Agenda Item 2: Catch up session 15 May 2017

Slides:



Advertisements
Similar presentations
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
Advertisements

Multi-Stage Bidding.
Government Integrated Financial Management Information System (GIFMIS)
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
1 EFCA - 21th March 2002 Raul Mateus Paula. 2 This presentation underlines: The key objectives of the Relex Reform The division of the responsibilities.
Unified Nuclear Industry Catalogue of Equipment and Materials Used for Designing, Construction and Operation of NPPs NIZHNY NOVGOROD ENGINEERING COMPANY.
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
ZHRC/HTI Financial Management Training
Release & Deployment ITIL Version 3
The Lean Sourcing Process
Frameworks agenda Definition Advantages, features
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Deliverable Readiness Review LexEVS 5.1 December 17, 2009.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
United Nations Procurement Division
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
Contract Training Class I
Let Ascension take your business to new heights Tender Manager Scott Warnock Andrew Smillie.
Mr. Thilak de Silva. BSc. Eng., MSc, CEng, FIE(SL), FIET(UK), CITP(UK), MBCS(UK), MIEEE (USA) M.Sc. in IT - Year 1 Semester II
Report on TTonT By: Jan Rozema. Contents Historical overview Status (at PFAC-02) Terms of Reference How to go onward.
IMPLEMENTATION OF ACTION PLAN FOR SUMMARY CPV REGULATION & IMPLEMENTATION Using of CPV codes became mandatory in Europe from December 16, 2003.
RECOMMENDATIONS ON IMPROVEMENT OF PUBLIC PROCUREMENT SYSTEM Experts: Bazakeeva Jyldyz Jamanchaevna Abdymomunona Saina Ryskeldievna Recommendations were.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Submitting a Responsive Response Packet & Bid Waste Water and Water Treatment Chemicals ITB# CWCH.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
EPPSS 1 Frequently Asked Questions What are the recommended technical specifications for using ePPSS? 1 Relatively modern workstation and recent Operating.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
Contract management 1. Acquiring software from external supplier This could be: a bespoke system - created specially for the customer off-the-shelf -
J-AGE I Status/Closing Report JPI MYBL - GA Meeting Brussels 21th January 2016.
Advisor, IDS Cell1 NEGOTIATIONS G.C. Tallur (Former Secretary, PWD) Advisor, IDS Cell Monday, July 11, 2005.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Façade Management Consulting
Electronic Filing of Differences(EFOD) System and Filing of Differences Task Force (FDTF) Air Navigation Bureau.
CONTRACT ADMINISTRATION
Tender Evaluation and Award Process
Light Rail Transit Project
Preparation of a tender and tender documents
Procurement Management
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Content of Tender Dossier - Instructions to Tenderers - Tenders
Contract Award Procedures
Evaluation Grids Evaluation Grids.
Contract Award Procedures
Second Independent Evaluation of UNAIDS
City of Norfolk Office of the Purchasing Agent
Microsoft 365 powered device offers Execution Guidance
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Mini Competition – End to End Process Workshop
Project Development and Managing your Build Agenda
Outcome TFCS-11// February Washington DC
The Lean Sourcing Process
Guidance notes for Project Manager
Direct award of contract for goods and services
Second Independent Evaluation of UNAIDS
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
Contractual Arrangement
THE EMPLOYER Right, of access to the site.
Transmitted by the IWVTA Informal Group
United Nations Procurement Division
Working Party on General Safety Provisions (GRSG) General information
European Spallation Source ERIC Procurement
Overview of the recommendations on software updates
Working Party on Noise (GRB) General information and WP.29 highlights
Experiences Engaging Managed Care
Presentation transcript:

Agenda Item 2: Catch up session 15 May 2017 CRV common provisions Agenda Item 2: Catch up session 15 May 2017

Overview of the tender package To procure services Not equipment Uses the UN framework to select the best and final offer ICAO procurement code Procedures: fair and transparent process of evaluation E-procurement tool CRV Users (States/Administrations/Organizations) are the customers of the selected provider

Overview of the tender package Service Order Terms and conditions Terms and Conditions are to be used during the contracting and execution stages. In this case the Service Order is signed between the Supplier and the CRV User.  ICAO Terms and Conditions are to be used in the exceptional case where ICAO would procure the services on behalf of a CRV User. In this case the Service Order is signed between the Supplier and ICAO. Terms of Reference Background and objectives of the project Specifies the services to be delivered 6 annexes Determines responsibilities Instructions To Tenderers Gives necessary instructions to the tenderers for the sealed tender process Price schedule, restrictions on services, evaluation criteria, study case, safety schedule

Process Evaluation report officially reviewed and approved by the independent ICAO contracts board on 28/11/16 PCCW Global Ltd. ranked first Invited for further negotiations 15 Dec. 16 (CRV TF/6) Detailed presentation of the PCCW team, technical features and documents: Adjustment process 2 meetings 17 Dec. 16 (Adjustments meeting #1) and 17&18 Jan. 17 (Adjustments meeting #2) Solve issues affecting blue documents Participants: Pioneer States wanting to implement as soon as possible From 19 Jan. Start of individual/grouped States negotiations for some States 8 May 17 Common provisions - Blue documents are finalized and can be used by States From 15 May 17 Review of orange documents Pilot project All States welcome to initiate/continue discussions with PCCW Try to solve: governing law (India) services to Democratic People's Republic of Korea Authentication service based on a PKI

Review at CRV OG/2, acceptance CRV OG/3 PMP, QMA PMP, Service Delivery PMP, QMA Service Order Acceptance Mid Jan 17 Review at CRV OG/2, acceptance CRV OG/3 Not maintained Initial contractors: planning&ICD customized to each site Other contractors: planning&ICD customized to each site PMP, QMA

Common package: where? On the CRV portal December 2016

Common package “Read me first” Purpose: Overview of all documents Know what can be varied locally and what cannot Version management December 2016

Proposed process to contract 1.       State notifies CRV OG Chair(s) and ICAO Regional Office the intention to join – update CRV implementation plan 2. State contact Mr. Benny Cheng (PCCW) who sends the High level survey 3.       State downloads the Common Package from CRV portal 4.       State submits the High level survey to PCCW 5.       PCCW recommends a package (design) and submits a Project Plan 6.       State cross checks with its peers and starts coordination of implementation (CRV OG can facilitate) 7. State and PCCW discuss Price, Schedule and Terms and Conditions: Local optimizations and additional requirements may be required 8.      State and PCCW agree and record any variation from the common provisions in the Order Form State and PCCW sign the Order Form which is governed by: (a) Terms and Conditions between PCCW Global and CRV Authority ; (b) The CRV Terms of Reference (including all annexes); (c) Specific Terms for MPLS VPN Service, Specific Terms for Managed Router Service and Specific Terms for Satellite VSAT Services (the “Specific Terms”); (d) Addendum to the Specific Terms; (e) The price schedule in their latest applicable version; (f) The Project Management Plan in its latest applicable version; and (g) The CRV implementation plan in its latest applicable version. 9. Installation occurs 10.   Testing is carried out 11.   Service Commencement Notice provided from PCCW to the State, includes all drawings and documentation 12.   State notifies CRV OG about the service commencement 13. State carries out service migrations in coordination with peers Note: the engineering package is made applicable through the PMP 26 April - 03May 2017