengage Learning Property Security, Emergency Response, and Fire Protection Systems Chapter 13.
Smitty’s Speed Drills 2008 Code Drills Health Care Facilities (C) Copyright 2008 Ted "Smitty" Smith1.
Copyright 2008 Ted "Smitty" Smith.  Left click on the presentation ICON located at the bottom of the slide directory to the left of the this slide. 
©Ted “Smitty” Smith This speed drill focuses on subjects that will be required for the journeyman and masters examination arranged by chapter of.
MINNESOTA CHAPTER AUTOMATIC FIRE ALARM ASSOCIATION Requirements of the 2003 Minnesota State Fire Code relating to Group R Occupancies September 14, 2006.
2008 Code Drills (C) Copyright 2008 Ted "Smitty" Smith 1 Smitty’s Speed Drills.
Maine State Fire Marshals Office1 Laws and Codes Relating to Existing Apartment occupancies in the State of Maine Mark Stevens CFI-II, CFPS, CFPE Inspections.
Presented by John Lewandowski and Mike Larabel Inspection, Testing, and Maintenance of Kitchen Hood Systems Michigan Fire Inspectors Society Winter Educational.
Fire Alarm Verification CAN/ULC-S561-03
Carbon Monoxide Detection: Code and Legislation Updates
Fire Protection Systems Chapter 9 IBC 9th Edition Amendments
2011 Changes Two Minute Drill
Smitty’s Two Minute Drills
Proposed Changes to the 2009 International Building & Fire Codes
NICET Fire Alarm Tech Level 1 Practice Test # 4
PRC Implementation Plan and Summary of Devices
Smitty’s Two Minute Drill Overcurrent Protection
NICET Fire Alarm Tech Level 1 Practice Test # 9
Fire Alarm Systems for Emergency Operations of Elevators
NICET Fire Alarm Tech Level 1 Practice Test # 6
Smitty’s Two Minute Drill Mixed Content -05
Smitty’s Two Minute Drill #9: Special Occupancies
NICET Fire Alarm Tech Level 1 Practice Test # 13
Smitty’s Super Speed Drill for Memorization No. 2
NICET Fire Alarm Tech Level 1 Practice Test # 2
NICET Fire Alarm Tech Level 1 Practice Test # 3
Calculations: Transformers and Service Conductor Calculations
Smitty’s Super Speed Drill for Memorization No
NICET Fire Alarm Tech Level 1 Practice Test # 10
Smitty’s Two Minute Drill #1: Feeders and Branch Circuits
General Requirements of NFPA 101
Smitty’s Two Minute Drill Photovoltaic Systems
2014 Changes Two Minute Drill
Presented by: Tim Knisely
Fire Alarm Tech Practice Test # 16 NICET
Smitty’s Two Minute Drill Grounding and Bonding
National Fire Protection Association Update
2008 Code Drills Health Care Facilities
Fire Alarm Practice Drill # 11 Denver Fire Department Journeyman Installer License Test © Ted Smith 2017.
Smitty’s Two Minute Drill Services, Feeders, and Branch Circuits 1
Load Calculation Speed Drill
Two Minute Drill – Residential 3
Smitty’s Two Minute Drill Varied Number 7
FIRE ALARM DRILL 26 © Ted Smith 2017.
Smitty’s Two Minute Drill General Knowledge
Smitty’s Two Minute Drill The BIG 5 Drill 1
Two Minute Drill – Residential 2
Smitty’s Two Minute Drill General Knowledge 2
Denver Fire Depart. License Fire Alarm Practice Test # 12
Presentation transcript:

NICET Fire Alarm Tech Level 1 Practice Test © Ted Smith 2017

Instructions Be sure to place this presentation in Slide Show Mode if it is not already in that mode before proceeding The purpose of this drill is to help you improve your skill at finding answers to questions using the applicable fire codes and also to help increase your knowledge of the Fire Alarm codes. Each slide will contain a question. The question will remain in the screen for a period of 2 minutes. At the end of the two minutes, a notification will sound and the slide will transition to the next slide which will have the correct answer to the question. After 15 seconds the next question will appear and the process will continue. During the test do not worry about the correct answers when those slide appear. You will be given an opportunity to review the answers with out the time at the end of the test. Click on the slide to start the timer and begin the test

Denver Building Amendments An existing building may be converted to a small day care center without complying with all the requirements for a change of use under chapter 10 of the iebc provided the number of occupants, exluding staff, shall not exceed 20 and the day care will be located on the first floor only. True False

Answer True 305.2.4

Denver Building Amendments The distance from exterior edges of projections to closet interior lot line or to an imaginary line between two buildings on the property shall not be less than four feet. True False

answer true 705.2

Denver building amendments Emergency responder radio coverage shall be provided in all new buildings in accordance with section 510 of the international fire code as amended. True False

answer True 916.1

NFPA 72 Equipment is to be designed so that is capable of performing its intended functions at ambient temperatures of _______ degrees F to _________ degrees F. A. 15, 100 B. 25, 110 C. 32, 120 D. 0, 100

Answer C. 32-120 Degrees F. 10.3.5

NFPA 72 A pathway shall be designated class _____ if operational capability continues past a single open and it includes a redundant path. A. C B. B C. A D. None of the above

answer C. Class A 12.3.1

Nfpa 72 All means of interconnecting equipment, devices, and applications and wiring connections shall be monitored for integrity of the interconnecting or equivalent path sot that the occurrence of a single open or a single ground fault condition in the installation conductors or other signaling channels is automatically indicated within _________________ seconds. A. 10 B. 30 C. 90 D. 200

Answer 200 seconds 12.6.1

NFPA 72 Monitoring for integrity shall not be required for the interconnection between enclosures containing control equipment located within _______ feet of each other if the conductors are installed in conduit or equivalently protected against mechanical injury. A. 20 B. 30 C. 5 D. 10

answer A. 20 feet 12.6.9

NFPA 72 The _____________________ is responsible for inspection, testing and maintenance of the system and for alterations and additions to the system. A. Building owner B. General Contractor C. Electrical Contractor D. Building inspector/ AHJ

Answer A. Building Owner 14.2.3.1

NFPA 72 A mechanical guard used to protect a smoke, heat or radiant energy sensing detector shall be __________ for use with the detector. A. suitable B. identified C. listed D. approved

Answer C. Listed 17.4.2

NFPA 72 The total sound pressure level produced by combining the ambient sound pressure level with all audible notification appliance operating shall not exceed _______ dBA at the minimum hearing distance. A. 65 B. 110 C. 95 D. None of the above

Answer B. 110 dba 18.4.1.2

NFPA 72 In a protected premises fire alarm system, the fire alarm systems shall be permitted to have a Fire Alarm Control Unit that is a combination of component systems for detection, notification and auxiliary functions. True False

Answer True 23.8.2.1

NFPA 72 A protected premises that does not have a fire alarm system but does have one independent function fire alarm for monitoring an area where combustible materials are stored and also has a foam releasing system for another area where open flame work is done. In this case the two systems shall be interconnected to function as a single system. True False

Answer False 23.8.2.3

NFPA 72 Which of the following is NOT one of the central station responsibilities when an alarm signal is received? A. Retransmit the alarm to the communications center B. Dispatch a runner or technician to the protected premises to arrive within 2 hours after receipt of a signal if equipment needs to be manually reset by the prime contractor. C. Immediately dispatch central station personnel to determine the validity of alarm signal D. Provide notice to the subscriber

Answer C. Immediately dispatch central station personnel to determine the validity of the alarm 26.3.8.1.1

NFPA 72 A household Fire alarm system’s Primary AC power source can only be a dedicated branch circuit, 120V, 20 amperes. True False

Answer False 29.6.3(4)

NFPA 72 A fixed temperature heat sensing fire detector with a marked color code of Blue has a maximum ceiling temperature rating of : A. 115 degrees F B. 155 Degrees F C. 305 Degrees F D. 230 Degrees F

Answer D. 230 degrees F Table 17.6.2.1

NFPA 72 An apartment building is any building or portion thereof containing ______ or more dwelling units with independent cooking and bathroom facilities. A. one B. two C. three D. ten

Answer C. Three 3.3.22

NFPA 72 A visual inspection of all the equipment of a fire alarm system shall be done at initial acceptance and also be done at __________ frequency thereafter. A. monthly B. Semi-annually C. Annually D. None of the above, required at initial acceptance only

Answer C. Annually Table 14.3.1

NFPA 72 Fire alarm shop drawings are not required include which one of the following: A. Name of the protected premises owner and occupant B. date of issue and any revision dates C. Name of the designer D. Name of the installer or Contractor

Answer C. Name of the designer 7.4.4

General Knowledge In commercial construction which of the following phases in listed out of sequence assuming the sequence is A, B, C, D. A. Civil Preparation B. Device Trim Out C. Rough Electrical Installation D. Testing and commissioning

Answer B. Device Trim Out. Device trim out should follow Electrical rough in

General Knowledge Which of the following Is the owners representative for a construction project? A. General Contractor B. Sub- Contractor C. Authority having jurisdiction D. Architect

Answer D. Architect The architect is hired by the building owner to coordinate the design, building and acceptance of the building and to represent the owner rights and interests.

Safety When working on a platform on a construction site where an employee has the potential to fall _______ feet or more fall protection or fall prevention measures must be put into place. A. 4 B. 6 C. 8 D. 10

Answer B. 6 feet

Safety The ____________________ is responsible for providing any PPE that is generally required by OSHA such as Hard Hats or Gloves and the _______________ is required to supply specialty PPE such as respirators. A. Employee, Employer B. Employee, employee C. Employer, employer D. Employer, employee

Answer c. Employer, Employer

safety OSHA requires the owners manual to be present on the project and available to all employees for each power tool on the project, including employees personal power tools that are brought for use by the employee. A. True B. False

Answer True OSHa does not differentiate between employers tools and employees tools. Any power tool on the project must meet all osha requirements and the employer is responsible for them all.

safety When working on a platform on in a manufacturing plant where an employee has the potential to fall _______ feet or more fall protection or fall prevention measures must be put into place. A. 4 feet B. 6 feet C. 8 feet D. 10 feet

Answer A. 4 feet This would fall under CFR 26 1910, General Industry not CFR 26 1926 Construction

Safety The competent person for electrical safety on the project must be identified before each shift and the_________________ must be informed who that person is and how to contact them. A. General Contractor B. AHJ C. Contractors Management D. crew working on the project

answer D. the crew working on the project OSHA requires that the crew know the name and contact information for the competent person for each day and if that person changes during the day , the crew has to be notified.

END of QUIz. THE TIME WILL STOP NOW END of QUIz. THE TIME WILL STOP NOW. PLEASE CLICK ON THE SLIDE TO CONTINUE WITHOUT THE TIMER AND REVIEW EACH QUESTION.

Denver Building Amendments An existing building may be converted to a small day care center without complying with all the requirements for a change of use under chapter 10 of the iebc provided the number of occupants, exluding staff, shall not exceed 20 and the day care will be located on the first floor only. True False

Answer True 305.2.4

Denver Building Amendments The distance from exterior edges of projections to closet interior lot line or to an imaginary line between two buildings on the property shall not be less than four feet. True False

answer true 705.2

Denver building amendments Emergency responder radio coverage shall be provided in all new buildings in accordance with section 510 of the international fire code as amended. True False

answer True 916.1

NFPA 72 Equipment is to be designed so that is capable of performing its intended functions at ambient temperatures of _______ degrees F to _________ degrees F. A. 15, 100 B. 25, 110 C. 32, 120 D. 0, 100

Answer C. 32-120 Degrees F. 10.3.5

NFPA 72 A pathway shall be designated class _____ if operational capability continues past a single open and it includes a redundant path. A. C B. B C. A D. None of the above

answer C. Class A 12.3.1

Nfpa 72 All means of interconnecting equipment, devices, and applications and wiring connections shall be monitored for integrity of the interconnecting or equivalent path sot that the occurrence of a single open or a single ground fault condition in the installation conductors or other signaling channels is automatically indicated within _________________ seconds. A. 10 B. 30 C. 90 D. 200

Answer 200 seconds 12.6.1

NFPA 72 Monitoring for integrity shall not be required for the interconnection between enclosures containing control equipment located within _______ feet of each other if the conductors are installed in conduit or equivalently protected against mechanical injury. A. 20 B. 30 C. 5 D. 10

answer A. 20 feet 12.6.9

NFPA 72 The _____________________ is responsible for inspection, testing and maintenance of the system and for alterations and additions to the system. A. Building owner B. General Contractor C. Electrical Contractor D. Building inspector/ AHJ

Answer A. Building Owner 14.2.3.1

NFPA 72 A mechanical guard used to protect a smoke, heat or radiant energy sensing detector shall be __________ for use with the detector. A. suitable B. identified C. listed D. approved

Answer C. Listed 17.4.2

NFPA 72 The total sound pressure level produced by combining the ambient sound pressure level with all audible notification appliance operating shall not exceed _______ dBA at the minimum hearing distance. A. 65 B. 110 C. 95 D. None of the above

Answer B. 110 dba 18.4.1.2

NFPA 72 In a protected premises fire alarm system, the fire alarm systems shall be permitted to have a Fire Alarm Control Unit that is a combination of component systems for detection, notification and auxiliary functions. True False

Answer True 23.8.2.1

NFPA 72 A protected premises that does not have a fire alarm system but does have one independent function fire alarm for monitoring an area where combustible materials are stored and also has a foam releasing system for another area where open flame work is done. In this case the two systems shall be interconnected to function as a single system. True False

Answer False 23.8.2.3

NFPA 72 Which of the following is NOT one of the central station responsibilities when an alarm signal is received? A. Retransmit the alarm to the communications center B. Dispatch a runner or technician to the protected premises to arrive within 2 hours after receipt of a signal if equipment needs to be manually reset by the prime contractor. C. Immediately dispatch central station personnel to determine the validity of alarm signal D. Provide notice to the subscriber

Answer C. Immediately dispatch central station personnel to determine the validity of the alarm 26.3.8.1.1

NFPA 72 A household Fire alarm system’s Primary AC power source can only be a dedicated branch circuit, 120V, 20 amperes. True False

Answer False 29.6.3(4)

NFPA 72 A fixed temperature heat sensing fire detector with a marked color code of Blue has a maximum ceiling temperature rating of : A. 115 degrees F B. 155 Degrees F C. 305 Degrees F D. 230 Degrees F

Answer D. 230 degrees F Table 17.6.2.1

NFPA 72 An apartment building is any building or portion thereof containing ______ or more dwelling units with independent cooking and bathroom facilities. A. one B. two C. three D. ten

Answer C. Three 3.3.22

NFPA 72 A visual inspection of all the equipment of a fire alarm system shall be done at initial acceptance and also be done at __________ frequency thereafter. A. monthly B. Semi-annually C. Annually D. None of the above, required at initial acceptance only

Answer C. Annually Table 14.3.1

NFPA 72 Fire alarm shop drawings are not required include which one of the following: A. Name of the protected premises owner and occupant B. date of issue and any revision dates C. Name of the designer D. Name of the installer or Contractor

Answer C. Name of the designer 7.4.4

General Knowledge In commercial construction which of the following phases in listed out of sequence assuming the sequence is A, B, C, D. A. Civil Preparation B. Device Trim Out C. Rough Electrical Installation D. Testing and commissioning

Answer B. Device Trim Out. Device trim out should follow Electrical rough in

General Knowledge Which of the following Is the owners representative for a construction project? A. General Contractor B. Sub- Contractor C. Authority having jurisdiction D. Architect

Answer D. Architect The architect is hired by the building owner to coordinate the design, building and acceptance of the building and to represent the owner rights and interests.

Safety When working on a platform on a construction site where an employee has the potential to fall _______ feet or more fall protection or fall prevention measures must be put into place. A. 4 B. 6 C. 8 D. 10

Answer B. 6 feet

Safety The ____________________ is responsible for providing any PPE that is generally required by OSHA such as Hard Hats or Gloves and the _______________ is required to supply specialty PPE such as respirators. A. Employee, Employer B. Employee, employee C. Employer, employer D. Employer, employee

Answer c. Employer, Employer

safety OSHA requires the owners manual to be present on the project and available to all employees for each power tool on the project, including employees personal power tools that are brought for use by the employee. A. True B. False

Answer True OSHa does not differentiate between employers tools and employees tools. Any power tool on the project must meet all osha requirements and the employer is responsible for them all.

safety When working on a platform on in a manufacturing plant where an employee has the potential to fall _______ feet or more fall protection or fall prevention measures must be put into place. A. 4 feet B. 6 feet C. 8 feet D. 10 feet

Answer A. 4 feet This would fall under CFR 26 1910, General Industry not CFR 26 1926 Construction

Safety The competent person for electrical safety on the project must be identified before each shift and the_________________ must be informed who that person is and how to contact them. A. General Contractor B. AHJ C. Contractors Management D. crew working on the project

answer D. the crew working on the project OSHA requires that the crew know the name and contact information for the competent person for each day and if that person changes during the day , the crew has to be notified.

END of QUIz. THE TIME WILL STOP NOW END of QUIz. THE TIME WILL STOP NOW. PLEASE CLICK ON THE SLIDE TO CONTINUE WITHOUT THE TIMER AND REVIEW EACH QUESTION.