Welcome to the Libertyville Stormwater Master Plan Open House

Slides:



Advertisements
Similar presentations
Bergen County Utilities Authority Bergen County Utilities Authority Little Ferry, New Jersey Rain Derived Infiltration/Inflow Reduction and Sanitary Sewer.
Advertisements

Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
City of Berea North End Area Sewer Investigation Project- Phase I Commencing Fall 2011.
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Workshop on Clear Water Cross Connections & Inspections 7/23/2012.
Preventing Storm Surcharges in the Sanitary Sewer and Basement Backups What Avon Lake Municipal Utilities is Doing and What Residents Can Do November 16,
1 Milwaukee Metropolitan Sewerage District Legislative Audit Bureau November 2003.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
Volusia County Public Works
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
STORMWATER MANAGEMENT PROGRAM UPDATE July 23, 2014.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
The City of North Bend Sanitary Sewer System
1 Stormwater and Wastewater in Halifax Regional Municipality Presentation to Halifax Watershed Advisory Board John Sheppard, P.Eng. Manager of Environmental.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Board of County Commissioners Meeting September 22, 2009 PROPOSED FERTILIZER ORDINANCE.
1 TOWN OF LOCKPORT FINANCIAL REVIEW Focus on the Sewer Plant and Sewer Collection Service.
FEMA UPDATED FLOODPLAIN MAPS Public Works Department Stormwater Management Division August 5, 2008 FEMA UPDATED FLOODPLAIN MAPS Public Works Department.
Drainage Task Team Volusia County Public Works Judy Grim, P.E. Road and Bridge Director.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
Sewer Relief Project. Basement Flooding has been a major problem for city of Selkirk residents. High intensity summer rain storms can result in extensive.
 Prepared by  Prepared for  City of Palm Coast, Florida  January 27, 2015  Drainage Study Sections 30 & 34 for Development of City Wide Stormwater.
LESSONS FROM LOURDES FLOOD EXPERIENCE. Repeating the Past Major flooding occurred in April 2005 Major flooding occurred in April 2005 Lourdes remained.
The July 28,1997 Fort Collins Flood: Putting the Stormwater System to the Test How Did it Serve to Minimize Societal Impact? Matt Kelsch Hydrometeorologist.
Mason’s Stormwater Utility Program Kathleen Wade-Dorman, P.E. City of Mason.
Agenda  Review project scope and goals  Update project status  Review results of public surveys  Identification of capital projects  Draft capital.
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
Metropolitan Council Environmental Services A Clean Water Agency Proposed Combined Sewer Overflow Changes Environment Committee March 11, 2008 Keith Buttleman.
Public Information Meeting Wastewater Treatment January 26, 2016.
 Prepared by  Prepared for  City of Palm Coast, Florida  August 30, 2011  Drainage Study Sections 31 & 35/37 for Development of City Wide Stormwater.
1% Sales Tax Commission Board Meeting June 3, 2015.
Storm Water Management at MSU Ruth Kline-Robach Michigan State University Institute of Water Research Dept. of CARRS.
Proposed Storm Water Utility Fee July Proposal for future Drainage Improvement: Faith Presbyterian Church Estimated Cost: $35, *Install three.
Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
STORMWATER MASTER PLAN TASK FORCE November 20, 2006.
VILLAGE OF SHOREWOOD PPII REDUCTION PROGRAM. Shorewood’s response to the 2010 flooding has been direct and decisive Immediately start identifying problems.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
Village of Villa Park October 24, 2016 Washington Street Combined Sewer Separation Project.
FY 2017/18 General Budget Workshop
Town of Brighton, Department of Public Works
Sewer System Presentation
Comprehensive Sewer Planning Update Meeting
Boulder Junction Town Road Improvement Project
Separating Inflow Reduction and Infiltration Removal
Boulder Junction Town Road Improvement Project
Drainage Study Sections 30 & 34 for Development of City Wide Stormwater Management Master Plan Prepared for City of Palm Coast, Florida Prepared by March.
Infrastructure Investment Needs
Development Charge Public Meeting October 23, 2017
Public Information Meeting NW 100th Street Reconstruction Project
Town of Melbourne Beach
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Rate Commission Meeting
Assessing Vulnerability & Climate Change Impacts
Meadow Lake Boulevard Street Extension Project
Meadow Lane – Brandon Road Improvements Welcome!
Harbour Island Force Main Replacement
Pre-Proposal Conference March 27, 2019, 1:00 p.m.
Hamilton Township, Mercer County, NJ Hydrologic Evaluation and Water Resources Recommendations For Planning and Implementation Rutgers Cooperative Extension.
Monterey County Project Report for Measure X Expenditures
City of Austin Watershed Protection Department CIP Project design/implementation Thank you for the opportunity to show the committee what the Watershed.
Larimer County: engineering
Presentation transcript:

Welcome to the Libertyville Stormwater Master Plan Open House September 13, 2017 Slide 1 of 21

Meeting Purpose: Gather Detailed Flooding Information from Residents Please Discuss Your Flooding Experience with Village Staff and Engineers Information Knowledge RESULTS Slide 2 of 21

Stormwater Master Plan Details Engineer: Christopher B. Burke Engineering, Ltd Scope: Collect flood Information from residents and Village Hydraulic analysis of existing drainage system Development of flood risk reduction projects Prioritize flood risk reduction projects Master Plan with findings and recommendations Study Timeline: Approximately 15 Months (see next slide) Product: Report with prioritized roadmap for specific flood reduction projects in the Village with cost estimates. Slide 3 of 21

Stormwater Master Plan Timeline TASK TIMELINE Preliminary Investigations and Analysis June 2017 – November 2017 Plan Preparation of Identified Projects November 2017 – April 2018 Presentation to Public May 2018 Presentation to Streets Committee July 2018 Presentation to Village Board August 2018 Final Report & Stormwater Rate Study September 2018 Slide 4 of 21

21st Century Storms vs. 20th Century Infrastructure Old Stormwater Infrastructure Many older areas of Village built 1950s – 1980s Prior to modern stormwater planning and design standards Small storm sewers and little stormwater storage No safe overland flow routes Recent Intense Storm Events August 28, 2017: 3.0 inches in 2 hours July 12, 2017: 7.0 inches in 12 hours July 24, 2011: 3.7 inches in 6 hours Result: Not enough stormwater conveyance and storage during large storm events Slide 5 of 21

Recent Rainfall Events – July 2017 Rainfall: 7.0 inches of rain in 12 hours 130-Year storm event (0.8% chance of occurring every year)* Widespread Local Drainage System Flooding and Des Plaines River Flooding Flooded commercial and residential structures Flooded roadways Flooded yards Stormwater inflow into the sanitary sewer system Surcharge of the sanitary sewer system July 2017 Post Storm Village Flood Survey > 400 flooding reports 97 flood questionnaires completed Similar Severe Flooding throughout Lake County Slide 6 of 21 *as determined by Lake County Stormwater Management Commission

Recent Rainfall Events – July 2017 Intersection of Crane and Drake Ames Street Slide 7 of 21

Recent Rainfall Events – July 2017 Sanitary Sewer Surcharge Loyola Drive Slide 8 of 21

Recent Rainfall Events – July 2017 Village Wastewater Treatment Plant Basement Flooding Slide 9 of 21

Recent Rainfall Events – July 2017 West Ellis Avenue Butler Lake Slide 10 of 21

Recent Rainfall Events – July 2017 Butterfield Road Lake Minear Claridge Drive Slide 11 of 21

Recent Rainfall Events – July 2017 Sandstone Drive Slide 12 of 21

Recent Rainfall Events – August 2017 Rainfall: 3.0 inches of rain in 2 hours Greater than a 25-Year Storm Event (4% chance of occurring every year) Local Drainage System Flooding Flooded roadways Flooded yards Flooded Basements Carter Street Slide 13 of 21

Recent Rainfall Events – August 2017 Ames Street 4th Avenue and Meadow Lane Slide 14 of 21

Looking Forward…. Just like a home from the 1950’s needs major upgrades – so does our stormwater infrastructure A prioritized plan is critical to spend Village resources in the most efficient and cost effective manner as possible Slide 15 of 21

Future - 2018 and Beyond Stormwater Construction Projects - Dependent on Study Outcome Stormwater Conveyance and Storage Improvements Compliance with local, state and federal regulations Green Infrastructure Funding Options Slide 16 of 21

Future - 2018 and Beyond Flood-Proofing of Homes and Businesses* Yard re-grading Foundation sealing Storm sump pump improvements (auxiliary/back-up pump) *More information is available on flood-proofing at the tables in the Open House Slide 17 of 21

Future - 2018 and Beyond Flood-Proofing of Homes and Businesses* Sanitary Sewer backup prevention Existing Condition Proposed Condition *More information is available on flood-proofing at the tables in the Open House Slide 18 of 21

Future - 2018 and Beyond Revisions to Village Policies and Regulations Consideration of Stormwater Utility Fee or Other Funding Mechanism Slide 19 of 21

Stormwater Master Plan Goal Develop Projects and Programs to Reduce the Frequency and Risk of Flooding Slide 20 of 21

Please Remember to Sign in and Complete a Flood Questionnaire End of Presentation Please Remember to Sign in and Complete a Flood Questionnaire Slide 21 of 21