General Road Construction Information

Slides:



Advertisements
Similar presentations
Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Advertisements

Pavement Design Session Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 5 Slide 1 Unit 5 Roofs.
Permeable Pavements Shingle Creek Watershed Management Commission May 31, 2011.
EA204 Environmental Technology Pavement Drainage Stormwater Sewer Design.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Regional Asphalt Seminars Pavement Wedge Guidelines and Specifications EMMETT R. HELTZEL, P.E. STATE MAINTENANCE ENGINEER.
Chapter 3 Compaction. To improve the density and other properties of soil Increases the solid density improves strength Lowers its permeability Reduces.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Bioretention Design Getting the Details Right. Coordination of Plans Curb elevations, grade breaks, architectural plans consistent with delineation of.
Roads and Fires Anatomy of Roads Surface Drainages structures.
Safety Audit Components Safety assessment for risk Management.
Spreadsheet Session Purpose: To illustrate the process involved in recording municipal tangible capital assets Outline: Setting up municipal equipment.
Pavement Analysis and Design
1 Pertemuan 06 > Matakuliah: S0182/Studi Kasus Dalam Teknik Sipil Tahun: Juli 2005 Versi: 01/01.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Surface Drainage Crown (flat A shape) c Dirt & Gravel: 1/2” - 3/4” per foot (4 - 6 inches in 10 feet)
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Aires Estates/Bald Eagle Estates) Improvement Project October 11, 2010.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
SESSION 4 Drainage Design Considerations. Objectives  Identify types of subsurface drainage  Determine need for subsurface drainage  Recognize importance.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
Complete Streets Training Module 10 – Street Elements: Design & Safety Considerations for Context-Based Solutions.
4/26/061 presents Project Crimson April 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
City of Belmont Pavement Reconstruction Project October 15, 2014.
DOMESTIC DRAINAGE SYSTEM 2012BC25444
GEOTEXTILES IN TRANSPORTATION APPLICATIONS
Jerry L. Larson IRMCA Indiana LTAP Basics of a Good Road
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
STRONG NEIGHBORHOOD INITIATIVE Public Works Department January 30, 2007 Agenda item 8.01.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
Highway and Road Projects: When to Treat Runoff William Fletcher Water Resources Program Coordinator Geo/Environmental Section ODOT.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Alabama Asphalt Pavement Association
Town Road Survey - What You Should Know 1_24_17
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
Agenda Updates to Driveway and Sidewalk specifications and permits
Roadway Pavement Management Plan
Town of Brighton, Department of Public Works
Rating Grade Separations
General Road Construction Information
Jefferson County SA Red Rocks Site Approval
PROJECT INFORMATION SESSION Small Business Enterprise
Drainage and Grading Creating stable ground surfaces
GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
Interdisciplinary teams Existing or new roadway
Site Grading Site Grading Civil Engineering and Architecture
City of Bloomfield Hills
CONCRETE PAVEMENTS.
Surface Preparation before laying Hot Mix
Types of concrete – Regular concrete
PAVEMENTS CEE 320 Steve Muench.
SUBGRADE HOW TO DEAL WITH SOFT SPOTS
Building Construction I Sofia Sebastian 1
Participatory Road Program neighborhood meeting Donahoo 174th Street
SE 12th Street Roadway Improvements February 8, 2005.
Site Design •Project Site context Module 3: •Site Analysis
Site Plan Requirements
Safety Audit Components
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Design Criteria CTC 440.
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
Pavement Structural Analysis
Walker Street Reconstruction Project 25% Design Public Hearing
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
ACEC Designer Training
Competency: Create site plan drawings
Presentation transcript:

General Road Construction Information Road Building 101 General Road Construction Information Road Building 101 - 4_06_17

Drainage: A Critical Factor Drainage impacts pavement performance when the subgrade materials and pavement layer materials are saturated and loose strength. Water that falls on the pavement surface must be drained to curb and gutter systems or ditches. Water that penetrates the pavement from the surface; infiltrates from the sides of the road; or rises from under the pavement should not be allowed to compromise the overall strength. To account for surface water drainage, it is important that the road be constructed with a crown or cross slope. Typically, a crown is placed in the center of the road and the pavement is sloped 2% in each direction. Road Building 101 - 4_06_17

Reconstruction Grants: Eligible Costs: Any items that are an integral part of the street and road reconstruction which may include feasibility studies, design engineering, grading, base, paving, right-of-way acquisition or the purchase of finished hot mix asphalt. Ineligible Costs: New Roads. Any utility work: new installation or alterations of sanitary sewers and connections, water, gas, electric, telephone, police, fire alarm facilities, parking meters, street signs or similar utilities. Road Building 101 - 4_06_17

Key Road Building Components Crown: The road surface should be higher in the center, not flat Pitch: Road surface should be sloped 2 to 3 degrees lower from the center line to the edges Base: The road surface should be supported by a strong base material, usually gravel Shoulders: Each edge of the road should have a gravel shoulder Ditches Wherever possible ditches should extend a short distance beyond each shoulder Road Building 101 - 4_06_17

Basic Roadway Construction Diagram Road Building 101 - 4_06_17

Typical Northwoods Chip Seal Cross Section Chip Seal Surface Gravel Base Soil Type: Sand Road Building 101 - 4_06_17