Subject: INJECTION SYSTEM Junction LINAC4-booster

Slides:



Advertisements
Similar presentations
G2p Hall Infrastructure Alan Gavalya May Overall g2p Target on Pivot in Hall A.
Advertisements

Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Liquid Hydrogen Absorber
BumperBot uses two contact switches to go through a labyrinth. Bumper.
Internal H0/H- dump Cesare Maglioni, Melanie Delonca Thanks to: R. Chamizo, R. Versaci, O. Aberle, J. Borburgh.
Elvin Harms, Tom Peterson, Yuriy Orlov, Frank McConoloque.
HEL pre-design Diego Perini Superconducting solenoid Operation temperature: 4.2 K, current:about 250A, magnetic field: 5 Tesla Cooled by liquid.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
US ITER TBM Meeting Idaho Fall, Idaho, Aug M Dagher P Fogarty 1.TBM/ITER General Arrangement 2.Equatorial Test port Configuration 3.Test Port.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
H 0 -H - PSB INJECTION VACUUM REQUIREMENTS C. Pasquino, P. Chiggiato, J. Hansen PSB - H0-H- injection review meeting, 18th April 2013.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA DESIGN Ans Pardons HiRadMat review, 26 th of May 2011 Outline  Location of experimental area & services.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
Electrostatic Septum For AGS C. Pai Brookhaven National Laboratory Collider-Accelerator Department
Technology Department 1 Stripping Foil and instrumentation R. Noulibos - W. Weterings – Pieter Van Trappen Technical meeting 21-mai-2014 L4 – PSB - Injection.
20to2T5m100cm Images Van Graves February 13, 2014.
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
ENEN H- INJECTION: STATUS ON MECHANICAL DESIGN - VACUUM SECTORIZATION - BHZ162 CHAMBER MODIFICATIONS - DUMP AREA - BHZ11 CHAMBER MODIFICATIONS.
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Internal H0/H- dump M. Delonca, C. Maglioni On behalf of EN/STI Thanks to: A. Christov, S. Mathot, C. Pasquino, A. Patapenka.
Managed by UT-Battelle for the Department of Energy SNS Injection and Extraction Systems Issues and Solutions by M. Plum for the SNS team and our BNL collaborators.
Transformer positions for BISMV and BSW M. Hourican 2 March 2015.
Status of MAMI C Hans-Jürgen Arends CB-Meeting, Basel October 4-6, 2006.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Ch. Vuitton – BE/BI Presented by R. Veness – BE/BI 18th October
Review on shorter PSB main bending magnets Injection layout with short magnets Advantages & Disadvantages Wim Weterings
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato 1LIU - PSB Ho-H- Injection Meeting.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone 22 th November 2012 LIU-PSB.
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
HIRADMAT/ IRRADITION facilities Overall view with the biggest object to irradiat, T9 shielding with TED inside and the beam dump with 12 meters of cast.
Mechanical Upgrade Interaction Region IR1 Luigi Pellegrino Mechanical Engineering Group (LNF Scientific Committee, May 9, 2013)
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Wim Weterings Remy Noulibos
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Linac4-PSB 160 MeV connection readiness review
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
J.-L. Sanchez Alvarez(PSB-EIC)
Wire Scanner / A.Demougeot
ELENA installation and commissioning status
Online check lists Half Sector Test
General remarks about the HESR and PANDA vacuum system
PANDA Yoke of the Magnet
Impact of TIDVG problem on LSS5 dump design schedule
F. Zocca, F. Roncarolo, B. Cheymol, A. Ravni,
Status of the BI Work Package in the LIU-PSB frame
HALF SECTOR TEST: a test for the future PSB injection
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Additional Upstream Coil Shielding
Magnetic gap calculation
Lucius Skid Pics
Additional Upstream Coil Shielding
NPS mechanical design 11/13/2018 Jlab meeting
Hall C Dump Status Beam Resuscitation Review
ISO view of pipe w/ individual EC detector installed
Bunker Wall Design Wall
Bunker Wall Design Wall ESS
Single Detector Design
SNS PPU Cryomodule Instrumentation
Presentation transcript:

Subject: INJECTION SYSTEM Junction LINAC4-booster Suivi Activité Octobre 2016 – Laurent Zuccalli Subject: INJECTION SYSTEM Junction LINAC4-booster 19/10/2016

Introduction to H- INJECTION SYSTEM H- INJECTION AREA H0 H- Circulating beam Injected beam Linac 4 Chicane beam H+ Dump interne Stripping Foil 19/10/2016

Introduction to H- INJECTION SYSTEM DOWNSTREAM VACUUM UNIT UPSTREAM H- INJECTION LINE BHZ11 BHZ162 PUMPING MODULES WELDED SUPPORT FRAME BSW4 CHICANE MAGNET UNIT VERTICAL FRAME + BOLTED SUPPORT TABLES BSW2-3 CHICANE MAGNET UNIT BSW1 CHICANE MAGNET UNIT 19/10/2016

Connections 19/10/2016

Line H- INJECTION SYSTEM BSW1 UNIT (INJECTION) INJECTION BEAM PIPE BSW2-3 UNIT (STRIPPING UNIT) BSW4 UNIT (INTERNAL H0/H- DUMP) BHZ162 BEAM PIPE STRIPPING SYSTEM BHZ11 BEAM PIPE H0/H- DUMP SHIELDING PUMPING MODULE 19/10/2016

BSW4 with Dump Dump 19/10/2016

Assembly the DUMP in the CHAMBER BSW4 19/10/2016

Assembly DUMP + Monitor Plate Dump H0/H- (Titane) Pins de connexion Plaque de contrôle (Titane 1mm) Fils Cuivre 0.75 mm + perles Céramique 19/10/2016

Connector DUMP SUB-D Fils Cuivre 0.75 mm + perles Céramique Pins de connexion Connecteur Sub-D 19/10/2016

Bloc DUMP cooling Feedthrough Sub-D cooling 19/10/2016

Extraction BINDER 19/10/2016

Junction Linac4-Booster Zone H- transformateurs 19/10/2016

Questions ? 19/10/2016