Presentation is loading. Please wait.

Presentation is loading. Please wait.

S Curves From Mays, 2011, Ground and Surface Water Hydrology.

Similar presentations


Presentation on theme: "S Curves From Mays, 2011, Ground and Surface Water Hydrology."— Presentation transcript:

1 S Curves From Mays, 2011, Ground and Surface Water Hydrology

2 Example The 1- hr unit hydrograph for a watershed is given below. Determine the 2 hr unit hydrograph. Time ( hr) 1 2 3 4 5 6 Unit hydrograph ( cfs) 10 100 200 150 50

3 S Curve to Develop 2 hr unit hydrograph

4 Problem 8.5.3 Suppose the 4-hr unit hydrograph for a watershed is
Determine the 2-hr unit hydrograph A design storm has 1 cm/hr in first 2 hr and 0.5 cm/hr in the second 2 hr. Baseflow = 10 m3/s. Calculate the total runoff hydrograph Time (hr) 2 4 6 8 10 12 14 Unit hydrograph (m3/s/10 mm) 15 45 65 50 25

5 Problem

6 Problem

7 Determining the  index and Excess Rainfall Hyetograph


Download ppt "S Curves From Mays, 2011, Ground and Surface Water Hydrology."