TVA Kingston Ash Recovery Project Roane County, TN

Slides:



Advertisements
Similar presentations
June 6, 2013 SURFACE RECLAMATION OF THE CAPTAIN JACK MILL SUPERFUND SITE Nick Anton, CDM Smith Todd Bragdon, CDM Smith Mary Boardman, CDPHE Joy Jenkins,
Advertisements

TVA Kingston Ash Recovery Project Roane County, TN Environmental Research Symposium Roane State Community College – August 2, 2011 Craig Zeller, P.E. US.
Ash Recovery At Kingston Fossil Plant Kingston, Tennessee
Environmental Protection Commission Overview Vision: Environmental Excellence in a Changing World.
U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.
Imagine the result The TVA Kingston Ash Recovery Project: Ecological Risk Approach Daniel Jones † Suzy Young † Amber Stojak † Neil Carriker ‡ † ARCADIS.
At 4620 square miles, Lane County, Oregon is nearly as large as the State of Connecticut and is home to some 336,000 residents. Short Mountain Landfill,
TVA and The Kingston Ash Spill Environmental Disaster By: Tikedra Kellum.
Rochelle Routman, PG Environmental Specialist Georgia Power
Coal Ash Ponds The Romeo and Juliet Story of Coal Fired Power Plants Society sees them as toxic together, but currently, one cannot exist without the other.
Location In the mountain of Colorado consist of numerous sites in Denver area which contaminate with radioactive soils and Debris. There are about 65.
By Nick Garlisch What is Coal Ash? Coal ash is what remains after coal is burned When coal is burned, roughly 10% of the coal.
2014 Dan River Ash Release-Summary and Update NC Water Resources Congress October 30, 2014.
Clean-up at BP Paulsboro New Jersey (USA) Roxane Fisher and Mark Ferguson.
Tennessee Valley Authority (TVA) Kingston Fossil Plant Knoxville.
Tennessee Valley Authority Name: Jean-Ann James Conference/Event: Messner Date Location Source:
RRT/NWAC Meeting – Wenatchee, WA March 10, 2011 Angie Zavala EPA Region 10.
February 13, 2008 Scott Slesinger Environmental Technology Council 1 Suggested Improvements To EPA’s Implementation Of The Pollution Prevention Act.
Sithe Global Power, LLC Toquop Energy Project. A 750 MW Coal fired electric generating plant Located 12 miles northwest of Mesquite, NV in Lincoln County.
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
Landia Superfund Site: Green Remediation and Green Infrastructure Support Sustainable Development Douglas Reid-Green, BASF Corporation.
Update on the Superfund Program: U.S. Tour de Table NATO SPS Pilot Study Prevention and Remediation in Selected Industrial Sectors June 17-23, 2006 Ljubljana,
TVA Kingston Ash Recovery Project Roane County, TN Project Update September, 2012 Neil Carriker.
Energy Sources – Coal Caleb Low(16) Bryan Ng(17) Nguyen Vu Khang(18) Zhang Chen(25) Zhong Yi(20)
Site Completion Preliminary Assessment Site Inspection Remedial Investigation Feasibility Study Remedial Design Remedial Action LTRA O&M Site Identified.
Environmental Technology Council EPA /State / DOD Region IV Environmental Conference June 2005 Joydeb “Joy” Majumder, EPA Region 4.
Environmental Dredging of Perfluorochemical-Impacted Sediment from a Sensitive Wetland Mark A. Gaetz (3M) Paul Lear (WRScompass)
Cleanup and Remediation of Persistent Bioaccumulative Toxics in the Great Lakes Basin Gina Bayer, CH2M HILL PBT Strategy Team Maumee Bay Meeting February.
Update & Overview of the Coal Combustion Residuals Proposed Rule United States Environmental Protection Agency Region 4 Frank Ney February
1 LOCKFORMER ELECTRIC RESISTIVE HEATING CASE STUDY U.S. EPA Emergency Response Branch Steve Faryan, On-Scene Coordinator ,
Municipal Solid Waste Generation, Recycling, and Disposal in the U.S. for 2006 U.S. EPA Office of Solid Waste November 2007.
1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S.
Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program.
Project Update: Hudson River PCBs Superfund Site October 24, 2012 Mr. David King, PE – USEPA Region 2 Mr. Gary Klawinski – USEPA Region 2 Mr. Mark Surette.
Planning Habitat Restoration for Dredging Projects WEDA Midwest Chapter Conference Green Bay, Wisconsin April 27, 2012 Jack Brunner.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
California Integrated Waste Management Board 1 Agenda Item 5 (Committee Item F) June 9, 2008 Agenda Item 5 (Committee Item F) June 9, 2008 Consideration.
Tennessee Division of Solid Waste Management Air and Waste Management Association - August 2010.
David K. Paylor Virginia State Board of Health March 17, 2016.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Karolina Brownfields Redevelopment Site Ostrava, Czech Republic Thomas C. Voltaggio Senior Advisor Dawson & Associates
The Palmerton Zinc Superfund Site EPA Response In 1980 the U.S. finally addressed the issue of hazardous wastes Comprehensive Environmental Response,
Town Branch Wet Weather Storage Public Information Meeting February 19, 2014 Lexington Fayette Urban County Government Division of Water Quality.
CALCASEIU RIVER AND PASS DREDGED MATERIAL SEDIMENTATION STUDY.
Restoration of the Swan Pond Embayment Michelle Cagley, Tennessee Valley Authority.
Site Assessment Fundamentals Problems During Construction Panel Discussion and Forum Mayor’s Office of Housing 1 South Van Ness Avenue July 29, 2008.
Remediation and Redevelopment at the Former Fort Devens, Massachusetts.
Low-Level Radioactive Waste (LLW) Disposition at the
Elizabeth “Lee” Payne AmeriCorps Communications Associate ---
Bayou Verdine Superfund Site
EPA Region 7 Lead Remediation Byrnes Mill Dam and Park
Sustainable Remediation Case Studies
What is Engineering The word engineer originates from the
Presentation on Livermore Lab Site 300 Superfund Cleanup Peter Strauss, Environmental Scientist, PM Strauss & Assoc. Community-Wide Meeting on
Metro’s Natural Areas: Maintenance Strategy Needed
Pollinator Protection in Region 4
CalRecycle 2015 Wildfire Disaster Recovery effort UPDATE
Niagara River Area of Concern
Marla E. Wieder Assistant Regional Counsel U.S. EPA, R2
RESTORING CONTAMINATED SITES TO PRODUCTIVE USE
Landfill Post-Closure Trust Fund
Application of HAZUSTM to the New Madrid Earthquake Project
Water Quality Trading Advisory Committee MDA Headquarters
Ecological Revitalization and Contaminated Sites
Water Quality Trading Advisory Committee MDA Headquarters
Chesterfield Neighborhood Coal Ash Update January 9th, 2019
Senator Dance Town Hall Coal Ash Update December 5, 2018
CONSERVATION 20/20 MANAGEMENT AND MANAGEMENT TRUST FUND OVERVIEW
SWAC – Agenda 10/23/18 Chapter 6 – Alternative Technology – Draft Findings 2. Chapter 7 – Draft Landfill Disposal Existing Disposal System Disposal Options.
Harmful Algal Blooms & What’s Next for Florida August 30, 2019
Presentation transcript:

TVA Kingston Ash Recovery Project Roane County, TN Craig Zeller, Remedial Project Manager

TVA Kingston Steam Plant ≈ 30 miles west of Knoxville off Interstate 40 Emory River Mile 2.0 (just above confluence with Clinch River) Built 1951 to 1955 (initially for DOE Oak Ridge Reservation) 9 coal fired units 10 Billion KW-Hrs electricity year (670,000 homes in TN Valley) 14,000 tons of coal day (10% coal ash recovered)

Swan Pond Embayment 1941

Dredge Cell Area Pre-Spill

Spill Progression – 12/22/08 FILLS IN SWAN POND SLOUGH EMPTIES INTO EMORY RIVER MAIN CHANNEL FILLS IN SWAN POND SLOUGH FILLS IN BERKSHIRE SLOUGH

Dredge Cell Area Post-Spill

Root Cause Analysis

CERCLA Removal Action Strategy (May 12, 2009 AOC) Phase 1 (Time-Critical Action Removal) 3.5 million CYS removed (excavated and dredged) 4.0 million tons disposed at Perry County, AL (completed 12/01/10) May 29, 2010 Emory River reopened Phase 2 (Non-Time Critical Action Removal) 2.3 million CYS removed from north and middle embayment Consolidate in reinforced, on-site disposal area Construct robust subsurface perimeter containment system to withstand earthquake loads Phase 3 (Residual Ash Study) River ecosystem and human health risk assessments Long-term monitoring (5-year reviews) 8

Region 4 Excellence in Site Re-Use Award EPA Region 4 issued the award to TVA in June 2015 for community redevelopment and ecological restoration efforts that went above and beyond cleanup requirements. From left to right, Mathy Stanislaus (EPA), Bob Deacy (TVA), Franklin Hill (EPA), Chuck Head (TVA) and Craig Zeller (EPA).

Project Costs Highlights Time Critical Removal Action (Phase 1 Dredging) $597.6 Million $290.8 Million (≈50%) on Ash Dredging & Disposal Non Time Critical Removal Actions (Phase 2/3) $537.7 Million $43 Million for Ash Stacking $13 Million for Ash Processing/Stacking $130 Million for Perimeter Wall $34 Million for Ash Landfill Total Project Costs $1.134 Billion ≈$44 Million under $1.178 Billion Projection

For More Information, Contact Craig Zeller, P.E. EPA Region 4 (404) 562-8827 zeller.craig@epa.gov