CLAS12 DAQ & Trigger Status

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

GlueX Collaboration Meeting June 3-5, GeV Trigger Electronics R. Chris Cuevas 1.Hardware Status  Production Updates 2.DAq and Trigger Testing 
GlueX Collaboration Meeting May 12-14, GeV Trigger Electronics R. Chris Cuevas Trigger Hardware/Firmware Status  Global Trigger  Installation.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Using the Trigger Test Stand at CDF for Benchmarking CPU (and eventually GPU) Performance Wesley Ketchum (University of Chicago)
GlueX CDC Update and Electronics Outlook GlueX/HallD Collaboration Meeting Jefferson Lab April 2006 Michael McCracken Carnegie Mellon University.
 Brief status update of DAQ/Trigger production hardware  Firmware development for HPS application  CLAS12 CTP ‘upgrade’ notes  Summary Status of the.
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
Prototype of the Global Trigger Processor GlueX Collaboration 22 May 2012 Scott Kaneta Fast Electronics Group.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Technical Part Laura Sartori. - System Overview - Hardware Configuration : description of the main tasks - L2 Decision CPU: algorithm timing analysis.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
AMB HW LOW LEVEL SIMULATION VS HW OUTPUT G. Volpi, INFN Pisa.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
Compton Trigger Design Update Tanja Horn Compton Working Group 6 June 2008.
3D Event reconstruction in ArgoNeuT Maddalena Antonello and Ornella Palamara 11 gennaio 20161M.Antonello - INFN, LNGS.
New L2cal hardware and CPU timing Laura Sartori. - System overview - Hardware Configuration: a set of Pulsar boards receives, preprocess and merges the.
CLAS12 Trigger System part1: Level1 EC Revision 1, Feb 7, 2007.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
Forward Carriage Commissioning CLAS Collaboration Meeting 6/19/2015CLAS12 CalCom Status Update1 ECAL PCAL FTOF Panel 1A FTOF Panel 1B Detector Status PMT.
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Hall–D Level-1 Trigger Commissioning Part II A.Somov, H.Dong Jefferson Lab 12 GeV Trigger Workshop, July 8, 2010  Play Back Test Vector in Hall-D commissioning.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
DAQ Selection Discussion DAQ Subgroup Phone Conference Christopher Crawford
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Use of FPGA for dataflow Filippo Costa ALICE O2 CERN
CLAS12 Forward Tracking: Status and Challenges
PRAD DAQ System Overview
Micromegas Vertex Tracker Status Report
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
CLAS12 DAQ/Trigger/Online Status
CLAS12 DAQ, Trigger and Online Computing Requirements
Sector logic firmware and G-link Merger board designs
CLAS12 Commissioning with Cosmincs
AFE II Status First board under test!!.
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
Commissioning of the ALICE HLT, TPC and PHOS systems
Trigger, DAQ, & Online: Perspectives on Electronics
ProtoDUNE SP DAQ assumptions, interfaces & constraints
FORWARD CARRIAGE UPDATE – March-July 2015
JLAB Front-end and Trigger Electronics
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
Pierluigi Paolucci - I.N.F.N. Naples
Example of DAQ Trigger issues for the SoLID experiment
Preparation of the CLAS12 First Experiment Status and Time-Line
CLAS12 Timing Calibration
Tracker Software Status
Commissioning of the ALICE-PHOS trigger
Search for coincidences and study of cosmic rays spectrum
Current Module LT Testing Capability
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Experiment DAQ and trigger GMn SBS Collaboration Meeting
Presentation transcript:

CLAS12 DAQ & Trigger Status DAQ Overview Trigger Hardware Status Trigger Firmware Development Remaining work and schedule Sergey Boyarinov June 2016

DAQ/Trigger Hardware

CLAS12 DAQ Status Forward Carriage and Pie Tower hardware installed and operational Space Frame and Subway hardware is not installed, waiting for other activities to be complete; we should have enough boards, but inventory still not finished to know for sure DAQ software is operational, was used in HPS and being used in PRAD experiments, as well as in test setups, reliability is acceptable and performance exceeds CLAS12 requirements DAQ+Trigger whole system commissioning (outer detectors only) starts as soon as trigger components are installed

CLAS12 Trigger System Logic

VTP (VXS Trigger Processor) - stage 1 and 3 Four 5GBit links from each VXS slot (more bits for ADC integral, better timing resolution, possible use for readout) 40GBit fiber uplinks (faster data transfer, connect several crates in parallel to form the trigger) Big FPGA and 4GB memory to accommodate ECAL/PCAL clustering and Drift Chamber road finding LVDS output to Trigger Supervisor, and custom IO card CalCom Review

SSP (Sub System Processor) – stage 2 CalCom Review

CLAS12 Trigger Supervisor and Trigger Distribution boards CalCom Review

CLAS12 Trigger Hardware Status All related electronics for outer detectors installed except 1 and 3 stage boards (VTPs) First VPT board was received two month ago, being evaluated by Ben Raydo, almost done, so far everything works as expected Remaining 24 VTP boards will arrive in few days Linux installation on VTP is in progress (Bryan Moffit), following by CODA installation (Sergey) Installation of all boards will start as soon as all features implemented including Linux and CODA installation, may take 2-3 more weeks

CLAS12 Trigger Firmware Trigger algorithms development is in progress, primary goal is to deliver electron trigger (ECAL+PCAL+HTCC) with other detectors following Drift chamber road finding will be developed as well; it is not mandatory for the first run(s), but will do it now while manpower is available and to estimate possible VTP design change before buying 20 more boards for drift chamber crates

CLAS12 Trigger Firmware: development chain Existing reconstruction algorithms review – with detector group experts (Mac Mestayer for Drift Chamber, Cole Smith for ECAL/PCAL) and offline team if necessary Modeling (in C using fixed point arithmetic), output comparison with offline reconstruction VHDL code generation using Vivado HLS tool FPGA loading and cosmic data taking (or playback if available) Hardware trigger output must be identical with the one from modeling; if not, repeat steps 2-5 SO FAR: Items 1-3 (first pass) completed for ECAL

CLAS12 Trigger Firmware: recent progress GEANT-based data files being generated to be used for ECAL/PCAL trigger development (Cole) EVIO banks conversion procedures were developed to produce DAQ-like data banks from GEANT banks, and extract necessary information from ECAL/PCAL offline reconstruction for comparison purposes (Sergey) ECAL/PCAL offline reconstruction banks were modified by adding extra information (U-V-W coordinates) to make possible direct comparison with trigger results (Gagik) ECAL cluster finding and energy correction algorithm was developed, implemented in C and synthesized using Vivado HLS tool (Cole, Sergey) ECAL trigger output was compared with offline reconstruction (5GeV electrons, no PCAL) and shows good agreement (see following slides) Current version of ECAL trigger algorithm is ready for hardware implementation (Ben), several iterations will be needed Work started on PCAL trigger Work started on Drift Chamber road finding dictionary (Dave Heddle)

ECAL cluster finding: difference offline-trigger model (using dividing in coordinate calculation)

ECAL cluster finding: difference offline-trigger model (using lookup table in coordinate calculation)

ECAL cluster finding: 5GeV electron, no PCAL, energy deposition in offline and trigger model Sampling fraction 27%

Vivado High-Level Synthesis (C to VHDL) CalCom Review

CLAS12 Trigger: Drift Chamber hit-based segments 7> ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 6> ---------------- ---------------- ---------------X X--------------- ---------------- ---------------- ---------------- 5> ---------------- ---------------- ---------------X XX-------------- ---------------- -------X-------- ---------------- 4> ---------------- ---------------- ---------------- XX-------------- ---------------- -------XX------- ---------------- 3> ---------------- ---------------- ---------------- XXX------------- ---------------- --------XX------ ---------------- 2> ---------------- ---------------- ---------------- XXX------------- ---------------- --------XXX----- ---------------- 1> ---------------- ---------------- ---------------- -XX------------- ---------------- ---------XX----- ---------------- 0> ---------------- ---------------- ---------------- -XX------------- ---------------- ----------XX---- ---------------- -1> ---------------- ---------------- ---------------- --X------------- ---------------- ----------XX---- ---------------- -2> ---------------- ---------------- ---------------- ---------------- ---------------- -----------X---- ---------------- -3> ---------------- ---------------- ---------------- --X------------- ---------------- -----------XX--- ---------------- -4> ---------------- ---------------- ---------------- --XX------------ ---------------- ------------X--- ---------------- -5> ---------------- ---------------- ---------------- ---X------------ ---------------- ---------------- ---------------- -6> ---------------- ---------------- ---------------- ---XX----------- ---------------- ---------------- ---------------- -7> ---------------- ---------------- ---------------- ----X----------- ---------------- ---------------- ---------------- -8> ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 6> ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 5> ---------------- ---------------- ---------------- ---------------- ---------------- -------X-------- ---------------- 4> ---------------- ---------------- ---------------- ---------------- ---------------- -------XX------- ---------------- 3> ---------------- ---------------- ---------------- ---------------- ---------------- --------XX------ ---------------- 2> ---------------- ---------------- ---------------- ---------------- ---------------- --------XXX----- ---------------- 1> ---------------- ---------------- ---------------- ---------------- ---------------- ---------XX----- ---------------- 0> ---------------- ---------------- ---------------- ---------------- ---------------- ----------XX---- ---------------- -1> ---------------- ---------------- ---------------- ---------------- ---------------- ----------XX---- ---------------- -3> ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- -4> ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- -5> ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- -6> ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- -7> ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- Hardware Trigger Segment angle (-45..+45deg) Modeling Wire number (112..1)

Remaining Work VTP trigger board: first board studies, 25 boards installation and commissioning VTP/SSP/GTP boards trigger algorithms development: ECAL/PCAL/DC models, hardware implementation DAQ & Trigger electronics commissioning on Forward Carriage and Pie Tower Space Frame DAQ electronics installation: remaining crates, boards, cabling, configuration Whole DAQ & Trigger System commissioning

Conclusion Main priority is trigger boards algorithms/programming: work in progress, finishing first model (ECAL) and starting testing in hardware, following by PCAL, Drift Chamber and ECAL+PCAL+HTCC decision Significant part of hardware (DAQ on Subway and Space Frame) still in installation stage, depends on other activities in the Hall, completion time cannot be set as that moment; good news is the all electronics is running in test setups Following months will be used to develop and install trigger system, and perform DAQ+Trigger commissioning for outer detectors