1C. CavataBENE 17/03/05 Proton driver Saclay A talk assembled with materials from R. Gobin P.Y. Beauvais B. Visentin R. Duperrier Outlines.
D.S. proposal 18/12/2003 R. Garoby 1 PROTON DRIVER ACTIVITY Present work program: IPHI-SPL collaboration HIPPI Joint Research Activity [CARE] Proton driver.
H. Haseroth July 26 – August 1, 2004 NuFact04, Osaka 1 The 3 MeV H - Test Stand at CERN - The first part of the SPL - H. Haseroth on behalf of the SPL.
1Jean-Luc Biarrotte, SPL/ESS meeting, Lünd, June 30, Accelerator design for MYRRHA J-L. Biarrotte, CNRS-IN2P3 / IPN Orsay.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Broader Approach Activities toward Fusion DEMO Reactors IT/E-2 IAEA 21 st Fusion Energy Conference (Chengdu 17 th October, 2006 ) Shinzaburo Matsuda Japan.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Ajit Kurup, Imperial College London. Neil Bliss, Norbert Collomb, Alan Grant, STFC/DL, Daresbury. Costing Methodology and Status of the Neutrino Factory.
Joint Institute for Nuclear Research Grigori SHIRKOV Joint Institute for Nuclear Research Dubna, Russia International Intergovernmental Organization 18.
Introduction to EC Framework Programme 7 Rob Edgecock CCLRC Rutherford Appleton Laboratory Introduction to Framework Programmes “ “ FP7 Neutrino LOI Mapping.
LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Activities of Superconducting RF Accelerators at Nanjing University Sun An Proton Linear Accelerator Institute Institute of Energy Sciences, Nanjing University.
Parameters of 2 nd SPL feasibility study A.M.Lombardi (reporting for the working group)
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration.
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
SRF Test Infrastructure in Europe W. Weingarten with O. Brunner, S. Calatroni, B. Vullierme (CERN) and R. Eichhorn, E. Elsen, D. Gardès, J. Knobloch, G.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Scope and Project Plan of IFMIF/EVEDA Presented by Masayoshi SUGIMOTO (IFMIF/EVEDA Project Team, Deputy Leader/ JAEA) IAEA’s Technical Meeting on Nuclear.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
The International Workshop on Thin Films. Padova 9-12 Oct of slides Present Status of the World- wide Fusion Programme and possible applications.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS ORBIS TERRARVM RAL Front End Test Stand — Context David Findlay Accelerator Division ISIS Department Rutherford.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Status of SCRF Accelerator Activities at CEA-Saclay
Linac4 & SPL Status of preparation and Opportunities M. Vretenar (R
Study on IFMIF Beam-Target Interface
The CERN Linac4 history, performance, perspectives
WP5 Elliptical cavities
Accelerator R&D for Future Neutrino Projects
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Hosting Orsay Walid KAABI
LIPAc Control System Reliability improvements
Advanced-Fusion Neutron Source
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
Outline: Why now ? What ? How ?
Superbeams with SPL at CERN
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
ADS Accelerator Program in China
Electron Source Configuration
Olivier Napoly, coordinator CEA/Irfu
Expression of Interest for future flagship projects
A High Intensity Neutrino Oscillation Facility in Europe
The SPL-based Proton Driver at CERN
IFMIF/DONES Project: opportunities for the industry
Presentation transcript:

Proton Driver Initiatives Marco Zito (Dapnia-SPP) Bene Meeting Cern, July 4 2006 Bene Open Meeting,CERN July 4, 2006 Marco Zito

Taking over from Christian Cavata Not an expert in this field !! Foreword Taking over from Christian Cavata Not an expert in this field !! Still learning the job: issues, people, tasks…. Your input/advice is very welcome Bene Open Meeting,CERN July 4, 2006 Marco Zito

Proton Driver for neutrino beams : Initiative for FP7 Slide from Christian, april meeting at RAL In FP6 : Mainly HIPPI and XADS Outside FP6 : LINAC4 /SPL @ CERN RAL Isis/ESS/Nufact Accelerator R&D What in FP7 ? SCRF infrastructure at CERN, proposed by A. Wagner, endorsed by several Labs in EU, should be supported by Neutrino EU community (→pdriver and muon acceleration) Follow up on HIPPI ? Eurotrans : ADS demonstrator Bene Open Meeting,CERN July 4, 2006 Marco Zito

Proton Driver for neutrino beams : Initiative for FP7 Slide from Christian, april meeting at RAL 28 April 2006 Statement of Interest in a European SC RF Facility To: CERN Council Strategic Planning Group From: BENE (Beams for European Neutrino Experiments) Subject: European Super-Conducting RF Facility This short statement, on behalf of BENE, intends to convey to the Council SPG the support of the Accelerator-based European Neutrino community for the SC RF Facility proposed in the Letter of Intent, sent in March by Prof A. Wagner, chair of the Tesla Technology Collaboration. Superconducting RF is essential in the context of a future neutrino facility. It is planned to be used in the proton driver and, in the case of a neutrino factory, in the muon accelerators. Therefore, the European BENE Networking Activity, grouping many laboratories and institutes interested in the promotion of a future neutrino facility in Europe, would like to state clearly its interest in the proposed facility. For it to be matched also to the needs of a neutrino facility, it should be able to support the development, construction and test of the larger cavities operating at 700 MHz for the proton driver and 200 MHz for the muon accelerators. This implies the following capabilities: Niobium on Copper construction techniques, the processing of cavities of the corresponding size and technology, High power RF testing at both frequencies. The components which have to be developed have large similarities with the ones needed for the ILC and could greatly benefit from the experience jointly gained. This is in particular the case of: high quality cavities, high power couplers, High-Order Mode couplers, tuners, embedded magnet package, Beam Position Monitors (BPM), cryostat vessel. We acknowledge the explicit mention of synergies with other applications in Prof. Wagner’s document The facility proposed has to include a considerable infrastructure such as clean rooms, cryogenics, surface preparation, ultrahigh vacuum installations, RF test equipment etc. which it is very desirable to use for multiple purposes. Sharing it will undoubtedly profit to all future applications of the superconducting technology and help design economically optimized devices. We are glad to have an opportunity to collaborate with the ILC effort and ready to give our contribution to the formulation of the more complete proposal that will be submitted in the framework of FP7. V. Palladino (Coordinator of the CARE/BENE Network) Editors : A. Blondel, C. Cavata, P. Dornan, V. Palladino Bene Open Meeting,CERN July 4, 2006 Marco Zito

Slide from Christian, april meeting at RAL Marco Zito Bene Open Meeting,CERN July 4, 2006 Marco Zito

IFMIF Project International Fusion Material Irradiation Facility Part of the “enlarged approach” package containing ITER 2 phases : EVEDA (Engineering Validation Engineering Design Activity)(Rokkasho) prototype of upstream block, then IFMIF (Europe) Start in 2007 33 ME: France, Italy, Spain High power (10MW), huge neutron flux (20 dpa), challenge to machine reliability Bene Open Meeting,CERN July 4, 2006 Marco Zito

Présentation Approche élargie ITER International Fusion Energy Research Center ITER Remote Center ITER Setting Experimental Parameters Data Acquisition and Analysis Computer Simulation Center for Fusion Science JT 60 SA Satellite Tokamak IFMIF-EVEDA Fusion Power Plant Technology DEMO Bene Open Meeting,CERN July 4, 2006 Marco Zito

IFMIF and the Road Map fusion Test & verify materials performance for design, construction, licensing and safe operation of DEMO ~2015 DEMO Reactor Operation EVEDA Construction ~2025 Sufficient Information for DEMO Construction EVEDA Task Design Integration Ion Source Test Accelerator Test Diagnostics System Design Main Loop Model Diagnostics Li Purification Remote Handling System Design Test Module Small Specimen Test Diagnostics Remote Handling System Design Accelerator Target Test Cell DT Linac Injector RFQ 40 MeV 0.1 MeV Bene Open Meeting,CERN July 4, 2006 5 MeV Li Purification Loop Marco Zito

Le grand IFMIF (International Fusion Materials Irradiation Facility) Most important task is to realise overall design of the facilities Installation d’irradiation des matériaux par les neutrons de 14 MeV Document de référence : CDR (Comprehensive Design Report) Lieu d’implantation non déterminé Bene Open Meeting,CERN July 4, 2006 Marco Zito

IFMIF (International Fusion Materials Irradiation Facility) 40 MeV 2 x 125 mA 10 MW faisceau 1 MW cw 175 MHz 2 Bene Open Meeting,CERN July 4, 2006 Marco Zito

Scheme of the IFMIF EVEDA Accelerator Bene Open Meeting,CERN July 4, 2006 Marco Zito

IPHI (Injecteur de Protons Haute Intensité) RFQ Diagnostics Dump 300 kW Source SILHI ECR plateforme 100 kV guides d’onde 1ère section RFQ Proton beam 3 MeV 100 mA, installation and long-term test in 2007. Bene Open Meeting,CERN July 4, 2006 Marco Zito

Next steps? Bene Open Meeting,CERN July 4, 2006 Marco Zito