Rainfall-Runoff modeling

Slides:



Advertisements
Similar presentations
Hydrology Rainfall - Runoff Modeling (I)
Advertisements

Unit Hydrographs Ch-7 (Streamflow Estimation)
Hydrologic Analysis Dr. Bedient CEVE 101 Fall 2013.
Unit Hydrograph Reading: Applied Hydrology Sections , 7.5, 7.7,
HYDROLOGY (670441) Philadelphia University Faculty of Engineering
CHARACTERISTICS OF RUNOFF
Runoff Processes Daene C. McKinney
Introduction to Surface Water Hydrology and Watersheds Lecture 1 Philip B. Bedient Rice University November, 2000.
Unit Hydrograph The Unit Hydrograph Unit Hydrograph Derivation
Forest Hydrology: Lect. 18
Watershed Management Runoff models
Hyetographs & Hydrographs
Unit Hydrograph Reading: Sections , 7.5, 7.7,
Hydrologic Simulation Models
Problem 1- Tabulated below are total rainfall intensities during each hour of a frontal storm over a drainage basin.
Unit Hydrograph Theory
Transforming the Runoff
Chapter Two Net Storm Rainfall. Hydrograph Vocabulary Rising limb, a falling limb, and a recession. The rising limb and falling limb are separated by.
Hydrologic Theory One of the principal objectives in hydrology is to transform rainfall that has fallen over a watershed area into flows to be expected.
Lecture ERS 482/682 (Fall 2002) Rainfall-runoff modeling ERS 482/682 Small Watershed Hydrology.
UH Unit Hydrograph Model Response Functions of Linear Systems Basic operational rules:  Principle of Proportionality: f(cQ ) = c  f(Q)  Principle of.
Hydrograph Modeling Goal: Simulate the shape of a hydrograph given a known or designed water input (rain or snowmelt) time Precipitation time flow Hydrologic.
Hydrology & Water Resources Engineering
ERT 246 Hydrology & Water Resources Engineering
Simulating the Hydrologic Response
HEC-HMS Runoff Computation.
ERT 246 Hydrology & Water Resources Engineering Siti Kamariah Md Sa’at School of Bioprocess Engineering, UniMAP.
CE 424 HYDROLOGY Chapter 6 Hydrograph Analysis Dr. Saleh AlHassoun 1.
Hydrologic Analysis Dr. Phil Bedient Rice University.
Engineering Hydrology Discussion Ch. #6 Hydrographs
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
Synthetic UH Definition: Synthetic Hydrograph is a plot of flow versus time and generated based on a minimal use of streamflow data. Example: A pending.
Basic Hydrology: Rainfall-Runoff – I
CE 374 K – Hydrology Second Quiz Review Daene C. McKinney.
LibHydro.
CHAPTER 6: Hydrographs Engineering Hydrology (ECIV 4323) -1 Instructor: Dr. Yunes Mogheir 2015.
1 Hydrographs-Cont.. 2 Objectives Ability to subtract groundwater (base flow) Ability to synthesize unit hydrographs for different storm durations using.
Rainfall-Runoff modeling Forecasting and predictingForecasting and predicting –Flood peaks –Runoff volumes Due to Large rain and snowmelt events ***especially.
HYDROGRAPH is a graph showing the rate of flow (discharge) versus time past a specific point in a river, or other channel or conduit carrying flow. It.
-1 DR. S & S. S GHANDHY GOVT. ENGINEERING COLLEGE, SURAT. SUB : HYDROLOGY & WATER RESOURCES ENGINEERING ( ) TOPIC : HYETOGRAPH & HYDROGRAPH ANALYSIS.
Hydrology & Water Resources Engineering ( )
Sanitary Engineering Lecture 4
HYDROGRAPH ANALYSIS Topic 4 NATURAL HYDROGRAPH
Precipitation Measurement
HYDROLOGY Lecture 10 Unit Hydrograph
Routing surface runoff to a basin outlet
Modified Rational Method for Texas Watersheds
Water supply Flood prediction and forecasting. Water quality
Hydrologic Analysis (Bedient chapter 2)
S Curves From Mays, 2011, Ground and Surface Water Hydrology.
FLOOD ROUTING Topic 5 River/Stream Routing Muskingum Method.
Rainfall-Runoff Modeling
Hydrologic Simulation Models
Hydrologic Analysis PART 1
Introduction to Urban Hydrology
المنحنى الزمني للتدفق في المجاري الطبيعية Stream Flow Hydrograph
Precipitation Analysis
INTRODUCTION TO HYDROLOGY
Hydrograph Computation
Dr. Phil Bedient Rice University
Overview of Models & Modeling Concepts
Hyetographs & Hydrographs
Hydrology CIVL341.
Hydrographs-Cont..
Floods and Flood Routing
Preciptation.
WRE-1 BY MOHD ABDUL AQUIL CIVIL ENGINEERING.
Hydrology CIVL341 Introduction
Chapter Five Hydrograph
HEC-HMS Runoff Computation Modeling Direct Runoff with HEC-HMS Empirical models Empirical models - traditional UH models - traditional UH models - a.
Presentation transcript:

Rainfall-Runoff modeling Forecasting and predicting Flood peaks Runoff volumes Due to Large rain and snowmelt events ***especially important when we have no prior recorded experience. extreme flood producing rains Major land-use changes Altered climatic regimes Physical and empirical based models

Approach (empirical) Output-hydrographs Important pts. Inputs: hyetographs Produces an identifiable result Important pts. Hyetograph represents only a portion of the total input in the associated response of the hydrograph Hydrograph represents only the identifiable response to the current hyetograph. Does not include baseflow (earlier events) Or portion of the streamflow after the event response. Determination of event-flow volume based on hydrograph separation. Volume of effective water inputs=volume of event flow Based on reasonable assumptions rather than hydrologic processes.

implicit assumption Water that appears as output in the same water that is identified from the hyethograph. In reality-substantial portion of the water appearing is “old water”. Water that has entered the watershed from a previous event

Effective water input Weff=W-”losses”

Design Floods v. Floods Models are used to generate design floods from actual storms. Design of culverts, bridges, flood retention basins, levees, dam spillways, or floodplain management. Forecast flooding from in-progress storms. Calibrate models.

3 models for design flows Rational method Urban areas SCS method Sub-urban and rural areas Unit hydrograph Generate design flows for large watersheds

Rational Method

SCS Method Most widely used method for design purposes.

Unit Hydrograph Most widely used transfer function for systems modeling. Definition: basin outflow resulting from 1”(1 cm) of runoff generated uniformly over the drainage area at a uniform rate.

Unit Hydrograph Theory

Unit Hydrograph “Lingo” Duration Lag Time Time of Concentration Rising Limb Recession Limb (falling limb) Peak Flow Time to Peak (rise time) Separation Base flow

Graphical Representation Duration of excess precipitation. Lag time Time of concentration Base flow

Methods of Developing UHG’s From Streamflow Data Synthetically-ungaged streams Snyder SCS Time-Area (Clark, 1945) “Fitted” Distributions Geomorphologic

Unit Hydrograph The hydrograph that results from 1-inch of excess precipitation (or runoff) spread uniformly in space and time over a watershed for a given duration. The key points : 1-inch of EXCESS precipitation Spread uniformly over space - evenly over the watershed Uniformly in time - the excess rate is constant over the time interval There is a given duration

UHG’s 2 key assumptions for the development. Linearity-Given a UHG, a hydrograph for a runoff depth other than unity can be obtained by multiplying the UHG ordinates by the indicated runoff depth. Therefore, the time base of the hydrograph is the same as the time base of the UHG. Superposition- summation of corresponding hydrograph or UHG ordinates

Derived Unit Hydrograph

Derived Unit Hydrograph

Derived Unit Hydrograph Rules of Thumb : … the storm should be fairly uniform in nature and the excess precipitation should be equally as uniform throughout the basin. This may require the initial conditions throughout the basin to be spatially similar. … Second, the storm should be relatively constant in time, meaning that there should be no breaks or periods of no precipitation. … Finally, the storm should produce at least an inch of excess precipitation (the area under the hydrograph after correcting for baseflow).

Deriving a UHG from a Storm sample watershed = 450 mi2

Separation of Baseflow ... generally accepted that the inflection point on the recession limb of a hydrograph is the result of a change in the controlling physical processes of the excess precipitation flowing to the basin outlet. In this example, baseflow is considered to be a straight line connecting that point at which the hydrograph begins to rise rapidly and the inflection point on the recession side of the hydrograph. the inflection point may be found by plotting the hydrograph in semi- log fashion with flow being plotted on the log scale and noting the time at which the recession side fits a straight line.

Hydrograph & Baseflow

Separate Baseflow

Sample Calculations In the present example (hourly time step), the flows are summed and then multiplied by 3600 seconds to determine the volume of runoff in cubic feet. If desired, this value may then be converted to acre-feet by dividing by 43,560 square feet per acre. The depth of direct runoff in feet is found by dividing the total volume of excess precipitation (now in acre-feet) by the watershed area (450 mi2 converted to 288,000 acres). In this example, the volume of excess precipitation or direct runoff for storm #1 was determined to be 39,692 acre-feet. The depth of direct runoff is found to be 0.1378 feet after dividing by the watershed area of 288,000 acres. Finally, the depth of direct runoff in inches is 0.1378 x 12 = 1.65 inches.

Obtain UHG Ordinates The ordinates of the unit hydrograph are obtained by dividing each flow in the direct runoff hydrograph by the depth of excess precipitation (Weff). In this example, the units of the unit hydrograph would be cfs/inch (of excess precipitation).

Final UHG

Determine Duration of UHG The duration of the derived unit hydrograph is found by examining the precipitation for the event and determining that precipitation which is in excess. This is generally accomplished by plotting the precipitation in hyetograph form and drawing a horizontal line such that the precipitation above this line is equal to the depth of excess precipitation as previously determined. This horizontal line is generally referred to as the F-index and is based on the assumption of a constant or uniform infiltration rate. The uniform infiltration necessary to cause 1.65 inches of excess precipitation was determined to be approximately 0.2 inches per hour.

Estimating Excess Precip. 0.8 0.7 0.6 0.5 Uniform loss rate of Precipitation (inches) 0.2 inches per hour. 0.4 0.3 0.2 0.1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Time (hrs.)

Excess Precipitation

Changing the Duration Very often, it will be necessary to change the duration of the unit hydrograph. If unit hydrographs are to be averaged, then they must be of the same duration. The most common method of altering the duration of a unit hydrograph is by the S-curve method. The S-curve method involves continually lagging a unit hydrograph by its duration and adding the ordinates. For the present example, the 6-hour unit hydrograph is continually lagged by 6 hours and the ordinates are added.

Convolution method Based on principles of both linearity and superposition. Procedure for deriving a storm hydrograph from a multiperiod rainfall event. Changes duration w/o precip. event equal to duration of the UHG.