Diagnostic & Control Status

Slides:



Advertisements
Similar presentations
Dicembre 2009SPES Control System Group Acquisition using VME boards Conforto Nicola.
Advertisements

Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Linac4 BPM and Phase Pickup L. Søby08/ LINAC4 Beam Position, Phase and intensity Pick-ups.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
IP-BPM NOV. BEAM TEST RESULTS Siwon Jang (KNU). 11cm Low-Q IP-BPM design  11cm Low-Q IP-BPM drawings of HFSS 100mm Sensor cavity Wave guide Antenna Designed.
AWAKE electron source New Electron Source WP at CERN
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Influence of the Third Harmonic Module on the Beam Size Maria Kuhn University of Hamburg Bachelor Thesis Presentation.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
Beam diagnostics in the beamlines
Booster Top-off Computer Controls System C. Timossi November 22, 2004.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Kévin Pepitone 1CLIC project meeting, CERN, December 1st, 2015 Kevin PEPITONE, BE-RF Drive Beam Injector Gun.
The Quadrupole Pick-up in the CPS -intro and progress report PPC 3 Dec 1999 A. Jansson.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
E-cloud studies at LNF T. Demma INFN-LNF. Plan of talk Introduction New feedback system to suppress horizontal coupled-bunch instability. Preliminary.
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
1 NBI Rh. Jones (CERN - AB/BDI) CNGS Target Area Beam Position Monitors OUTLINE 1.Recap of Requirements & Layout 2.Monitor Candidates -Secondary.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
High intensity electron beam and infrastructure Paolo Valente * INFN Roma * On behalf of the BTF and LINAC staff.
11th February th CTF3 Committee - Wilfrid Farabolini1 Status and progress of the CTF3 probe beam 1.
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Workshop JRA1- INFN Legnaro, 19/2005
Summary of SPARC first-phase operations
l 66TH MEETING OF THE ESRF l May 2014 l Author
E-beam scanner experience at FNAL
ATF/ATF2 Control System
Slice Parameter Measurements at the SwissFEL Injector Test Facility
BE-BI Software for LINAC4
Have a chance to operate your own beam at CERN
IMAGE ORTHICON.
Diagnostics for ThomX Nicolas HUBERT, Marie LABAT, Moussa EL-AJJOURI, D. PEDEAU, Synchrotron SOLEIL Iryna CHAIKOVSKA, N. DELERUE, LAL.
OTR based measurements for ELI-NP Gamma Beam Source
Installation status and planning
AWAKE status and readiness for phase #2
Photon beamline crates
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
Thermal emittance measurement Gun Spectrometer
> 50 dB ≤ 500 MHz Non-intercepting beam position measurement
ERL BPM System Mike Billing, Mark Palmer
Electron Source Configuration
Status of muon monitor R&D and construction
Advanced Research Electron Accelerator Laboratory
Linac/BC1 Commissioning P
Compact linear accelerator FLUTE: status update
High Level applications development status
High Level Physics Applications for LCLS Commissioning
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Breakout Session SC5 – Control Systems
Diagnostics RF and Feedback
Linac Diagnostics Commissioning Experience
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
Injector Diagnostics Status
J. Seeman Perugia Super-B Meeting June 2009
Generation of Magnetized Bunched Electron Beam for MEIC Cooler
Experience with photoinjector at ATF
Isotope Readiness Review Run Plans
Presentation transcript:

Diagnostic & Control Status G. Di Pirro IV Review SPARC 14-06-2005

Diagnostics GUN Emittance BPM Charge Emittance measure RF deflector Energy and Energy spread IV Review SPARC 14-06-2005

Movable Emittance-Meter envelope IV Review SPARC 14-06-2005

In the last review we have the final project V. Lollo IV Review SPARC 14-06-2005

Now we have the object IV Review SPARC 14-06-2005

Target YAG Cromex We continue test in the DAFNE BTF IV Review SPARC 14-06-2005

BTF YAG MEASUREMENTS Test acuisition system for the e-meter (digital camera with a commercial optics with 1:1) Qualitative study of the YAG screen compared with other know screen (CROMOX) IV Review SPARC 14-06-2005

MEASUREMENT SCHEME: Yag screen Macro lens (1:1) Basler camera Firewire interface IV Review SPARC 14-06-2005

MEASUREMENTS: CROMOX VS YAG (SAME BEAM) GRADIENT PALETTE IV Review SPARC 14-06-2005

ANALYSIS (1): 150pC CROMOX (AU) YAG (AU) IV Review SPARC 14-06-2005

ANALYSIS (2): 120pC IV Review SPARC 14-06-2005

ANALYSIS (3): 50pC IV Review SPARC 14-06-2005

(3) Fit dopo il taglio in frequenza dello Yag IV Review SPARC 14-06-2005

(4) IV Review SPARC 14-06-2005

Beam Position Monitors will be installed before, between, and after the accelerating structures, as well as in the transport sections before the undulator. BPM system parameter IV Review SPARC 14-06-2005

Matched striplines are used in each BPM for the simultaneous readout of the horizontal and vertical positions. The intensity information can also be derived from the sum of the signals. Vacuum pipe diameter 47.4 mm Stripline diameter 39.4 Stripline angular width ~30 degree Stripline length 13.6 cm Characteristic impedance 50 W Strips thickness 1 Max of transfer impedance 2.08 Sensitivity 1.255 mm/dB pickup design parameter IV Review SPARC 14-06-2005

BPM detection IV Review SPARC 14-06-2005

Change with a Bergoz Why? Difficult to learn the apparatus we don’t have the time Delivered time is to high about 9 month Not clear the single pass operation IV Review SPARC 14-06-2005

Faraday cup IV Review SPARC 14-06-2005

Faraday cup R. Sorchetti IV Review SPARC 14-06-2005

RF deflector Bunch length Emittance Slice Emittance IV Review SPARC 14-06-2005

V. Lollo V. Lollo IV Review SPARC 14-06-2005

V. Lollo IV Review SPARC 14-06-2005

V. Lollo IV Review SPARC 14-06-2005

Targets All target position are defineted. The target in OTR. Camera: Basler IEEE1394 camera buy Hamamtsu high efficency IV Review SPARC 14-06-2005

Control Status IV Review SPARC 14-06-2005

IV Review SPARC 14-06-2005

IV Review SPARC 14-06-2005

Operating system download Data storage Data base ....... Electronic logbook Web information Automatic acquisition ....... Magnet Vacuum Diagnostic ........ IV Review SPARC 14-06-2005

Using DAFNE Control system software IV Review SPARC 14-06-2005

IV Review SPARC 14-06-2005

Using DAFNE Control system software Dafne front end CPU ported in new configuration Service program under test Starting program under test and some control window under porting and test IV Review SPARC 14-06-2005

Control room IV Review SPARC 14-06-2005

Control room IV Review SPARC 14-06-2005

Control room IV Review SPARC 14-06-2005

Control room 5 CPU with 2 monitor and two Ethernet connection 10/100/1000 1 server 1 service CPU 1 optical switch CISCO in home 3 switch 10/100/1000 CISCO in home IV Review SPARC 14-06-2005

Network IV Review SPARC 14-06-2005

Network IV Review SPARC 14-06-2005

Network IV Review SPARC 14-06-2005

Network 2 2 2 2 2 2 IV Review SPARC 14-06-2005

SOFTWARE IV Review SPARC 14-06-2005

Magnet To control a magnet means to control a power supply. 9 Solenoids Modbus protocol 12 Quadrupoles + 8 3 Bendigs 12 Steering correctors Software is imported from Dafne control system IV Review SPARC 14-06-2005

RF Modulators: come with an Ethernet interface. It is based on Siemens PLC it send at 10Hz the complete status. Driver tested and start portin under control system. Amplifier (Milmega) is remote controlled trough Ethernet Defined number and type of control. Software under development 50 pulse shape phase and amplitude readout digitizer 15 attenuator and phase shifter motorized 4 analog signal 6 digital I/O IV Review SPARC 14-06-2005

Vacuum Pump 24 software completed Vacuumeter 6 software completed 3 Analog signal 1 digital input 1 digital output Ethernet as field bus. Vacuumeter 6 software completed serial interface acquired an Ethernet to serial converter with 8 port IV Review SPARC 14-06-2005

Diagnostic Acquisition camera. Flag movement. BPM reading. Acquisition software installed in TTF2 and working (12 fps on 100Mbit Ethernet) IEEE1394 Software under test Flag movement. Stepper motor. Driver completed software under development BPM reading. PCI board Charge monitor reading Electronic from Bergoz acquisition with PCI multimeter IV Review SPARC 14-06-2005

IV Review SPARC 14-06-2005

IV Review SPARC 14-06-2005