1 Project Management Testing & Acceptance neil@minkley.fr

2 Project life cycle Business case Advisability study Feasibility study ExecutionClosurePlanning Plan implementation Product creation Project supervision Requirements Charter Scope Schedule Budget Product launch Project plan

3 Product creation phases Business case Advisability study Feasibility study ExecutionClosurePlanning Plan implementation Project supervision Requirements Charter Scope Schedule Budget Product launch Project plan RequirementsIntegrationDesign Testing & Acceptance Deployment Content creation Software coding Product creation

4 Testing & Acceptance Business case Advisability study Feasibility study ExecutionClosurePlanning Plan implementation Project supervision Requirements Charter Scope Schedule Budget Product launch Project plan RequirementsIntegrationDesign Testing & Acceptance Deployment Content creation Software coding Product creation

5 Testing & Acceptance: outline RequirementsIntegrationDesign Testing & Acceptance Deployment Content creation Software coding General remarks Test plan – Test cases Internal testing vs External testing Types of test Problem management Involvement of the project manager Product acceptance

6 Killer bugs (1)

7 Killer bugs (2)

8 Killing bugs

9 Testing

10 V model for SW development cycle Requirements System design Unit design Implementation Integration & System testing Acceptance testing Unit testing Acceptance test plan Integration test plan Unit test plan

11 Spiral model for SW dvpt cycle Requirements Risk analysis Prototyping Coding Testing Customer evaluation

12 XP methodology for SW dvlpmnt cycle RequirementsIntegrationDesign Testing & Acceptance Deployment Content creation & Software coding Test-driven development:  systematic unit tests, with full coverage of features developed  as the system grows, so does the number of unit tests which need to be run successfully  feedback from tests drives further development work

13 Test plan – Test cases (1) ExecutionPlanning Quality planning Build test plan & write test cases Perform tests & debugging

14 Test plan – Test cases (2) Integration Content design TestingRequirements Acceptance & delivery SW design Content creation SW coding ExecutionPlanning Quality planning Build test plan & write test cases Perform tests & debugging

15 Internal testing vs external testing RequirementsIntegrationDesign Testing & Acceptance Deployment Content creation Software coding Developer Testing service provider Project owner

16 Types of test RequirementsIntegrationDesign Testing & Acceptance Deployment Content creation Software coding Editorial Content integration User interface Functional Technical Performance Documentation Accessibility Free

17 Editorial tests (1-1) http://www.renault.com/en/innovation/vehicule-electrique/pages/les-clefs-de-la-reussite.aspx

18 Editorial tests (1-2) http://www.renault.com/en/innovation/vehicule-electrique/pages/les-clefs-de-la-reussite.aspx QUIZ How does it work? polluting Running a zero-emission vehicle is: or Using a zero-emission vehicle is: or Driving a zero-emission vehicle is: to allow us to develop or to allow the development of Validate

19 Editorial tests (1-3) http://www.renault.com/en/innovation/vehicule-electrique/pages/les-clefs-de-la-reussite.aspx performance (would be better...) ZERO-EMISSION (would be better...) Noise-free or Silent (would be better...) the planet: Date in US format Date in GB format (would be better) Discover the renault-ze.com website

20 Editorial tests (2-1)

21 Editorial tests (2-2)

22 Editorial tests (3-1)

23 Editorial tests (3-2)

24 Editorial tests (4-1)

25 Editorial tests (4-2)

26 Editorial tests (5-1)

27 Editorial tests (5-2)

28 Content integration tests (1)

29 Content integration tests (2)

30 Content integration tests (3)

31 Content integration tests (4-1)

32 Content integration tests (4-2)

33 Content integration tests (4-3)

34 Content integration tests (5-1)

35 Content integration tests (5-2)

36 Content integration tests (6-1)

37 Content integration tests (6-2)

38 Content integration tests (7-1)

39 Content integration tests (7-2)

40 User interface tests (1)

41 User interface tests (2)

42 User interface tests (3-1)

43 User interface tests (3-2)

44 Functional tests

45 Functional tests - Example

46 Technical tests

47 Performance tests

48 Documentation tests (1-1)

49 Documentation tests (1-2)

50 Documentation tests (2-1)

51 Documentation tests (2-2)

52 Accessibility tests

53 Free tests

54 Questions?

55 Problem management (1)

56 Problem management (2)

57 Problem management (3)

58 Involvement of the PM RequirementsIntegrationDesign Testing & Acceptance Deployment Content creation Software coding Project manager Testers Testing manager

59 Product acceptance RequirementsIntegrationDesign Testing & Acceptance Deployment Content creation Software coding Project manager Project owner

60 Questions?