PSM Lessons Learned Background

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

Parts Management Reengineering TLCSM Executive Council Update Gregory Saunders, Director Defense Standardization Program Office 05 Oct 06.
JHP Case Study Introduction 1 UNCLASSIFIED notional data for notional program.
O&S Cost Estimating JHP Case Study 1 UNCLASSIFIED notional data for notional program.
1 PBL Panel Discussion F-22 System Program Office F-22 System Program Office F-22 System Program Director 13 January 2015.
Managing the Information Technology Resource Jerry N. Luftman
JHP Case Study Exercise 1 UNCLASSIFIED notional data for notional program.
ICBM Systems Directorate Minuteman III
The Agile vs. Waterfall Methodologies Systems Development:  the activity of creating new or modifying / enhancing existing business systems.  Objectives.
1 United States Army EVM and The Army: An Update Presented By: Keith Samuels.
OASD Logistics and Materiel Readiness
Earned Value Management Systems (EVMS) Defense Support Team (DST) and Report to Congress Mr. Richard Ginman OUSD(A&T)/DPAP Presentation to National Defense.
1 Earned Value Management (EVM) Center ‘Moving Forward’ Presented by Mr. David Kester Director, Program Integration Division April 25, 2007.
Air Armament Center Mr. John Mistretta Technical Director, AAC/EN War-Winning Capabilities…On Time, On Cost Systems Engineering Update AAC.
1 Doc # USAMC LOGSA--Supporting Warfighters Globally U.S. Army MaterielCommand US AMC LOGSA Parts Management Plan Builder 29 April 2008.
DMSMS Subcommittee Breakout Session PSMC Spring 2007 Conference McLean, Virginia Parts Standardization & Management Committee.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Federal Software Asset Management Initiative Concept of Operations Report to the Executive Steering Committee March 8, 2004 Implementing the President’s.
LOG 101 Curriculum Review 16 Oct 2009 Curriculum Review LOG 101 Acquisition Logistics Fundamentals Presented to the Life Cycle Logistics (LCL) Functional.
Strategic Vision Life Cycle Logistics Functional IPT Mrs. Sue Dryden DASD(Materiel Readiness) January 13, 2012.
Curriculum Review Product Support Assessment-Driven DAU Performance Based Logistics (PBL) Learning Asset Transition Roadmap Presented to the Life Cycle.
Life Cycle Cost Savings by Improving Reliability Dr. Charles E. McQueary Director, Operational Test and Evaluation January 15, 2009.
| 1 Weapon System Acquisition Reform- Product Support Assessment DAU SYMPOSIUM 13 April 2010 Presented by: Basil Gray Where Innovation.
LOG 200 Curriculum Review 15 Apr 2011 Curriculum Review LOG 200 Intermediate Acquisition Logistics Presented to the Life Cycle Logistics (LCL) Functional.
OSD CAIG 1 OSD Cost Analysis Improvement Group and ODUSD (L&MR)/LPP and MR&MP April 26, 2007 Weapon System Sustainment: A Project to Identify Requirements.
LOG 101 Curriculum Review 28 Jun 02 Richard A. Andrews, CPL Course Manager.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
1 Alan Estevez | Principal Assistant Deputy Under Secretary of Defense Logistics & Materiel Readiness April 15, 2008 DAU Annual Acquisition Community Symposium.
Business, Cost Estimating & Financial Management Considerations
Principal Investigator ESTCP Selection Meeting
THE VALUE (SUPPLY) CHAIN STRETCHES FROM THE BEGINNING OF YOUR SUPPLIER’S SUPPLY CHAIN THROUGH ALL OF YOUR PROCESSES THAT CREATE VALUE FOR YOUR CUSTOMERS.
Contracting (Product) Considerations
SCT Project Management Issues
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Parts Management Plan Builder 26 July 07
DMSMS Management at NAVICP
Procurement Management
ISA 201 Intermediate Information Systems Acquisition
Revision reflects an evolution, not a revolution
Principal Investigator ESTCP Selection Meeting
Milestone A to Milestone B Requirements Management Activities
Acquisition Sustainment Tool Kit (ASTK
Product Support Strategy Demonstrated Performance
TechStambha PMP Certification Training
ISA 201 Intermediate Information Systems Acquisition
ISA 201 Intermediate Information Systems Acquisition
Lesson 4 Systems Engineering Plan Exercise Team #
Project Management.
Phase 2 Tollgate Review Discussion Template
Demands; MMH; Life; Unit Cost
A B C Solution Analysis Technology Maturation & Risk Reduction
Phase 2 Tollgate Review Discussion Template
Product Support Considerations
TEAM NAME. TEAM NAME Additive Manufacturing Business Model Workshop Day 2 Outbrief 31 May 2018.
Demands; MMH; Life; Unit Cost
O&S COST MANAGEMENT: O&S COST INFLUENCE ON PROGRAMS
Systems Analysis and Design
DMSMS Management at NAVICP
Phase 2 Tollgate Review Discussion Template
Financial Management Modernization Program
Principal Investigator ESTCP Selection Meeting
Product Support Strategy Demonstrated Performance
Demands; MMH; Life; Unit Cost
Project Management Method and PMI ® PMBOK ® Roles
Executive Project Kickoff
Project Kick-off <Customer Name> <Project Name>
Full Workforce Working Group Full Workforce Working Group
Principal Investigator ESTCP Selection Meeting
Presentation transcript:

PSM Lessons Learned Background PSM: Mr. Thomas Hancock Lead Service: Army System Role: Air Defense System Name: SCUDAR ACAT Level: 1C Life Cycle Phase: Engineering & Manufacturing Development System Users: Army and Air Force base defense units Support Integrator(s): Armadyne, Intl. Number of Systems: 138 Next Major Life Cycle Milestone/Decision: Milestone C

Lesson Learned (1 of 2) Issue: Engineering and Product Support Baselines Differed Background: Development of baseline system proceeded within engineering without updates to product support. Product support began to engage in discussions with DLA to develop product support strategies. Last minute discovery of inconsistencies between engineering and product support avoided erroneous product support decisions. Resolution/Mitigation: Engineering and product support both agreed to meet weekly to discuss system progress and to synchronize key engineering and product support documents. Lesson Learned: Engineering and product support must effectively partner throughout the development process, to include face-to-face and document coordination.

Lesson Learned (2 of 2) Issue: Technology Reliability and Instability Background: The system under development relies on cutting-edge technology. Because of concerns that fielding of the system might be accelerated, product support strategies were developed and implemented while the technology was still unstable. The result was that parts were purchased for stock that were rendered obsolete as the system matured. Resolution/Mitigation: Engineering and product support reviewed system development to identify areas of stability and instability. Contracts for parts involving unstable areas were suspended. Engineering and product support agreed to collectively identify system areas where product support strategies could be executed. Lesson Learned: Product support strategies need to be executed in coordination with engineering to ensure acquisition of the right parts.

Backup Slides

Product Support Organization Product Support Manager FMS Training Management Support Office Contract Support DCMC Liaison DLA Liaison Supply Support Maintenance Support DLA Prime Vendor Acme Parts Supplier Other Service Supply Liaisons Component Depot Overhaul AAA Engine Maintenance Provider Depot Frame Overhaul PMO Product Support Team includes: ~6 government employees ~25 contractors

Product Support Quad Chart System Product Support Strategy Metrics Data Sustainment Approach Current (initial CLS covering total system) Future (sub-system-based PBL contracts) Issues Shortfall in O&M funding in FYDP Reliability and availability estimates are below goals LCSP requires update before DAB Resolution POM request for O&M restoration submitted Reliab. imprvmnt plan w/clear RAM goals up for final sign. Metric Prior Actual Original Goal Current Goal Current Estimate/ Material Availability 76% 80% 77% 70% Material Reliability 37 hrs 50 hrs 50.5 hrs 48 hrs Ownership Cost $245B $385 B $395 B $392 B Mean Down Time 12 hrs 20 hrs 18 hrs 15 hrs Sustainment Schedule O&S Data Cost Element Previous Actuals Original Baseline Current Cost Unit Level Manpower 3.90 5.17 5.75 Unit Operations 6.05 6.83 6.85 Maintenance 0.74 0.60 0.68 Sustaining Support 2.24 2.40 Cont. System Improvements 0.13 0.03 0.05 Indirect Support 1.85 1.92 Total 14.91 16.95 17.65