IFR mechanics status of the detector & tooling development

Slides:



Advertisements
Similar presentations
Structure and function Tools Field of application What to do with a moulder ? Examples of forms Technical overview How does that work ? Security by feed.
Advertisements

Alphabet of Lines.
337: Materials & Manufacturing Processes
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
EMCAL: project update - Italy - LNF - Frascati Fixture production Module assembly (proto) WLS fibers processing Lead procurement (proto) CT- Catania APD.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
What is a machining Process? Machining is the manufacturing process by which parts can be produced to the desired dimensions and surface finish from a.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
WIRE SAW TO CUT PIPES. SPECIALIZED WIRE SAW TO CUT PIPES Technical details: electric or hydraulic driven easy to fix to the pipe under.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
NA62 SILICON PIXELS DETECTOR VIBRATIONS MEASUREMENT 1Vittore Carassiti - INFN FE NA62 GTK Meeting , CERN.
8-10 Scaling Three-Dimensional Figures Course 3 Warm Up Warm Up Problem of the Day Problem of the Day Lesson Presentation Lesson Presentation.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
APPLICATIONS OF TECHNOLOGY
V0L Hardware Status ALICE WEEK CERN, MARCH 2003 Ana Delia Becerril IFUNAM, México.
Status of cosmic-ray test of the SciFi prototype and SciFi software in G4MICE M. Yoshida (Osaka Univ.)
Slotting machine (SLOTTER)
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Tuesday, October 20 Objective: Students will learn the fundamentals of oblique sketches. Bellringer: In the term 3-D, what are the three dimensions of.
GIGATRACKER SUPPORTING PLATE COOLING SYSTEM SIMULATION 1Vittore Carassiti - INFN FECERN, 11/12/2007.
P. Checchia ECFA-DESY Prague1 Status report of the tile-Si Lccal * project Prototype description Production Beam test results Future plans *
Update on CHANTI F.Ambrosino, M.B. Brunetti*, F. Canfora*, T. Capussela**, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università.
By: Mr. Lua. Alphabet of Lines When viewing mechanical drawings you will find several lines. This is simply reference system used to remember different.
Reinforcing BOL modules F. Grancagnolo, R. Perrino INFN Lecce ATLAS-RPC Meeting / Roma, Nov. 5 th, 2002.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
STUDY ISLAND MCAS REVIEW TECHNOLOGY & ENGINEERING Assignment #5 Materials, Tools, Machines Engineering Design.
Status of Prototype Preparation (I) Wander Baldini On behalf of the Ferrara SuperB group SuperB Workshop, LNF Dic. 2-nd 2009.
By Dr. Saied Darwish (Prof. Industrial Engineering Department, KSU)
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
SuperB – IFR status of the detector & tooling development 1V. Carassiti - INFN FEINP PAN 07-09/09/2012.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Prototype Assemblying, SiPM Characterization and QC
Machine Tool & Machining
8-10 Scaling Three-Dimensional Figures Warm Up Problem of the Day
By Martinus Bagus Wicaksono
T2K Upgrade First look at TPC constraints (WAGASCI)
ANADOLU ÜNİVERSİTESİ Industrial Engineerng Department
UNIT-I SLOTTING MACHINES
Subject :- Manufacturing Processes-1
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
IFR Status Summary W. Baldini on behalf of the IFR Group
Status of Prototype Preparation and SiPM Characterization
SILICON PIXELS DETECTOR
FIGURE 24.1 Typical parts and shapes that can be produced with the machining processes described in this chapter.
The interaction region for FIRST (status report)
The Beam Test at Fermilab:
COMPUTER AIDED ENGINEERING DRAWING
Tassielli G.F. INFN Lecce & Università del Salento
IFR detector mechanics
First of all we will remind some numbers:
Tail-Catcher/Muon Tracker Prototype
Vocational school Jean De Berry
Machining Processes.
IENG 475: Computer-Controlled Manufacturing Systems Process Planning
ЧПУ Delta Electronics G-коды. Примеры
Warm Up Problem of the Day Lesson Presentation Lesson Quizzes.
TEC Services Status 30/12/2018 Nick Lumb.
Status report of the tile-Si Lccal* project
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Limited Streamer Tube Project Summary
Outline Format I. Heading 1 (Main topic)
The Machine Milling Machines are used for many things, from making gear teeth to cutting slots and planing (flattening) surfaces This one is called a Horizontal.
STUDY ISLAND MCAS REVIEW TECHNOLOGY & ENGINEERING
Drawer Construction Machine methods J.Byrne 2016.
8-10 Scaling Three-Dimensional Figures Warm Up Problem of the Day
Vinyl Machine.
Presentation transcript:

IFR mechanics status of the detector & tooling development LNF 21/03/2012 V. Carassiti - INFN FE

Outline Detector Tooling Status of the design Status of the development LNF 21/03/2012 V. Carassiti - INFN FE

Status of the detector design The development of the design is in a good advanced status : Scintillators, fibers and PM are inside a dark box The fibers coming from the scintillators are connected to the PM ; the PM wires are collected in a bunch coming out from the box The longitudinal scintillators are 50 mm in width and 10 mm thick ; the transversal ones are 100 mm in width and 10 mm thick LNF 21/03/2012 V. Carassiti - INFN FE

Detector sketches (I) SCINTILLATORS FIBERS PM WIRES LNF 21/03/2012 V. Carassiti - INFN FE

Detector sketches (II) LNF 21/03/2012 V. Carassiti - INFN FE

Detector sketches (III) LNF 21/03/2012 V. Carassiti - INFN FE

The first prototype LNF 21/03/2012 V. Carassiti - INFN FE

Status of the tooling development The tooling development regards (up to now): Machine making the grooves housing the fibers Machine dispensing the resin fixing the fibers Other needs A production plan is needed (space, timing, labor, …..) LNF 21/03/2012 V. Carassiti - INFN FE

Machine making the grooves The machine consist of : A plane supporting the scintillator An head equipped with a cutting disk making the linear groove Two heads equipped with a cylindrical milling cutter making the junctions for the exit in place of the fibers The machining time is approximately 8 min each scintillator corresponding to 3,5 weeks/1000 scinti (40 h/week) LNF 21/03/2012 V. Carassiti - INFN FE

Groove machine sketches (I) CUTTING DISK CYLINDRICAL MILLING CUTTER LNF 21/03/2012 V. Carassiti - INFN FE

Machine dispensing the resin The machine consist of : A plane supporting the scintillator An head equipped with a resin dispenser The dispensing time has to be checked LNF 21/03/2012 V. Carassiti - INFN FE

machine machine sketches (I) RESIN DISPENSER LNF 21/03/2012 V. Carassiti - INFN FE

Conlusions The detector design is in a good advanced status of development The tooling needed for the construction of the detector in under way : the next months the details will be developed LNF 21/03/2012 V. Carassiti - INFN FE