Update of MVD services and requests

Slides:



Advertisements
Similar presentations
ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
Advertisements

Mechanical Status of ECAL Marc Anduze – 30/10/06.
OLYMPUS Collaboration Meeting Cooling Water David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting DESY
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
NOvA APD Cooling Water Update William Gilbert University of Minnesota.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
1 David Santoyo sLHC OXFORD 17/06/2010 EC Structure Review ? ? ? ? ? ? IFIC-Valencia.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
HE NgCCM integration issues Ianos Schmidt, August 26, 2015.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
/ 11 Updates of PANDA 3D Model CM June 2016 at GSI, MEC Session J. Lühning, GSI Updates for: Panda Hall Target Spectrometer Latest version.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
EC: 7 DISK concept Preliminary considerations
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
ATLAS Internal ID Service Integration
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
STRAW TRACKER SYSTEM CAD STATUS :
Preliminary thoughts on SVT services
Beam
MVD Mechanics update EXTERNAL FRAME: NEW DESIGN
VELO-installation meeting CERN, January 17, 2006
- CT INSTALLATION PROCEDURE OVERVIEW -
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
PANDA Yoke of the Magnet
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
U units for the MVD Close MVD Pixels (Paolo) Strips (Robert and Hans)
Micro Vertex Detector of PANDA Strip Detector
? ENDCAP: Mechanics IFIC-Valencia.
Pixel cooling specifications
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
LumiCal mechanical design, integration with LDC and laser alignment
Integration – preliminary ideas on routing and tests
Integration issues at IHEP
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
First of all we will remind some numbers:
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Work packages status in Torino and perspectives
Question & Suggestions March 17th
Mechanics of the MVD Daniela Calvo on behalf of the MVD group
BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.
Duct numbering for EE- 09/06/2008 Wolfgang Funk - CERN CMS 1 06.B 07.B
Cryomodule Assembly Plan
Safety, reliability and maintainability
Presentation transcript:

Update of MVD services and requests DCDC circuits Optoelectronic (GBTx + VTRX) boards Cooling plant Services on platform in front of the magnet Daniela Calvo MVD group

MVD services - DCDC circuits

MVD service - DCDC circuits 24 blocks arranged in 3 sectors (2112 DCDC circuits) 4 PCBs (left and right difference) housing 22 DCDC circuits each

MVD services – first prototype 88 DCDC circuits (22 DCDC circuits each row) Weight (without cables): ~ 1.3 Kg Dimension (without cables): 455 mm (with cooling connectors) x 85 mm x 63 mm

MVD services - Request Available cross section: 56000 mm2 (between beam pipe and inner BEMC diameter) Cooling pipes and supports: 9000 mm2 (dashed ring – challenge solution!) DCDC circuits leave only ~ half of cross section for cables (needed cross section: 22300 mm2) and they will fill the empty parts between the circuits anyway. (not reccommended!) ONLY HALF of the needed CROSS SECTION is AVAILABLE for cables IT IS NECESSARY MORE SPACE around the beam pipe for the MVD

MVD services – Optoelectronic boards

Optoelectronics board, old version 76 mm 60 mm 12 bars with 16 GBT boards each (192 circuits) Interspace between PCBs: 20 mm

Optoelectronic board, new version – GBTx + VTRX 86 mm 25.4 mm GBTx and VTRX on opposite sides, then 4.8 Gbit/s signals routed using vias Two power supply connectors to fit the routing of the power supply cables, in fact two mounting configuration of the boards are foreseen. Additional chip to distribute the SC out signal to the two connectors towards the FEE. The cooling of the GBTx in this configuration should be easier (to be verified!). The board dimension is larger than the estimated values ( 3 years ago) anyway. 15.5 mm

Opto. board, new version – board routing 16,5 mm Signal cable Thermal bridge (copper) 20 mm Interference between optical fiber connectors and signal cables !!

Opto. board, new version – board number 86 mm 25.4 mm Each connector includes : 5 e-links + SC signal 22 additional boards to maintain the symmetry left– right during the routing of the semi disks and semi cylinders of the barrel part to be able to send the SC signal to each pixel or strip module without connection between different modules It is necessary to increase the GBT board number from 192 to 214. It means 2 additional optoelectronic boards each bar, one each side

Requests Additional 80 mm to arrange the 192 longer optoelectronics boards Additional 86 mm to arrange an additional board along the rod Additional 120 mm to avoid interference between optical fibers and signal cables Interdistance: 15 mm longer Possible solution ?: to shift upstream the beam pipe flange A DCDC block (or partial block) has to be cut out, anyway! IT IS NECESSARY MORE SPACE around the beam pipe for the MVD

MVD services – Cooling plant

Cooling plant ouside the pit INLET RACKS (PIXEL, STRIP, SERVICES) PLC

Cooling plant inside the pit RETURN RACKS (PIXEL, STRIP, SERVICES) INLET PUMP + WATER CLEANING UTIT TANK+ VACUUM PUMP

Cooling plant - line paths inside PANDA Hall RETURN LINES INLET LINES

MVD services in front of the magnet

Racks - request Use the racks starting from the top (222 U – 50% left and 50% right). The reduction to 188 U is still under investigation. MVD

Patch panels for cables - request for MVD cables Patch panels for MVD cables positioned close the BEMC support (left and right) with duct to route cables from racks. A specific system could move and rotate the duct for positioning the patch panels at the external side of the racks, during the installation of detectors. The system could be positioned on the top of the racks

Routing of the cooling pipes and patch panel - request The duct for the cooling pipes to the patch panels needs to be positioned under the platform floor It should be a solution to foresee also the patch panel (for the cooling part) under the platform during the detectors installation. A system could move and rotate the patch panel to the final position, near the BEMC support. But it is necessary to go trough the platform floor. platform Vertical section Patch panel Duct - cooling pipes