Presentation is loading. Please wait.

Presentation is loading. Please wait.

Liaison Report Date: Authors: November 2009

Similar presentations


Presentation on theme: "Liaison Report Date: Authors: November 2009"— Presentation transcript:

1 802.15 Liaison Report Date: 2009-09-25 Authors: November 2009
November 2009January 2009September 2008 January 2009September 2008 September 2008 doc.: IEEE /xxxxr0 November 2009 Liaison Report Date: Authors: Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

2 Abstract Liaison report on 802.15 as presented to 802.11 November 2009
September 2008 January 2009September 2008 November 2009January 2009September 2008 doc.: IEEE /xxxxr0 November 2009 Abstract Liaison report on as presented to Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

3 802.15.3c 60GHz Alternate PHY Published 12 October 2009 November 2009
September 2008 May 2008 November 2009January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2009 c 60GHz Alternate PHY Published 12 October 2009 Slide 3 Slide 3 Clint Chaplin, Samsung Electronics Page 3 Page 3 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

4 802.15.4 Working on a rollup of 802.15.4 and approved amendments.
September 2008 May 2008 November 2009January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2009 Working on a rollup of and approved amendments. Planning on submitting to ISO/IEC under the PDSO Slide 4 Slide 4 Clint Chaplin, Samsung Electronics Page 4 Page 4 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

5 September 2008 May 2008 November 2009January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2009 e MAC amendments Resolved any TG4f and TG4g open MAC technical issues Finalizing input for the first draft (still) Scheduled for first WG ballot coming out of the January 2010 meeting (two month slip) Slide 5 Slide 5 Clint Chaplin, Samsung Electronics Page 5 Page 5 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

6 September 2008 May 2008 November 2009January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2009 f RFID The seven PHY proposals were given 30 minutes each for a review. Merged many of the PHY proposals into a single document. Heard and discussed two f MAC enhancement contribution presentations. During the last 10 minutes of the Atlanta meeting session TG4f decided to delay voting on document as the TG4f baseline PHY document until the January 2010 session. Continued team building between the PHY proposers and contributors. Slide 6 Slide 6 Clint Chaplin, Samsung Electronics Page 6 Page 6 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

7 802.15.4g Smart Utility Networks
September 2008 May 2008 November 2009January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2009 g Smart Utility Networks Unanimously agreed to create Candidate Draft ready to discuss at January meeting with intention of going to Letter Ballot Agreed updates to PHY requirements document Heard Merge Proposal status Agreed formation of Interoperability / Coexistence sub group Presentations on fading channels Joint meeting with TG4e Slide 7 Slide 7 Clint Chaplin, Samsung Electronics Page 7 Page 7 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

8 802.15.6 WBAN Status Many major mergers happened; down to four groups
November 2009January 2009September 2008 November 2009 WBAN Status Many major mergers happened; down to four groups TG6 is in the process of sorting through proposals and encouraging further mergers PHY proposals include: Narrowband, UWB – IR, UWB –FM, Pulse Chirp UWB, Narrow band (FSK, GMSK, PSK) Frequency bands of interest: 400, 600, 868, 900, 950, 2,400, and MHz Slide 8

9 802.15.7 Visible Light Communication
September 2008 May 2008 November 2009January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2009 Visible Light Communication Accepted a proposed text as the baseline draft text Taking unofficial comments on the baseline draft text; will resolve comments and refine draft text Planning on starting first WG ballot in January Slide 9 Slide 9 Clint Chaplin, Samsung Electronics Page 9 Page 9 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

10 References This document All Documents
September 2008 May 2008 November 2009January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2009 References This document All Documents Current draft is in the members-only area  Members_Only_Area members log in using username and password Slide 10 Clint Chaplin, Samsung Electronics Page 10 Clint Chaplin, Samsung Clint Chaplin, Samsung Electronics


Download ppt "Liaison Report Date: Authors: November 2009"

Similar presentations


Ads by Google