CYCLONE Filtration System.

Slides:



Advertisements
Similar presentations
Dust Collector Presentation EnTech Industries
Advertisements

Presentation Heading Air Source Heat Pumps Jordan Jeewood
Slide 1 CP Rectifier development – A tight squeeze. Richard Brodribb, M. Brodribb Pty Ltd
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Trane Voyager™ rooftop units
Technical Committees – the Brains of ASHRAE Section 1.0 — Fundamentals and General.
HEAT PUMPS.
PLANT HVAC SYSTEMS DU-109-PP PLANT HVAC SYSTEMS.
Coupling a Network HVAC Model to a Computational Fluid Dynamics Model Using Large Eddy Simulation Jason Floyd Hughes Associates, Inc Fire + Evacuation.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
Ignition Systems. Define These Terms: Electricity Conductor Insulator Magnetism Induction Primary Windings Secondary Windings.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
(Heat Pump Heating with Fossil Fuel supplemental Heat)
9. Cleanroom Testing and Monitoring. Purposes for initial test: Fulfill the design –working correctly and achieving the contamination standards Bench-mark:
With over 60 years experience Mondial Forni ensures the highest baking quality and maximum reliability in their ovens. The Ciclomondial combustion gas.
CIWMB Conference October 17, “Distributed Urban Biomass Power Production”
1 MCC PRESENTATION - GMP MANUFACTURING ENVIRONMENTS Presented by : Deryck Smith Consulting Engineers Module 3.
E2 Motors and Motor Starting
High Density Cooling Air conditioning for high density applications
SGE-SP Presentation-e.ppt page 1, Short presentation of the Gebhardt products on the USA Internet site Dr. Hermann Mauch.
Air Intake.
HEAT EXCHANGER.
Lindab | comfort Architect Luna, Prisma, Circum. lindab | comfort Architect Luna, Prisma, Circum Upgrade of current well-known Architect with over 250.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
The following advertisement is created for the sole purpose of understanding the Commissioning process. The following advertisement is created for the.
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
7.3.4 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Components and Operating Characteristics of Limit and Fan Controls.
(U-shaped tank) WATER TANK SLUDGE TANK This system makes it possible to recover the liquid part of the suctioned material in the sludge compartment.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
Tomislav Skračić, MA Undergraduate English Course for MARINE ENGINEERS 5th Semester Essential reading: SPINČIĆ, A., PRITCHARD, B, An English Textbook For.
LESSON THIRTEEN LUBRICATING OIL SYSTEM. 1.PRIMARY PURPOSE OF LUBRICATION To keep a clean layer of lubricating oil film / luboil film between the contacting.
Product Section Product Training. 50 Hz R410A R22 R407C Ceiling Convertible CE-E Series.
Alex Gee Jon Locke Joe Cooper Kylie Rhoades Clara Echavarria Ice Energy Extraction.
AIR HANDLING SYSTEM © Commonwealth of Australia 2010 | Licensed under AEShareNet Share and Return licence.
AHCAL Mechanics status report Karsten Gadow CALICE Collaboration Meeting Argonne,
To complete installation on electronic models run one wash cycle then click the DIP switch setting no.4 to the on position DIP switch settings.
SKAO Power Update 2015 Engineering Meeting: Penticton Adriaan Schutte
OE OXYGEN ENRICHED BURNER
ATCA cooling tests Claudio Bortolin (PH-ADO) Damian Dyngosz (PH-DT) George Glonti (PH-UAT) Julian Maxim Mendez (PH-ESE) Lukasz Zwalinski (PH-DT) xTCA IG.
Solar Orbiter EUS: Thermal Design Progress Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Progress Bryan.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
 Headquarters and distribution- Sterling, VA.  Offices is Baltimore and Pittsburgh.  Established in  32 employees.  Small business.  25,000.
Career Ready Coordinators Training Session one Website navigation Coordinator dashboard Student recruitment and selection.
.AIR COMPRESSOR.  Single Stage Air Compressor.  Two Stage Air Compressor.  Multi Stage Air Compressor. PRESENATION ON…. Contact us :
EMERGING TECHNOLOGIES AVAILABLE TO REDUCE COMPRESSED AIR DEMAND Double Acting Air Cylinder Double Acting Air Cylinder Air Operated Diaphragm Pumps Air.
R.N.S. INTERNATIONAL Heat Pumps
Update on the PSB Cooling and Ventilation Systems
Greenhouse Ventilation and Cooling
Maria’s Restaurant Chapter 1 Section 4
The Data Center Challenge
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Air Distribution Control
S.T.B.S College of Diploma Engineering, SURAT
CEDAR Detector Ventilation System Review
AHU connection kit.
Section 1.0 — Fundamentals and General
PLUMBING APPLIANCES & COMPONENTS
Vita 83 Working Group proposal for Rugged packaging,
Importance of Coolant for your Car
TRENTON Casing Filler Presentation
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
Changes of state in nature

Add to table of contents:
Psych DMA Fully Functioning Individual
Objective Revie the Cooling Cycle Learn about air distribution systems
Tests of Endcap capillary & Heat exchangers at CERN
Replacing TrueAir Thermostat with Ecobee SI
Using the FAST Page Builder
Presentation transcript:

CYCLONE Filtration System

Description The Cyclone Filtration System – ALL TESTS HAVE BEEN COMPLETED We have manufactured the unit (completed). Fitted to the test container (completed). Run a heat load test without the filter (completed). We can remove Approx. 6 kW worth of heat from the container , without the filter system (completed). We can remove 3kW worth of heat from the container but have found that the filter restricts the fan flow and the fan gets hot (completed). We have ordered another filter that is less restrictive and testing should start on Tuesday the 23rd of October 2014. (Complete) We have also designed an air curtain which has 3 purposes- 1 ) To distribute the cool filtered air through the container . 2) To distribute the cool filtered air to various hot areas in the container via louvers .3 ) To act as a secondary filter if MTN decides to use the system without the paper filter(still to be discussed). The air curtain has been designed and is in the process of being manufactured . It should be ready and fitted by the 29th of October 2014. (Complete) The air curtain will be supplied in at least 3 configurations -1) With perforations 2) With fixed louvers 3) With 2 fixed louvers options. (No 1 Completed) Once all of this is in place we will test and verify the air quality inside the container with the Cyclone air filter system operational. (In Progress)   Phasing the system into MTN The system has been designed to be implemented in 3 stages Stage 1 fitment of the cyclone filter and air curtain (retro fit to any site) Stage 2 implementation of our mini PMC for control of the cyclone filter only(retro fit to any site) Stage 3 implementation of our fully fledged PMC for total site control (retro fit to any site but more suited to new build sites)

Pictures Filtration System

Pictures Filtration System

Pictures Filtration System

Drawing Filtration System

Drawing Filtration System

Sectioned View Filtration System

Inner View Filtration System

Power Management Controller (PMC)

Power Management Controller (PMC)

Power Management Controller (PMC)

Thank you For any queries please contact: Romano Bevilacqua : +27 (0)79 529 8150 Brandon Harcus : +27 (0)82 709 7335