F. Bellini for the DQM core DQM meeting, 04th October 2012

Slides:



Advertisements
Similar presentations
Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT Tasks/Responsibilities/Manpow er issues. 1.
Advertisements

AMORE - AliRoot Detectorv4-18-Rev12 ACORDE EMCal FMD HMPID MCH MTR PHOS PMD SDD SPD SSD T00 TOF TPC TRD V00 ZDC v4-18-Rev13v4-18-Rev14v4-18-Rev15v4-18-Rev16.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
DQM news Technical side. Web tools  Advantages  Can be ran out of P2 with access rights  Centrally maintained -> can’t be altered on machines  Modern.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
Central DQM Shift Tutorial Online/Offline. Overview of the CMS DAQ and useful terminology 2 Detector signals are collected through individual data acquisition.
11 CTP Training A.Jusko, M. Krivda and R.Lietava..
DCS - general Unscheduled power cut Wed. morning ( , human error) –DCS (and HLT) off, due to UPS on bypass –In the middle of DB migration, had.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 CTP offline software status (Offline week) A.Jusko and R.Lietava.
Offline shifter training tutorial L. Betev February 19, 2009.
OFFLINE TRIGGER MONITORING TDAQ Training 5 th November 2010 Ricardo Gonçalo On behalf of the Trigger Offline Monitoring Experts team.
V4-20-Release P. Hristov 08/08/ Changes: v4-20-Rev-38 #85151 Memory leak in T0 DQM agent. From rev #85276 AliGRPPreprocessor.cxx: Port to.
Offline report – 7TeV data taking period (Mar.30 – Apr.6) ALICE SRC April 6, 2010.
DQM status report Y. Foka (GSI) Offline week from pp to PbPb.
Infrastructure for QA and automatic trending F. Bellini, M. Germain ALICE Offline Week, 19 th November 2014.
PWG3 Analysis: status, experience, requests Andrea Dainese on behalf of PWG3 ALICE Offline Week, CERN, Andrea Dainese 1.
1 ITS Quality Assurance (& DQM) P. Cerello, P. Christakoglou, W. Ferrarese, M. Nicassio, M. Siciliano ALICE OFFLINE WEEK – April 2008.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
September 2007CHEP 07 Conference 1 A software framework for Data Quality Monitoring in ATLAS S.Kolos, A.Corso-Radu University of California, Irvine, M.Hauschild.
André Augustinus 9 October 2006 Interlocks update.
1 Checks on SDD Data Piergiorgio Cerello, Francesco Prino, Melinda Siciliano.
Summary of User Requirements for Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Offline Week Alignment and Calibration Workshop February.
M. Gheata ALICE offline week, October Current train wagons GroupAOD producersWork on ESD input Work on AOD input PWG PWG31 (vertexing)2 (+
Summary of Workshop on Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Computing Day February 28 th 2005.
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
CWG9 Data Quality Monitoring, Quality Assurance and Visualization B. von Haller CERN.
CSC Shifter Training Course – Global Running Fred Borcherding Reach from CSCOperations Twiki page or directly:
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
 offline code: changes/updates, open items, readiness  1 st data taking plans and readiness.
ACO & AD0 DCS Status report Mario Iván Martínez. LS1 from DCS point of view Roughly halfway through LS1 now – DCS available through all LS1, as much as.
Barthélémy von Haller CERN PH/AID For the ALICE Collaboration The ALICE data quality monitoring system.
V4-19-Release P. Hristov 11/10/ Not ready (27/09/10) #73618 Problems in the minimum bias PbPb MC production at 2.76 TeV #72642 EMCAL: Modifications.
ECAL Shift Duty: A Beginners Guide By Pourus Mehta.
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
CALIBRATION: PREPARATION FOR RUN2 ALICE Offline Week, 25 June 2014 C. Zampolli.
CWG9 and Event Display B. von Haller CERN.
M4 Operations ● Operational model for M4 ● Shifts and Experts ● Documentation and Checklists ● Control Room(s) ● AOB Murrough Landon 24 July 2007.
P. Kuijer1 System run coordinator meeting
EI Colorado TA Call: State Updates,Telehealth, Bridge Training, Reports & EI Database End of Year Cleanup August 4, 2016.
(Alice COsmic Ray Detector) Status Report
V4-18-Release P. Hristov 21/06/2010.
Make-Up Testing/Undo Student Test Submissions
Central DQM Shift Tutorial Online/Offline
Calibration: preparation for pa
Jacek Otwinowski (Data Preparation Group)
DCS Status and Amanda News
Analysis trains – Status & experience from operation
DPG Activities DPG Session, ALICE Monthly Mini Week
Production status – christmas processing
Shift instructions August 16, 2017 Antoni Aduszkiewicz
Calibrating ALICE.
v4-18-Release: really the last revision!
Offline shifter training tutorial
IEEE NPSS Real Time Conference 2009
Experience between AMORE/Offline and sub-systems
Offline shifter training tutorial
Central DQM Shift Tutorial Online/Offline
Corr framework Computing in High Energy and Nuclear Physics
QA tools – introduction and summary of activities
Inviting Applicants to Interviews/EVENTs
Reviewing Course Outlines for C-ID Designation
SVAC Configuration Verification
Member Responsibilities
Volunteer Notetakers A complete guide on how to to sign-up as a Notetaker with the MU Disability Center.
EFSA’s dedicated support for SMEs
Planning Services Meeting Client Communications
Curricular Practical Training
Presentation transcript:

F. Bellini for the DQM core DQM meeting, 04th October 2012 DQM system status F. Bellini for the DQM core DQM meeting, 04th October 2012

Outline Last DQM meeting 04th September 2012: Minutes: System status https://indico.cern.ch/conferenceDisplay.py?confId=203803 Minutes: https://indico.cern.ch/getFile.py/access?resId=minutes&materialId=minutes&confId=203803 System status Feedback from pA pilot run Detectors software status DQM shifts and training On-call training DQM status 04/09/12

System status Latest news from P2: No major problems with DQM framework System is running smoothly Software updated regularly (thanks Adriana and Barth) Occasional crashes of T00QA, frequent crashes of ZDC01  both under investigation by experts Implementation of thresholds – status: All detectors have thresholds and automatic checks except PMD QAchecker still to be implemented by PMD, TRD*(presentation today) Propagation of quality flags to GUI color box SSD, EMC, SPD need to check and debug propagation of quality flags T0, MTR do not have the color box Shifts and training  see dedicated slide DQM status 04/09/12

Feedback from pA pilot run Run 188359 of the 13/09/2012 Thanks to Mihai! DQM status 04/09/12

Feedback from pA pilot run Pilot pA run on 12-13/09 System run smoothly no new plots were implemented dedicated general GUI layout created for the long pA data taking event size values recorded as reference for the long pA Screenshots taken during pA for each detector have been sent to the DQM responsibles  Available information to already set thresholds and prepare documentation before the long pA What’s next  all detectors have to: Make all the necessary changes to the software before the pA Add a chapter in the documentation with reference for the pA run + screenshot Preparation for pA: DEADLINE 04/12/12 DQM status 04/09/12

Detector software status - overview Implementation status, 03.10.12 ACO EMCAL FMD HMPID MCH MTR PHOS PMD SDD SPD SSD T0 TOF TPC TRD V0 ZDC DAQ HLT Trigger Agents issues *QADataMakerRec *QAChecker (flag) Dup. by trg classes * H Cloning request file Thresholds config file Thresholds (macro) Thresholds QA Savannah open 1 Ok In progress Not done Does not apply Waiting for porting * = duplication required in the past, not used now H = splitting requested for A-A, p-A DQM status 04/09/12

DQM shifts and training EOS report subsystem not selected on the EOS reports  subscribe to the alice-dqm-contact-eos@cern.ch mailing list to receive EOS report Crash logs are now attached to EOS reports Regular cleanups of “former issues” established Blackboard cleanup every Friday by DQM on-call established Training 5 general training sessions / 125 people attending Strict policy for DQM training and test has helped  better trained shifters Next shifters training not planned – there are no more people to be trained that will have shifts before the end of the year We need more on-call people  please volunteer!!! We will have soon an on-call training DQM status 04/09/12

DQM shifts booking and shifts during pA Shift booking Shifts booked till the end of the year IMPORTANT change of policy by RC: shifts cannot be released anymore by user nor SRC: need to find a substitute if cannot attend Shifts during pA Limited duration of pA run (24 days total) RC will open pA shifts for System Coordinators to complete Request for very experienced, very best shifters list of possible shifters for DQM ready the same from the offline side ? Call to sub-systems for recommendations DQM status 04/09/12

first DQM on-call training Doodle will be set to collect name of the participants preferences for the date Expected duration 2h Room at CERN + EVO available Detector DQM experts (and volunteers) are kindly invited to the first DQM on-call training during the last 2 weeks of october DQM status 04/09/12

AOB DQM status 04/09/12

https://twiki.cern.ch/twiki/bin/viewauth/AliceEVE/AliceDQM DQM status 04/09/12

Status of DQM documentation Status on 04/10/2012 ACO DAQ EMCAL FMD HMPID MCH MTR PHOS PMD SDD SPD SSD T0 TOF TPC TRD V0 ZDC VERTEX HLT Trigger AMORE Update TWiki Update blackboard Test for DQM trainees TECH run instructions X Verify event specie Verify data size Provide GUI description Ok Not ok Does not apply In progress X = not monitored DQM status 04/09/12