I-15 North Phase 4 Scoping & Project Management Assistance

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Great Western Corridor Feasibility Study
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Cost Estimation System Tool
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 690 (118th Avenue) (C.R. 296). Agenda Introduction Alternative Analysis –Comparison of Compressed ROW and Viaduct –Why the Viaduct –Flyover Alternative.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Nick Johnson, PE Senior Project Manager October 1, 2012.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
N. Burleson St. – Status Update I. Typical Sections & Pavement Design II. Budget and Preliminary Cost Estimates III. Schedule S EPTEMBER 16, 2014.
Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
Interstate 15 North Phase 4 9/01/2015 VE Class. Background: I-15 North Environmental Document, Purpose & Project Elements I-15 North Environmental Assessment.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Transportation System Comments Santolina Level ‘A’ Master Plan.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Interstate 15 North Phase 4 9/01/2015 VE Class
Interstate 15 North Phase 4 Cost Risk Assessment 9/03/2015
Existing Interchange CC 215 Single bridge I 15
I-15 North Phase 4 Project Scoping Overview January 28, 2016
2nd Street Drainage and Paving Improvements
City of New Braunfels Regional Transportation Planning Garry Ford, P.E., PTOE City Engineer June 13, 2017.

Interstate 15 North 8/17/2015 Update
Jefferson County SA Red Rocks Site Approval
The I-465 West Leg Reconstruction Project
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
Downtown Valdosta Truck Traffic Mitigation Study
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Fordham at Columbia as a Grade-Separated Intersection
Interstate 15 North Phase 4 Cost Estimates 09/03/2015
Interstate 15 North 4/09/2015 Update
Interstate 15 North Phase 4
UTILITY DESIGN SERVICES
I-15 North Phase 4 Scoping & Project Management Assistance
Interstate 15 North Phase 4 8/19/2015 Update
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
IA 122 RECONSTRUCTION PRE-BID MEETING
General Tab Project, Cost Schedule, and Work Limits Roadway Character
US26: Cornelius Pass Rd -185th Ave
Construction Management & Inspection
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Upcoming Major Projects Nevada Transportation Conference April 9, 2013
Issaquah-Fall City Road
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
STATE SUEE AND ONE WAY CORRIDORS
Lyle Parkway to SR 540 (Winter Lake Road)
1200 West Widening and Reconstruction Project
Contract 60X10 Informational Meeting Weber I-55
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Walker Street Reconstruction Project 25% Design Public Hearing
Fordham at Columbia as a Grade-Separated Intersection
2019 Capital Program Title of Presentation
Metropolitan District | mndot.gov
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
November Bond Election
Presentation transcript:

I-15 North Phase 4 Scoping & Project Management Assistance Value Engineering Project Overview February 4, 2016 Self introduction, Project Name,

I-15 North Corridor PHASE 4 PHASE 3 TBD SPEEDWAY BLVD PHASE 2 2016 CRAIG RD PHASE 1 COMPLETE The subject of this Value Engineering study is the I-15 North Phase 4 project. This project is one is a series of project initially developed as a part of the I-15 N Corridor study. The Ph1 project has been completed. This phase included improvements to the I-15 from the Spaghetti Bowl to Craig. The Phase 2 project is from Craig to Speedway and will widen I-15 to 3 lanes and add Aux. lane between the ramp. Phase 2 is being advertized for construction (?). The Phase 3 project will is from Speedway to Apex and will include improvements similar to Ph 2. The project we are her to discuss is the Phase 4 project, which is the construction of the I-15/CC215 system interchange. This project also includes conversion of the interim beltway facilities to freeway standards, a service interchange at I-15 and Tropical parkway and CC215 access from the local roadway system. The details of these improvement will be discussed in detail later in the presentation.

Planning Area North East Las Vegas Valley FF APEX INDUSTRIAL PARK The I-15/CC215 Interchange is located in the City of North Las Vegas, in the north west corner of the Las Vegas Valley. It is surrounded by a wide variety of land uses and proposed developments which include: Nellis AFB Nevada Nat. Guard, Proposed Park Highlands and other residential developments to the west along the CC215 UNLV north Campus CNLV Industrial Developments to the east of I-15 and in the Apex industrial park to the north. The “FF” denotes the location of the recently approved Faraday Futures site.

Related Projects I-15 North Phase 2 - Bidding Tropical Parkway – In Design Range Wash, RR Channel Detention Basin – In Design CC215 Freeway (future 2020 funding) Centennial Parkway (future unfunded) HOV Lanes, I-15 to CC215 (potential)

Project Goals and Objectives Provide Analysis to Identify… “Most Desirable Interchange Layout” Complete I-15/CC215 System Interchange Address Local Access: AADT Range Rd 6,400 Tropical Pkwy 13,200 Centennial Pkwy 13,900 The goal of the current phase of the I-15 North Phase 4 project is to: Identify the most desirable system interchange layout. Address local access issues to Range Road, Tropical Parkway and CP. This VE analysis is one of the last steps in the development of the “most desirable interchange layout” Thus far we have analyzed two system interchange options, considered local access requirements and have developed a preferred alternative abased on this analysis.

Preferred Alternative

Preferred Alternative 2-Level System Interchange with 50 mph Direct Connect Ramps Tropical Parkway Service Interchange CC215 Grade Separated over Centennial Parkway CC215 service Ramps Local Roadway Connections Compatible with Future HOV Construction Conceptual plans are available for the VE workshop. Construct Direct Connection Ramps. NW, SW, EN, ES Complete Tropical Parkway Service Interchange, new ramp connections to SB I-15, reconstruct existing NB connections. Remove existing signalized intersection at Range Road and CC215 and replaced with grade separated structure over Centennial Parkway. Construct service ramps to CC215 Minimize local roadway construction Compatible with future HOV.

Preferred Alternative 2-Level System Interchange with Ramp “EN” top Level Ramp “NW” over I-15, Under “EN” “SW” At Grade, Over Tropical Pkwy. Tropical Pkwy. Over I-15, then at Grade CC215 Over Centennial Pkwy (not shown) “ES” “EN” “SW” “NW”

Preferred Alternative Combined System and Service Interchange on and off ramps (AASHTO Preferred) Note: Ramp “ES” uses existing bridge over UPRR spur and Range Road New Structure required for Ramp “NW” over UPRR spur and Range Road

Preferred Alternative Local Roadway Connections Centennial Parkway Realignment Range Road Realignment Tropical Parkway Extension CC215 Over crossing Additional ROW may be needed for utillities BLM Realign CP to follow section line. RRS to Tee into CP and CC215 off ramp, RRN reconstructed to provide access to Nellis Small Arms Range and Nat. Guard. Access controlled. Tropical Parkway extension. Only half width construction needed until Centennial Parkway is extended to the east and west. CC215 Over crossing Service ramp to WB CC215

Preferred Alternative Future HOV Connection Center Running HOV in I-15 and CC215 HOV Lanes Cross under Ramp “EN” “EN”

Preferred Alternative Tropical Parkway Over I-15 Existing Bridge has sufficient width for 2 thru lanes and left turn lanes. No Widening Required.

Preferred Alternative “ES” Ramp over UPRR Existing Structure 2-Lanes Wide Lane Drop on “ES” Prior to UPRR Overcrossing Ramp “R4” merges with “ES” as added lane Structure widening not Required “ES” UPRR – 2-Lane Structure “R4” SB I-15

Preferred Alternative CC215 Over UPRR Existing Structure 3-Lanes Wide (EB and WB), No additional width required WB CC215 3-lanes at UPRR Lane Drop to match existing after UPRR EB CC215 Add Lane prior to UPRR New CC215 Off Ramp (“R6”) to Centennial PKWY. New structure over UPRR WB CC215 UPRR “R6” EB CC215

Preferred Alternative Drainage – With Project Perpetuate existing flow paths. Extend existing culverts to accommodate new ramps. Consider small basin to reduce impacts to Range Road.

Preferred Alternative I-15 North Phase 4 Utility Conflict Matrix Utilities I-15 North Phase 4 Utility Conflict Matrix Location Utility Utility Owner Conflict I-15/Range Road 8" Petroleum Kinder Morgan None: Protect in place 14" Petroleum 6" Petroleum (Abandoned) 8" Water Line City of North Las Vegas 18" Water Line 8" Sanitary Sewer Line Clark County Water Reclamation District Fiber Optic Zayo 4" Gas Southwest Gas Conflict with proposed bridge piers (CC215 Ramps over Range Road) 4" Electric NV Energy (2) 4" Telephone Century Link CC215/Range Road Conflict with proposed bridge foundation (CC215 over Centennial Parkway) (2) 4" Electric 24" Water Line Fire Hydrant Conflict with future HOV Ramp I-15/215 Ramp Crossovers Ramp embankments SW, NW, ES to be constructed over sewer line and Ramp R5 excavation over sewer line Military Road Proposed Tropical Parkway Extension to be constructed over sewer line 48" SSMH Centennial Parkway/MilitaryRoad Proposed Centennial Parkway to be constructed over manhole Majority of utility impacts at two locations

Phasing Plan

Phasing Plan Phase 1 Remove Signals on CC215 Complete Tropical Parkway Service Interchange Re-align Range Road Centennial Parkway ½ Width Construction Construction Cost ~ $45.2 m NW and EN Movements Through Service Interchange

Phasing Plan Phase 2 Construct NW and R1 Ramps Construction Cost ~ $39.9 m EN Movements Through Service Interchange

Phasing Plan Phase 3 Construct EN and R2 Ramps Construction Cost ~ $34.2 m System Interchange Complete

Construction Costs

Construction Costs Estimates I-15 NORTH PHASE 4 PRELIMINARY COST ESTIMATE ITEM PREFERRED ALTERNATIVE PHASE 1 PHASE 2 PHASE 3 ROADWAY $ 22,438,550.00 $ 16,565,040.00 $ 4,036,860.00 $ 2,055,220.00 STRUCTURES $ 54,057,750.00 $ 8,371,600.00 $ 23,399,500.00 $ 22,336,650.00 TRAFFIC $ 8,235,000.00 $ 5,336,000.00 $ 2,064,000.00 $ 1,234,000.00 UTILITIES $ 585,650.00 $ 585,650.00   DRAINAGE $ 2,968,380.00 $ 2,870,180.00 $ 502,400.00 $ 73,800.00 LANDSCAPE/AESTHETICS $ 2,648,560.00 $ 1,011,855.00 $ 900,083.00 $ 770,991.00 EROSION CONTROL $ 441,427.00 $ 168,643.00 $ 150,014.00 $ 128,499.00 MOBILIZATION $ 6,396,273.00 $ 2,443,628.00 $ 2,173,700.00 $ 1,861,942.00 SUBTOTAL CONSTRUCTION $ 97,771,590.00 $ 37,352,596.00 $ 33,226,557.00 $ 28,461,102.00 CONTINGENCY $ 19,554,318.00 $ 7,470,519.00 $ 6,645,311.00 $ 5,692,220.00 TOTAL CONSTRUCTION COST $ 117,325,908.00 $ 44,823,115.00 $ 39,871,868.00 $ 34,153,322.00 RIGHT-OF-WAY COST $ 384,000.00 $ 384,000.00 $ - TOTAL COST $ 117,709,908.00 $ 45,207,115.00 The total for the phased project is more than the preferred alt. The estimates anticipate additional costs from traffic control, re-excavation, interim drainage and erosion control.

I-15 North Phase 4 - Utility Relocation Cost Estimate Utility Costs Estimate Utility relocation costs based on an evaluation of utility conflicts identified on the conceptual plans. I-15 North Phase 4 - Utility Relocation Cost Estimate Location Utility Quantity Unit of Measurement Unit Price Preliminary Cost CC215/Range Road Relocate 8" Water Line within CC215 and Centennial Parkway R/W 330 LF $150.00 $49,500.00 Relocate (2) 4" Electric within CC215 and Centennial Parkway R/W 220 $33,000.00 Relocate (2) 4" Telephone within CC215 and Centennial Parkway R/W Relocate 4" Gas within CC215 and Centennial Parkway R/W 325 $48,750.00 Relocate 24" Water Line within Centennial Parkway R/W 392 $500.00 $196,000.00 Relocate Fire Hydrant within Centennial Parkway R/W 1 EA $5,000.00 Relocate Fiber Optic within CC215 and Centennial Parkway R/W 250 $200.00 $50,000.00 I-15/CC215 Ramp Crossovers Upgrade 8" Sanitary sewer line steel encasement 832 $166,400.00 Tropical Parkway Adjust 48" SSMH to grade 2 $2,000.00 $4,000.00 TOTAL $585,650

Preferred Alternative Traffic Forecasts Traffic Analysis Study Area

Constraints Identify the most desirable system interchange layout. Address local access issues Range Road, Tropical Parkway and Centennial Parkway Minimize Environmental Impacts Avoid BLM Properties Minimize ROW Impacts Phased Project that meets Financial Constraints UPRR Overcrossings

Questions?