IT Project Management.

Slides:



Advertisements
Similar presentations
The Business Analyst and the SDLC
Advertisements

UPS2000 UPGRADE Certification Presentation Project Certification Committee.
Get in touch with Microsoft Dynamics Sure Step Saied Alhamwi, PMP Business Application Manager ACWA Holding
BUSINESS DRIVEN TECHNOLOGY
Rapid data migration to SAP ERP Proposal Framework.
Rational Unified Process
Tech Indira IT Solutions Pvt Ltd
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Greg Pierce| Concerto Cloud Services Which Cloud is Right for Microsoft CRM?
Adding New Services making a difference! Lars Ahlgren Sales Lead Dynamics Services Microsoft Dynamics.
CORPORATE PROFILE
Page - 1 Ariba Buyer Upgrade Benefits/Enhancements  Streamlined User Interface  Requisition Function and Company eForms  Increased Performance.
12.
Voice over IP Spring LNA Meeting April 1, What is Voice over IP? n A technology for transporting integrated digital voice, video and data over IP.
SYS364 Evaluating Alternatives. Objectives of the Systems Analysis Phase determine, analyze, organize and document the requirements of a new information.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Software Testing. Introduction Testing is often left to the end of the project which is generally not a good idea. Testing should be conducted throughout.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
Supporting Microsoft Office in an Enterprise Environment Will Brandt Sr Technical Lead Microsoft Corporation OSP303.
Who am I : 14 years experience in IT and ERP Including ERP PM, consultancy and implementations, account manger. Product manger BSc. Industrial engineering.
Satzinger Chp. 2 Part Part 4 of 4 2 Object-Oriented Analysis and Design with the Unified Process Testing Testing is critical discipline Testing activities.
Business Systems Development SDLC and introduction to the Microsoft Solutions Framework Team and Process Models.
Bring Your Business into the 21 st Century : Part 1 WasteExpo 2011 Improving Your Financial Management System.
Get off on the right foot Included with SOTI JumpStart: Creation and deployment of a single package FileSync and Single lockdown configuration, enabling.
IT Requirements Management Balancing Needs and Expectations.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 The Analysis Phase System Requirements Models and Modelling of requirements Stakeholders as a source of requirements.
PLUG IT IN 6 Project Management. 1.Project Management for Information Systems Projects 2.The Project Management Process 3.The Project Management Body.
Selecting the Best Alternative Class 19. SDLC Project Identification & Selection Project Initiation & Planning Analysis *** Logical Design Physical Design.
Management of Change ► The health, safety, security, environmental, technical and other impacts of temporary and permanent changes are formally assessed,
VENDORS, CONSULTANTS AND USERS. WHY CAN’T COMPANIES DEVELOP THEIR OWN ERP PACKAGES? To develop an ERP package is a complex & time consuming activity which.
Project Management Methodology Development Stage.
GOLearn LMS Implementation Process. Initiation Specification Vendor Selection Project Implementation Operations Organizations have started with the GOLearn.
Rapid data migration to SAP ERP and CRM Solution Summary.
Lesson 3: Web Project Management Fundamentals. Objectives Document customer expectations and feedback Determine site project implementation factors Create.
Making the System Operational Implementation & Deployment
1 Object-Oriented Analysis and Design with the Unified Process Figure 13-1 Implementation discipline activities.
BizForceOne by MegaSolutionCenter (MSC), USA BIZFORCEONE OPERATING SYSTEM BEST FIT IMPLEMENTATION.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
Final Review Systems Analysis and Design in a Changing World, 4th Edition 1 Final Review u Chapters 1-6, 8-10, 13, 14, 15 u Multiple choice, short answer,
Cognos BI. What is Cognos? Cognos (Cognos Incorporated) was an Ottawa, Ontario-based company that makes Business Intelligence (BI) and Performance Management.
Tailoring the EPLC A Clinical Center Approach Ryan Kennedy, IT Project Manager Department of Clinical Research Informatics March 28, 2012.
Project Management Testing & Acceptance
October 10-13, 2006 San Diego Convention Center, San Diego California Staging and Cutting Your IP PBX “The Install”
Information Systems Development
Implementing a SharePoint Portal
Types of information systems (IS) projects
C63 – Opportunity Management
Constructing Deploying and Maintaining Enterprise Systems
C64 – Integrated ERP Order and Quotation Management
Project Update and Demo January 18th, 2017
Unified Process(UP) popo.
Free MB5-705 Dumps - Try MB5-705 Demo - Dumps4download
مراحل پیاده سازی راه حل برنامه ریزی منابع سازمان ERP Implementation
education.oracle.com/cloud
Tally training in Chandigarh. Introduction to Tally ERP 9.
Presented By: <Names> <Team Name> <Date>
PowerApps Scoping Workshop
Enterprise Resource Planning
Defining the Project Step 1: Defining the Project Scope
Making the System Operational Implementation & Deployment
CIS460 – NETWORK ANALYSIS AND DESIGN
Enterprise Resource Planning (ERP) System
MANAGING THE DEVELOPMENT AND PURCHASE OF INFORMATION SYSTEMS
Name of Project Manager Date
Chapter 5 IS630.
Steering Committee June 8th, 2016
[Insert Project Name] Work Breakdown Structure (WBS)
Evaluate the integral {image}
Presentation transcript:

IT Project Management

IT PM The importance of project justification (dollars; goals not predictions) the scope of the system and the scope of the project Review and evaluation of project Assumptions and constraints

IT PM Whose system is it? Working in phases Prerequisites Functional requirements and technical requirements

IT PM Training, deployment, and support (acceptance and hand off) Scope creep and feature creep Testing: beta, acceptance, integration, usability, security, performance

IT PM Some types of projects, development, package implementation, system enhancement, consultation, migration, disaster recovery No turning back Tolerances ERPs and CRMs. Look at “Blaming ERP” article (http://www.cfo.com/article.cfm/2987370)