HPS EC Report John Jaros HPS Collaboration Meeting at JLAB May 5, 2017.

Slides:



Advertisements
Similar presentations
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
Advertisements

Standards and Certification Training Module B – Process B5AStandards & Certification Project Management.
FACET: A National User Facility Carsten Hast SLAC National Accelerator Laboratory.
Calice Meeting DESY 13/2/07David Ward Guidelines for CALICE presentations Recently approved by the Steering Committee.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
HPS Budget and Schedule Marco Oriunno, June 4-6, 2013 HPS Collaboration Meeting, JLAB.
1 Getting Ready for the Climb HPS Project Overview HPS Collaboration Meeting at SLAC John Jaros September 10, 2012 John Jaros HPS Collaboration Meeting.
HPS EC Report John Jaros HPS Collaboration Meeting at JLAB June 18, 2014.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
Rolling Resistance Standards Work at ISO (TC31 WG6) Prepared for GRB Review 19 Sep 2011 Angela Wolynski WG6 Convenor Informal document GRB (54th.
Geant4 Publication Procedures Geant4 Collaboration Meeting 23 September 2013 Dennis Wright (SLAC)
Validate Scope What we have: Requirement Traceability Matrix Verified Deliverables What we do: Inspection What we get: Accepted Deliverables.
Upgrade Result Approval: CMS and Tracker Frank and Andrea 21/5/14Pixel phase 1 MB1.
HPS Budget and Schedule Marco Oriunno, June 18, 2014.
HPS Experiment Overview John Jaros HPS Collaboration Meeting at JLAB October 26, 2015.
LSC at LLO LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 1 Report from Executive Committee Meeting Alan Wiseman G Z.
HPS Collaboration Business John Jaros HPS Collaboration Meeting at JLAB June 6, 2013.
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
EMIS Chapter 5 Much of Chap 5 and 6 varies depending on the contract type. Two major types are important so we’ll digress to Contracting 101 for.
SLAC contribution to the Muon Accelerator Program (MAP) SLAC2MAP.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting July 18, 2011.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
Stage 3. Consultation and Review Standard Setting Training Course 2016.
Bow Basin Watershed Management Plan Revised Terms of Reference
Post Constitution and Bylaws (CBL) January 21, 2017
Director’s Progress Review Closeout Meeting
Review, Revise and Amend from Procedures for State Board Policy 74
TEXAS NODAL (ERCOT REVISIONS)
ILD phone meeting September 5, 2017 K. Kawagoe (PSB chair)
Accelerator Operations Department Readiness (Part 2)
Governance and Collaboration By-Laws
NCWG Terms of Reference NCWG April 2016, IHB, Monaco
SPECIAL COMMITTEE RECOMMENDATIONS STATUS CTS Fall Planning Meeting San Marcos September 6, 2013 Don Drumtra Good morning.
Implementation Strategy July 2002
Proposed Bay TMDL Schedule
Meeting Procedure.
Overview of CLAS12 Calibration
Defending the Dissertation
The DBD: Outline and Scope
Standards Development: An Overview
HPS Experiment Overview
SKADS Controller’s Meeting Timeline Annual Financial Report
HPS Update John Jaros HPS Collaboration Meeting at JLAB May 22, 2018.
IEEE P Motions at the July Plenary EC Meeting
PRESENTER: Gary Elling GVPTA Secretary
Paul Boase, Chair, Transport Canada Jill Collins, CSA Val Todd, CCMTA
HPS EC Report John Jaros
HPS EC Report John Jaros
Director’s Progress Review Closeout Meeting
INSPIRE Development of Implementing Rules
Recoil e- detection in Radiative tridents
Colorado state university-pueblo policy and administration (PA)
Publications and Presentations Committee May 2018
S. Stepanyan (JLAB) HPS collaboration meeting May 3 – 5, 2017 JLAB
PRESENTER: Gary Elling GVPTA Secretary
IEEE aj Task Group September 2017 Agenda
802.11F Meeting Report April 2002 Month 1998 doc.: IEEE /xxx
Process for Publication of ISSAIs and INTOSAI GOVs
LNG Workshop Bilbao, March 13th 2009 GLE.
Living Donor Committee
Review of the Community Council Scheme of Establishment
802.11F Meeting Report March 2002 Month 1998 doc.: IEEE /xxx
HPS EC Report John Jaros
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Publications and Presentations Committee May 2017
Publications and Presentations Committee May 2019
Standardization Changes
Presentation transcript:

HPS EC Report John Jaros HPS Collaboration Meeting at JLAB May 5, 2017

HPS Executive Committee Members: Nathan Baltzell, Raphael Dupre, Matt Graham, Tim Nelson, Maurik Holtrop, John Jaros, Stepan Stepanyan Website on confluence with Meeting Summaries https://confluence.slac.stanford.edu/display/hpsg/HPS+Executive+Committee Recent Business * Establish MC and Tracking Czars * Reviewed procedures for unblinding data, presenting new results, writing analysis notes, and publishing physics results * Prepared Update to Management * Guidelines for approving upgrades * New Members * Elections for EC and HPS membership

Czars Established New Positions * Tracking Czar—to oversee, coordinate, and help with tracking improvements, tracking performance studies, and alignment. * MC Czar—to oversee, coordinate, and help improve the accuracy of the detector simulation, better match the MC to the data, validate physics generators, and mix in real beam backgrounds. Congratulations! * Tracking Czar Omar Moreno, and deputy (serf?) Norman Graf * MC Czar Takashi Maruyama, and deputy Bradley Yale

Before we publish… Some guidelines are useful as HPS moves toward publishing its first physics results. New territory for us. No map! * Rules for Unblinding * Analysis notes * Procedures for Presenting First Results * Procedures for Preparing physics publications This meeting gives us an opportunity to discuss these procedures and whether/how to formalize them. * HPS customs? * Modify the bylaws?

Unblinding We agreed to these steps at the last Collaboration Meeting: Before unblinding the data for a particular physics analysis: 1. An analysis note describing the analysis in detail must be available 2. The MC must reasonably describe the data 3. The analysis group grants approval to unblind (In practice, the analysis group charged a committee to review the analysis note, ask questions as needed of the author, and advise the group on readiness to unblind.) After a few fits and starts, this seemed to work ok. Should this be HPS custom?

Analysis Notes How detailed should an analysis note be? What is it’s function? Such a note is called for in our Bylaws, but as a prerequisite for writing up an analysis in a paper, not for unblinding the data. Same note for both purposes? Discussion: Define an Analysis Note EC will propose a list of guidelines. Omar should incorporate them in his revised Bump Hunt analysis note, and let it serve as an example for the future.

Going Public Procedures for Making New Physics Results Public Our Bylaws say the following: 1. circulate key slides before the talk 2. show only official “preliminary” or “final” results 3. discuss new results before the talk 4. get approvals from EC, PPC, and 2/3rds of Collaboration We’ve modified these slightly: 1. circulate and discuss the results for the collaboration a week before the presentation. 2. EC, PPC, and Analysis Group must all approve 3. Then, Collaboration votes. Approved if 2/3rds of members agree. 4. PPC still reviews proposed presentation

Publishing Procedures for Writing and Approving a Physics Publication Our bylaws provide good guidance. 1. Analysis note goes to EC, PPC, and Collaboration 2. EC and PPC grant approval to prepare a manuscript 3. PPC forms a writing committee to prepare manuscript 4. Paper goes to Collaboration for 2 weeks for comments. 5. “Review Team” is formed, takes comments into account, and produces a second draft. 6. Collaboration reviews draft 2 and comments. 7. Final changes are made to manuscript 8. EC and PPC approves manuscript 9. Collaboration approves with a 2/3rd vote Procedures may get modified as we have real experience producing our first published physics result. Let’s test drive this before we amend it.

Update to Management JLAB management had requested an update on HPS’s progress in publishing its first results. (We had hoped to publish by last September). We wrote a document explaining the problems we had encountered, progress we were making, and plans for dealing with a shortfall of vertex reach. “Progress toward Publishing HPS Results” was sent to JLAB management on January 30, 2017 along with a copy of Omar’s talk (10% bump hunt) from the “April” APS meeting. It was also sent to SLAC and DOE HEP. You can find it here: https://confluence.slac.stanford.edu/display/hpsg/HPS+Proposals

Approving HPS Upgrades The EC has decided on these procedures for approving HPS Upgrades Presentation to the Collaboration Physics justification Simulated performance improvements Proposed Design Cost, schedule, manpower and resource availability Commissioning Plan (time and effort required) Technical Review ½ day review with local experts to judge technical feasibility, cost, and schedule once actual design is completed Monthly Progress Updates for EC EC “Readiness” Review before installation

New Members! Welcome Luca Marsicano, INFN Genova Luca is a graduate student at Genova advised by Marco Battaglieri. Although he is writing his thesis on BDX, he'll devote half time to HPS Ecal calibration and will help with many phases of HPS operations during future HPS runs. Welcome Mike Testa, UCSC Mike is a graduate student advised by Robert Johnson at UCSC. He’ll work on the SVT upgrade, SVT DAQ, and tracking, and write his thesis on HPS. Welcome Miriam Diamond, SLAC Miriam is a new post doc, who will begin working at SLAC after this meeting. She’s done hidden sector searches at ATLAS, and will help with the SVT upgrade, tracking, and analysis.

Elections Election of new HPS Collaboration members Vote “yes” or “no” for each. * Domenico D’Urso, INFN Sassari Interests in tracking code and running the experiment * Robert Johnson, UCSC Interests in silicon detectors, SVT upgrade, LDMX and supervising Mike Testa Election to the HPS Executive Committee Vote for two. Shouldn’t be too hard. * Raphael Dupre, Orsay * Tim Nelson, SLAC

Future EC Business Push HPS Physics Publications for 2015 and 2016 results. Review and Approve the HPS Upgrades asap; prepare for ERR on June 12 at JLAB. Submit Run Plan Request by July 1 Start preparing for 2018 run Plan new HPS Theses with new Graduate Students What else?

More Issues for the EC?