RURAL POTABLE WATER INFRASTRUCTURE WATERLINE AND TRUCKFILLS

Slides:



Advertisements
Similar presentations
Regional Water Service Development Cost Charges Update October 2014 Bryan Shoji, P.Eng. General Manager, Infrastructure Services.
Advertisements

Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
Annexation Presentation 06/10/20141 Planning for our Future.
Guild Road Industrial Park Workshop. Guild Road Industrial Park Incubator Study identified a lack of market for a successful incubator in Woodland. Consultant.
Sunshine Coast Regional District Development Cost Charges July 3, 2014 Infrastructure Services Committee Bob Twerdoff.
Los Osos Community Services District Basin Management Planning and Proposed Work Program June 5, 2008.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Model Home Permitting and Temporary Certificates of Occupancy Orange County BCC August 25, 2015.
VOLUSIA TRANSPORTATION PLANNING ORGANIZATION (TPO) NOVEMBER 27, 2012 Craig Coffey, County Administrator 1.
Southwood Waterline Project Shawnee Twp. House 7:30 PM November 29 th 2000.
Colorado Front Range Trail Corridor Plan Colorado Front Range Trail Corridor Plan.
Baseline Scenario Quality Growth Strategy.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
Transportation System Comments Santolina Level ‘A’ Master Plan.
Carolina North Carolina North Annual Report for Chapel Hill Town Hall September 29, 2010.
City of Johnston East of Merle Hay Road Infrastructure Improvements Council Meeting – NW 55 th Avenue Street Special Assessment February 17, 2015.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
City of Bend Biennial Budget Budget Committee Deliberations May , 2011.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
Water Reclamation Plant Feasibility Study Update July 23, 2014.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
San Francisco Public Utilities Commission Water System Improvement Program Bay Division Pipeline Project July 14, 2009.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Harwich, Massachusetts Overview of Comprehensive Wastewater Management Plan (CWMP) East Harwich Planning Workshop June 4, 2014 East Harwich Planning Workshop.
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
OAK RIDGE NORTH IMPACT FEES. Overview 1.Introduction 2.Schedule/Process 3.Land Use Assumption 4.Capital Improvement Plan Water Wastewater 5.Impact Fees.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
1 TIF 9 (Trinity River Vision) Expanded and Updated Project and Financing Plans December 8, 2009 Presented to the City Council Jay Chapa Housing & Economic.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
City of Oceanside Melrose Drive Extension Public Scoping Meeting March 13, p.m.
Hillsborough County Public School Siting MPO SCHOOL TRANSPORTATION WORKING GROUP
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
Pioneer Road Relocation and Reconstruction Project
U.S. Air Force Cooperative Agreement for Perfluorinated Compounds Response Activities Jayne Joy, P.E. February 9, 2017.
Scenic Highway – Public Meeting
Feedback – key themes : Traffic
Transportation Services Department
Upland Landfill Waste Discharge Application 7295 Gold River Highway
Value Engineering Study and Risk Assessment
Washoe County Board of Adjustment
Jemtegaard Trail Project was originally funded by a Safe Routes to School (SRTS) which is a federal grant administered by WSDOT Total funding for design,
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Construction Report March 25, 2010.
Draft Transportation Element September 6, 2017
Canyons Golf Hole 12 Comfort Station Special Exception
Construction Management & Inspection
MPO School Transportation Working Group
Site Plan Requirements
ARIZONA WATER COMPANY East Sedona Water Storage Facility
Competency: Create site plan drawings
Stockton City Council December 6, 2007 Land Use Diagram Changes
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
Delta Water Supply Project
Joint City Council / Planning Commission
PUBLIC HEARING PRESENTATION: RESIDENTS’ CONCERNS
Subdivision Applications
City of Sunrise Wastewater Reuse Program
Horsham South Structure Plan Project
Biltmore C Proposed Water & Sewer Improvement Project
FRLP Proposed Boundary Line Adjustment: Confluence Virginia
GALVESTON COUNTY WCID NO BOND PROGRAM
Cascadia College UW Bothell Parking
City of Spruce Grove Capital Region Partners Presentation 2019
Washoe County Board of Adjustment
WSUP The Club at ArrowCreek Grading
CONSERVATION 20/20 MANAGEMENT AND MANAGEMENT TRUST FUND OVERVIEW
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Dakota County Board of Commissioners Meeting September 24, 2019
Presentation transcript:

RURAL POTABLE WATER INFRASTRUCTURE WATERLINE AND TRUCKFILLS MACKENZIE COUNTY RURAL POTABLE WATER INFRASTRUCTURE WATERLINE AND TRUCKFILLS

FUNDING County has received funding but limitations have been put on annual contributions. Letter has been received increasing funding levels for 2015/2016 from $110,044 to $1,060,593. No information on limitations on funding for future years so County may have to “front end” some costs. Signs required by the agreement have been made and will be installed prior to construction.

ALIGNMENT SELECTION The general alignment is 3 metres east of the west boundary of Range Road 150. Minimize property acquisition and avoids power poles. Require property acquisition at south end and booster station.

ENVIRONMENT Waterline alignment will cross two Class “A” creeks. Need to supply information required under the Code of Practice. Migratory Bird Act and Wetlands may be an issue. Will meet with Alberta Environment and Parks on February 2 to clarify requirements.

WATER MODELING Waterline and truckfills will have limited impacted on water treatment plants. Demand growth projections to be 2% for first 10 years and 0.5% thereafter. Existing waterline on north end will be upsized or looped within 5 to 10 years. Proposed looping contained in the Infrastructure Master Plans.

WATER MODELING

WATER MODELING (cont’d) Large increase in demand during the summer months. 100 cubic metres per day added to account for trickle fill systems (300 population). From 2016 to 2090 the water demand is projected to increase from 960 to 1,530 cubic metres per day. 200 mm pipe (8”) is adequate. One booster station required and location shown on following page is approximate.

DESIGN CONSIDERATIONS Are recommending the use of HDPE pipe for leakage reduction and ease of installation. Need survey and geotechnical in near future to complete design and apply for crossing agreements, Standardizing the design of truckfills to reduce costs and streamline operations. Property acquisition may impact design so should be started soon.

BUFFALO HEAD PRAIRIE Will require land acquisition Can provide service to school.

BUFFALO HEAD PRAIRIE Development Permit and Traffic Impact Assessment.

FORT VERMILION Located in SE ¼ 14-108-13 W5M, close to Fort Vermilion and Highway 88.

FORT VERMILION

TENDERING STRATEGIES 3 separate tenders being considered due to different nature of work. 1. Clearing and Grubbing 2. Waterline 3. Truckfills For the waterline and truckfills can tender by open method or Request for Qualifications/Short Listing/Submissions Each has its own benefits.

SCHEDULE

COSTS ITEM DESCRIPTION COST Site Works and Miscellaneous Items   Site Works and Miscellaneous Items $ 145,000 Schedule A Miscellaneous Site Works $ 127,000 Schedule B Waterline $ 4,152,050 Schedule C Fort Vermilion Truckfill $ 775,000 Schedule D Buffalo Head Prairie Truckfill Subtotal $ 5,974,050 Engineering $ 525,000 Contingency $ 600,000 Total $ 7,099,050

QUESTIONS AND COMMENTS