IEC TC93 Liaison Report to DASC Alex Zamfirescu IEC USNC TA TC93 Convener IEC TC93 WG2 September 2004.

Slides:



Advertisements
Similar presentations
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
Advertisements

Doc.: IEEE /1454r7 Submission March 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 20 March 2013 Haasz et al, IEEESlide.
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
SC 17A SC 17A Discussion - Need and Process IEEE, Document Need, Dual Logo Maintenance Process New Delhi, India /17 L. Farr and D.
Ashenden Designs IEEE DASC Steering Committee 2 December 2003 San Jose, CA, USA Peter Ashenden DASC Interim Chair.
Submittal of C as an IEC/IEEE Dual Logo Document IEEE Switchgear Committee Main Committee Meeting 18 October 2007.
Ashenden Designs IEEE DASC Steering Committee 20 September 2004 Piscataway, NJ Peter Ashenden DASC Chair.
Ashenden Designs IEEE DASC Steering Committee 19 February 2004 Paris, France Peter Ashenden DASC Chair.
DASC Steering Committee 10 March 2004 Peter Ashenden DASC Chair Victor Berman DASC Vice Chair.
DASC Steering Committee 19 September 2005 Peter Ashenden DASC Chair Victor Berman DASC Vice Chair.
Doc.: IEEE /0748r2 Submission May 2011 Tom Siep, CSRSlide 1 Process for Creating TGai Draft Date: Authors:
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
ISO Liaison Report Hidenori Shinoda Charles Parisot.
INTERNATIONAL ELECTROTECHNICAL COMMISSION Standardization Management Board Decisions How They Affect Your TAG! Jim Matthews Vice President & SMB Chairman.
Ashenden Designs The IEEE Design Automation Standards Committee Peter J. Ashenden, Ashenden Designs DASC Vice Chair
IEEE Design Automation Standards Committee (DASC) Peter Ashenden IEEE DASC Chair.
Dual Logo Procedures Alex Zamfirescu IEC USNC TA TC93 Convener IEC TC93 WG2 November 2004.
Doc.: IEEE /197R3 Submission July 2003 Terry Cole, AMDSlide WG Technical Editor’s Report Opening Session, July 2003 Plenary Meeting Terry.
DASC Steering Committee 17 June 2005 Peter Ashenden DASC Chair Victor Berman DASC Vice Chair.
1 1 JEITA and IEC TC93 update JEITA EDA Technical Committee, Fellow IEC TC93 WG2, Convener NEC System Technologies Satoshi Kojima DASC meeting at DAC2012.
IEC TC93 Liaison Report DASC SC Alex Zamfirescu IEC USNC Technical Aadviser TC93 Convener IEC TC93 WG2 September,
International Electrotechnical Commission International Electrotechnical Commission.
IEC Ed 2 Collaboration IEA Task 32 Round Robin & PCWG Worked Examples NREL, Colorado, US 10 th August 2016 IEC Task 32: Luke J Simmons (DNV GL)
Doc.: IEEE /1454r0 Submission Jan 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 15 January 2013 Haasz et al, IEEESlide.
September Session Chair’s Supplementary Material
ECMA-328 2nd edition Invitation for open review
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Grid Code What is the Standard Modification Process? Panel
Liaison Report Date: Authors: November 2009
Agenda 5.11 General Regulations
WG Technical Editor’s Report
2017 Amendments to the INCITS Organization, Policies and Procedures
The Standards Development Process
Standards Development: An Overview
John D’Ambrosia Recording Secretary, IEEE 802 LMSC
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IEEE P Motions at the July Plenary EC Meeting
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IEC Maintenance Committee Report
WG Technical Editor’s Report
ANSI REFRESHER COURSE 2018 CHANGES TO THE ISO DIRECTIVES
Standardization Management Board Decisions How They Affect Your TAG!
<month year> doc.: IEEE < e> <July 2018>
IEC TC93 Liaison Report DASC SC Alex Zamfirescu IEC USNC Technical Aadviser TC93 Convener IEC TC93 WG2 September,
doc.: IEEE <doc#>
<month year> doc.: IEEE < e> <September 2018>
John D’Ambrosia Recording Secretary, IEEE 802 LMSC
September Session Chair’s Supplementary Material
Submission Title: Portland e/ Liaison Report.
IEEE IMT-Advanced Review Process
July 2010 doc.: IEEE /0xxxr0 Proposed liaison presentation to SC6 in relation to liaisons between IEEE WG and ISO/IEC JTC1/SC 9 May 2011.
Title: LE TG Closing Report for Session #63
Sponsor Ballot Comment Resolution
IEEE IMT-Advanced Review Process
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
Title: LE TG Closing Report for Session #63.5
IEEE P Working Group for Wireless Personal Area Networks
IEEE P Working Group for Wireless Personal Area Networks
DASC Meeting February 21, 2008 Victor Berman, Chair
WG Technical Editor’s Report
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Standards Development Process
IEEE P Wireless Personal Area Network
IEEE P Motions at the July Plenary EC Meeting
Title: LE TG Agenda for Session #63
ANSI REFRESHER COURSE 2019 CHANGES TO THE ISO DIRECTIVES
<month year> doc.: IEEE < e> <September 2019>
Presentation transcript:

IEC TC93 Liaison Report to DASC Alex Zamfirescu IEC USNC TA TC93 Convener IEC TC93 WG2 September 2004

News from IEC TC93 Affecting DASC TC93 meetings will be hosted at IEEE Headquarters during the week of October 3 to 8 IEEE Std 1603 (ALF) was submitted as DL TC93 plans to discuss Interoperability of international standards Simplification in future DA standardization Maintenance procedures of DL Stds. Closer TC93-DASC cooperation envisioned

More on IEEE-IEC Dual Logo Agreement

Submitting Dual Logo Candidates to the IEC Candidate is formally submitted to the IEC Central Office IEC reviews candidate IEC Central Office sends a Question of Principle (QP) ballot to the SMB Should this document move forward as an IEC/IEEE dual logo document? If the ballot passes, the document is sent to the appropriate IEC TC for “fast-tracking”

Current IEEE DASC Dual Logo Submissions Computer Society/Design Automation Committee: IEEE Std 1497-2001 – IEEE Standard for Standard Delay Format (SDF) for the Electronic Design Process.. (IEC 61523-3) IEEE Std 1076-2002 – IEEE Standard VHDL Language Reference Manual ………………………………….. (IEC 61691-5) IEEE Std 1364-2001 – IEEE Standard Verilog® Hardware Description Language …………………… (IEC 61691-4) IEEE Std 1076.4-2000 – IEEE Standard for VITAL ASIC Modeling Specification……………………………….. (IEC 61691-6) IEEE Std 1603-2003 – IEEE Standard for Advanced Library Format (ALF) Describing Integrated Circuit (IC) Technology, Cells, and Blocks

Maintenance Procedure An IEC-TC/SC needs to revise an IEC-IEEE standard IEEE needs to revise an IEC-IEEE standard MCR PAR INFO IEC and IEEE agree on a common need IEC disagrees see note 1 IEEE disagrees see note 2 YES Dual logo maintenance team (DLMT) set up with members from IEC and IEEE and a convenor jointly accepted ( see note 3 ) Maintenance Procedure Dual logo maintenance process see pages 2/3

Maintenance Procedure The DLMT prepares a draft for comments (CD) IEC National Comments ( 3 months ) IEEE experts internal ballot ( electronic ) The DLMT prepares a common compilation of comments with possible proposals for change IEC-TC/SC takes decision by correspondance or at a TC/SC meeting CDV OK? See note 4 IEEE takes decision for the next step ( possibly a second internal ballot ) INFO Ballot OK See note 4 The DLMT prepares a second draft based on commonly agreed changes IEC votes on CDV (5 months) IEEE sponsor ballot ( 30-45 days ) NO YES See note 5 Maintenance Procedure

Revised IEC-IEEE standard Positive results Positive results NO NO INFO See note 6 YES See note 6 IEEE final ballot. Once approved IEC submits the FDIS for final vote (2 months) See note 7 Maintenance Procedure Revised IEC-IEEE standard The DLMT prepares a common compilation of comments on the CDV together with proposals to solve them IEC-TC/SC takes final decisions on the comments by email or at a meeting IEEE takes final decisions on the comments received INFO The DLMT prepares the FDIS based on commonly agreed modifications.

Maintenance Procedure Notes Note 1 – IEC may decide to continue its own route. If any material is used from the IEC/IEEE standard, a separate license agreement will be required. Note 2 – IEEE may decide to continue its own route leading to publish a revised single IEEE logo standard replacing the previous one. If so IEC will withdraw the existing IEC-IEEE standard. Then IEEE may submit to IEC this new standard as a candidate for a possible new IEC-IEEE standard according to the agreement. Note 3 – The organisation which initiates the process, proposes a convenor first. If the proposal is not accepted by the other organisation, another convenor has to be chosen amongst the members of the DLMT by mutual agreement. Note 4 – At this stage, IEC or IEEE are requested to task the DLMT to provide a new draft for comments Note 5 – The 2 ballot processes must be carried out in such a way that the deadlines are the same Note 6 – At this stage, IEC or IEEE may decide either to continue their respective route or to task the DLMT to provide a new draft for vote by both organizations. If IEC decides to continue its own route, then note 1 applies. If IEEE decides to continue its own route then note 2 applies. Note 7 – The comments made at this stage must be limited to corrections of misspelling or obvious errors which may have been generated during the preparation of the FDIS.

Much Needed Joint IEEE/DASC-IEC/TC93 Efforts Establish procedures to address DL Std issues Develop roadmap for next generation standards Common numerics! (involve DATC) Formal specifications, information modularity Develop strategy to cope with standardization complexity Develop strategy to involve industries as well as experts from all the globe