RIVERFRONT TRAILS CLOSED

Slides:



Advertisements
Similar presentations
Parks and Recreation Commission Meeting April 10, 2006 Thunderbird Conservation Park Update.
Advertisements

ADA Requirements Well-designed sidewalks meet ADA requirements:
Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Environmental improvements in Giffin Street and the wider changes to Deptford town centre Sandra Plummer Project Manager, Lewisham Council Evelyn Assembly,
Concept Plan Presentation October, THE OPPORTUNITY A large portion of the area between Peger Road and Denali School is under utilized public land.
Friday, May 21, 2010 v1.0 Bendigo Campus: Masterplan Summary La Trobe University La Trobe University Masterplan Summary Bendigo Campus.
Example of an Appropriate Development Concept for the Hine Junior High School Site This concept is an example of how the site could be developed for the.
December 2009 Movement & Activity Recommendations: 1.Promote & Increase Stair Usage 2.Promote Bicycle Commuting 3.Promote Walking Great Places to Work.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
1 The weight is over How Downtowns are Joining the Fight Against Obesity.
NEW MERCY CENTER. Dramatic 35 foot tall Bright Silver Building entrance cross. Recognition by custom engraved plaque. This Cross will be up lit at night.
Theatre On The Square Pre-design. Analyzing Character Defining Elements.
DESIGN GUIDELINES. Regulations vs Guidelines Very clear limited rules Allow exception and appeals Staff review User friendly Less Flexible Universal One.
Transport.tamu.edu Options for Access Improvements Near MSC Wednesday, December 7, 2011.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
CHARLESTON GAILLARD CENTER ARTS PRECINCT ARTS PRECINCT … designed to bring the arts into the public realm by creating a civic destination for.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Capital Financial Plan and Physical Design Framework DRAFT Committee on Grounds and Buildings May 2010.
Jamesburg VPS Generating a Shared Vision for the Future JAMESBURG, NJ Public Meeting Visual Preference Survey.
Contact: Beth Morris
Project Location Located off of Highway 79 and A.W. Grimes Blvd. Main entrance from A.W. Grimes Blvd. Location: Existing City of Round Rock’s Rabb Park.
1 Starting a Project – Looking for footpaths or pushed down ROW fences Plan for your pedestrians or they will be walking through your project on the edge.
St. Ambrose University Main Campus Planned Institutional District Application December 15, 2011.
Facilities and Programmes – Peterborough Agricultural Society Office Office Offices and meeting rooms for Peterborough Agricultural Society members.
Centre for Athletics, Recreation and Special Abilities (CARSA) and parkade Welcome Open House meeting - September 8, :00 – 8:00 pm 5:00 and 7:00.
Suisun Valley School K Classroom Addition Project.
Transportation Tuesday TRANSPORTATION TUESDAY Stopping & Parking You should never park or stop your vehicle on busy traffic lanes or in no waiting and.
Land Use Study for the Community of Winchester May 21, 2012.
1 Corridor Cities Transitway Presented to: Amberfield HOA January 15, 2015.
Presents Project Crimson March 1, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
Parking on Block 1129: Challenges and opportunities Prospect Heights Neighborhood Development Council March 8, 2012.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Land Use Study for the Community of Winchester July 9, 2012.
Title Slide. Preliminary Conceptual Development Workshop Integrate sustainable design into new buildings and reduce carbon footprint Create more flexible.
Frank c. havens elementary school CONCEPT DESIGN II Refinement of hybrid October 24, 2007 R. P. Gallagher Associates Structural Engineers.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Maximizing Impact / Minimizing Impact: Balancing Human and Environmental Concerns through Site Access Design Lee-Anne Milburn Department of Landscape Architecture.
City of Auburn Streetscape: A Complete Street Presented by: Ed Armstrong, RLA.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
Grand Canalscape Phase I and II General Update October 30, 2015.
Deerfield Elementary School Deerfield Elementary Overview of Deerfield Renovation October 8, 2015.
Civic Institutions Private development Parks & Squares Transportation & Downtowns Bus stops Main Streets (outdoor displays, streetscapes, cafés) Local.
Return site to its rightful glory with cleaner water and more enjoyable experience Propose appropriate additions and renovations to pool, buildings and.
Design Standards in Saint Paul Proposed Design Standards Zoning Amendments December 16, 2009 Department of Safety & Inspections / Department of Planning.
1 Drayton Valley Community Public Space Designs Downtown/ Civic Public Space.
Donaldsonville Returning to the River November 22, 2005 Presented to: The City Council of Donaldsonville and The Master Plan Committee Prepared By: In.
Urban Design and Livability Bruce Monighan AIA Urban Design Manager, City of Sacramento City of Sacramento Planning Academy March 16, 2016.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Planning Healthy Neighbourhoods Presenter: Stephanie Knox.
Concept Design Community Center Proposed Spaces New Construction63,000 SF – Gym Spaces13,500 SF – Fitness Center 9,000 SF – Walking Track 4,000 SF – Multipurpose.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission EA DA New NE MLK & Multnomah.
PUD Mike Awe for Sanctuary Mission. SUBJECT PROPERTY S S S S S S S M M M M C C C C C C C.
White Pigeon Community Schools
Green Stormwater Infrastructure and Park Improvements
Riverwalk Park – 8/23/17 Preferred Riverwalk Park Concept Plan
The I-465 West Leg Reconstruction Project
2006 Facilities Master Plan Update Cañada College
Marina Vista Streetscape Project
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Penn Medicine Chester County Hospital
Project Total Square Footage: 6.25 Acres
Marine Park Red Bank, New Jersey
Changes to Pace Master Campus Plan 1. Pod A Tear down Randall House, build new Lower School building in its place. Add new parking in front. 2.
Albemarle County Public Schools
Residential Site Plan Considerations
PREPARED BY: JOSHIMA V.M., UNIVERSITY OF NIZWA
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Downtown Streetscape Project Routes 5&20 Corridor Reconfiguration
Fort Walton Beach Landing Master Plan
Presentation transcript:

RIVERFRONT TRAILS CLOSED SEE DETAIL ‘A’ RIVERFRONT TRAILS CLOSED DURING EVENTS EXISTING PLAZA ENTRANCE STAIRS CLOSED DURING EVENTS GLENGARRY AVE. CURRENT SITE CIRCULATION RIVERSIDE DRIVE EAST TRAIL USERS FESTIVAL SUPPORT VEHICLES FESTIVAL PATRONS TRAFFIC FLOWS: DETROIT RIVER WINDSOR RIVER CRUISES DOCKING LOCATION (APPROX.) BOAT PASSENGER LOADING/UNLOADING ZONE AND QUEUING AREA RIVERFRONT TRAILS CLOSED DURING EVENTS EXISTNG PLAZA ENTRANCE TICKET BOOTH Existing Site Circulation Conflicts DETAIL ‘A’ - CURRENT SITE CIRCULATION ADJACENT TO FESTIVAL PLAZA ENTRANCE

PROPOSED SITE LAYOUT AND RE-ROUTING PLAN RE-LOCATE WINDSOR RIVER CRUISES DOCKING LOCATION CLOSER TO OUELETTE AVENUE CLOSE RIVERFRONT TRAILS AND PROVIDE CROSSWALK TO NEW RAMP CLOSE EXISTING PLAZA ENTRANCE WINDSOR RIVER CRUISES DOCKING LOCATION (APPROX.) DETROIT RIVER RIVERFRONT TRAILS CLOSED DURING EVENTS STAIRS CLOSED DURING EVENTS GLENGARRY AVE. RIVERSIDE DRIVE EAST CONSTRUCT NEW RAMP THAT OUTLETS AWAY FROM THE BACK-OF-HOUSE CONSTRUCT NEW PLAZA ENTRANCE AND ENTRY COURT TRAIL USERS FESTIVAL SUPPORT VEHICLES FESTIVAL PATRONS TRAFFIC FLOWS: PROPOSED SITE LAYOUT AND RE-ROUTING PLAN

How big is the space?

How big is the space? 200 YARDS (190m)

RIVERFRONT FESTIVAL PLAZA - PROPOSED SITE AREAS CONCERT SPACE AREA 2: TRANSITION SPACE WITH SEATING AREAS AND GREEN SPACE AREA 1: FLEXIBLE OPEN SPACE WITH ENTRY COURT AND AMENITIES BUIDING BACK OF HOUSE EXISTING STAGE AND FACILITIES BUILDING RIVERFRONT FESTIVAL PLAZA - PROPOSED SITE AREAS

Updated Concept Plan – without Canopy BACK OF HOUSE RIVERFRONT TRAILS (RIVERWALK AND RECREATIONWAY) RIVERSIDE DRIVE EAST GLENGARRY AVE. CONCERT AREA FLEXIBLE OPEN SPACE ROTARY PLAZA AREA (CONCEPTUAL DESIGN BY OTHERS) DETROIT RIVER ENTRY COURT TRANSITION AREA PEDESTRIAN PROMENADE RECREATIONWAY RAMP NEW Updated Concept Plan – without Canopy

Updated Concept Plan – with Canopy BACK OF HOUSE RIVERFRONT TRAILS (RIVERWALK AND RECREATIONWAY) RIVERSIDE DRIVE EAST GLENGARRY AVE. ROTARY PLAZA AREA (CONCEPTUAL DESIGN BY OTHERS) CONCERT AREA FLEXIBLE OPEN SPACE DETROIT RIVER ENTRY COURT TRANSITION AREA PEDESTRIAN PROMENADE RECREATIONWAY RAMP NEW Updated Concept Plan – with Canopy

Updated Concept Plan – Back of House Area DETROIT RIVER RIVERFRONT TRAILS (RIVERWALK AND RECREATIONWAY) RIVERWALK ROTARY PLAZA AREA (CONCEPTUAL DESIGN BY OTHERS) RECREATIONWAY BACK OF HOUSE NEW RECREATIONWAY RAMP RIVERSIDE DRIVE EAST SITE PLAN – BACK OF HOUSE CROSS WALK PAVED BACK-OF-HOUSE AREA RETAINING WALLS ALONG RAMP STAIRS FROM RIVERSIDE DRIVE PEDESTRIAN PROMENADE TO RECREATIONWAY POTENTIAL FOR PEDESTRIAN UNDERPASS CONNECTION TO THE CIVIC ESPLANADE Updated Concept Plan – Back of House Area

(RIVERWALK AND RECREATIONWAY) FLEXIBLE OPEN SPACE PLAZA ACCESS PLAZA ACCESS WATER FEATURE (WATER JETS) RAISED PLANTER BUFFER WITH SEATWALLS RAISED PLANTER BUFFER WITH SEATWALLS RAISED PLANTER BUFFER WITH SEATWALLS STAIRS TO UPPER LEVEL 2-TIER ENTRANCE CANOPY DETROIT RIVER RIVERFRONT TRAILS (RIVERWALK AND RECREATIONWAY) ENTRY COURT BACK OF HOUSE DROP OFF GLENGARRY AVE. RIVERSIDE DRIVE EAST PEDESTRIAN PROMENADE SEATWALLS SEATWALLS AMENITIES BUILDING RAMP CONCERT AREA SLOPING TOWARD THE STAGE RETAINING WALL ROOF TERRACE EXISTING STAGE AND FACILITIES BUILDING RETAINING WALL SHADE STRUCTURES TRANSITION SPACE WITH CANOPY TREES Updated Concept Plan – Festival Plaza

Area 1 - Flexible Open Space Area: Concept & Examples Large, flat open space. Pavement banding (with grass or different pavement colours/materials) Building for washroom, storage and concessions. Flat area for portable toilets required for large events. Entry canopy or structure to welcome into the site. Berms and shade trees along the sides to separate Riverwalk and obscure views into the site. SEATWALLS AND PLANTERS TO SEPARATE PLAZA SPACE FROM THE RIVERWALK PAVEMENT BANDING, DIFFERENT COLOURS/TEXTURES AND TURF INSETS/BANDING SITE ENTRANCE WITH SIGNAGE AND FLEXIBLE GATE OPTIONS Area 1 - Flexible Open Space Area: Concept & Examples

Area 1 - Flexible Open Space Area: Concept & Examples SITE ENTRANCE WITH SIGNAGE AND FLEXIBLE GATE OPTIONS Area 1 - Flexible Open Space Area: Concept & Examples

Area 1 - Flexible Open Space Area: Concept & Examples SITE ENTRANCE WITH SIGNAGE AND FLEXIBLE GATE OPTIONS Area 1 - Flexible Open Space Area: Concept & Examples

Area 1 - Flexible Open Space Area: Concept & Examples SITE ENTRANCE WITH SIGNAGE AND FLEXIBLE GATE OPTIONS Area 1 - Flexible Open Space Area: Concept & Examples

Area 1 - Flexible Open Space Area: Concept & Examples SITE ENTRANCE WITH SIGNAGE AND FLEXIBLE GATE OPTIONS Area 1 - Flexible Open Space Area: Concept & Examples

Area 2 – Transition Space Area: Concept & Examples Canopy trees provide shade. Views through the site are maintained. Pavement areas with potential to incorporate some grass and planting beds. Seatwalls / benches / built-in seating. Provides screening of the site from Riverside Drive. Up-light trees at night. Planters to separate the Riverwalk from the plaza area. BUILT IN SEATING AREAS, GRASS AREAS, LARGE PAVEMENT AREA CANOPY TREES, PLANTER/SEATWALLS TO SEPARATE SPACES RAISED AREA, CANOPY TREES WITH UPLIGHTS, SEATING AREAS Area 2 – Transition Space Area: Concept & Examples

Area 2 – Transition Space Area: Concept & Examples

Area 2 – Transition Space Area: Concept & Examples

Area 2 – Transition Space Area: Concept & Examples

Area 2 – Transition Space Area: Concept & Examples

Area 3 – Concert Space Area: Concept & Examples Gently sloping concrete area (approx. 3% slope) Area to accommodate seating for approx. 1800 people. Sloped concrete provides better views of the stage vs. existing flat concrete area. Curved toward the stage provides better views of the stage. Creates grade change within the site. Grade change blocks views of the stage from the Riverwalk. Potential for canopy or roof structure over the seating area. ROOF STRUCTURE/CANOPY OVER CONCERT SEATING AREA GRADUAL SLOPING CONCRETE WITH FLAT AREA IN FRONT OF THE STAGE Area 3 – Concert Space Area: Concept & Examples

Area 3 – Concert Space Area: Concept & Examples ROOF STRUCTURE/CANOPY OVER CONCERT SEATING AREA Area 3 – Concert Space Area: Concept & Examples

Area 3 – Concert Space Area: Concept & Examples ROOF STRUCTURE/CANOPY OVER CONCERT SEATING AREA Area 3 – Concert Space Area: Concept & Examples