ELECTRICAL SAFETY TASK GROUP

Slides:



Advertisements
Similar presentations
Subcontractor Electrical Safety & NFPA 70E
Advertisements

LIMITED APPROACH BOUNDARY
DOE Electrical Assessment of C-AD: Inaccurate Electrical Panel Schedules Missing Knockouts Panel Modifications Picture of the Week Collider-Accelerator.
Murray State University
 ELECTRICAL SAFETY Gerald P. Robinson Jr., P.E. – Hatch Mott MacDonald.
Arc Flash & Data Centers
Arc Flash: Electrical Safety in the Workplace CCIA Safety Committee SAFETY ROUNDTABLE April 10, 2012 sm 1.
De-energization and Lockout
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
When working on or near electricity or electrical equipment you must be trained in & use Electrical Safety Related Work Practices NFPA.
Lockout/Tagout for Injection Molding
ARC FLASH ANALYSIS.
Construction Training
Slide 1 UNCLASSIFIED Breaker Operation Arc Flash Breakout Group EFCOG Electrical Safety Workshop – July 18, 2014.
ELECTRICAL SAFETY SUB GROUP COMPENSATORY ARC FLASH CONTROLS Greg Christensen July 16, 2014.
Arc Flash Energy & Protection Presented by EWB Engineering (Electrical Engineers)
Electrical Safety Training
THE INTERNATIONAL SOCIETY OF FIRE SERVICE INSTRUCTORS Electronic INSTRUCT-O-GRAM Program Lockout / Tagout Policy.
Utilizing Only Qualified Persons for Electrical Work can Reduce Risk Presented by: Dennis K. Neitzel, CPE Director Emeritus AVO Training Institute, Inc.
“Standard for Electrical Safety in the Workplace”
What is Arc Flash? Arc flash is a short circuit through air that flashes over from one exposed live conductor to another conductor or to ground. Arc flash.
Controlling Hazardous Energy
Control of Hazardous Energy – Lockout/Tagout 29 CFR
Protective Devices Maintenance as it Applies to the Arc/Flash Hazard
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE.
An Introduction to Mersen Electrical Services Putting electrical safety to work.
High Voltage Electrical Safety
Incident Energy Study Christian Brothers University MAESC CONFERENCE Jermichael Beaver, Bruce Luong, David Temple, and John Ventura.
NFPA Changes 2015.
© Evaluating Electrical Risk Factors Module 3.
Power System Engineering Want to own your Customer’s Power System?
Electricity Compressed Air Steam Hydraulic Pressure Gas Lines etc.
© Methods of Control Module 4. © Recognize Control Evaluate.
Take 5 for Safety E. Lessard May 12, Arc Flash Event at INL Involving Situational Awareness Barrier  On April 15, 2015, Idaho National Lab workers.
MNM Fatal Electrical Electrical October 12, 2006 (Minnesota) October 12, 2006 (Minnesota) Taconite Operation Taconite Operation Maintenance Coordinator.
First Draft Language (B) Service Equipment. In addition to the requirements in (A), service equipment shall contain the following information: (1)
Presented by John Lewandowski and Mike Larabel Inspection, Testing, and Maintenance of Kitchen Hood Systems Michigan Fire Inspectors Society Winter Educational.
Training of Airport Visual Aids Maintenance Personnel “Airport Operator” - Are you Meeting the Requirements? IESALC Denver 2015 Presented by Seward Ford.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
ELECTRICAL SAFETY GA Ag Ed Curriculum Office To accompany the Georgia Agriculture Curriculum Lesson AG-AMI VGP.
1 FOM 4.2 Remediating Arc Flash Hazards in New and Existing Data Centers Joseph Furmanski Director, Data Center Facilities and Technologies.
NCTCOG Electrical Advisory Board
Steve Griffith February 28th, 2017
What NFPA 70E Electrical Safety Really Means to your Customers
What is Arc Flash? Electrical arc flash and arc blasts release dangerous levels of heat energy, fire , molten materials, vaporized solids that can be inhaled,
NFPA 70E: Standard for Electrical Safety in the Workplace
Managing Safe Work Permits
“Success in Safety”.
Energy Control (Lockout/Tagout)
LCLS-II CRYOPLANT CONTROLS HARDWARE FINAL DESIGN REVIEW
ELECTRICAL SAFETY TASK GROUP
Control of Hazardous Energy Lockout/Tagout 29 CFR
OVERVIEW Control Of Hazardous Energy.
EFCOG 2016 Working Group #5 Update 07/19/2016.
Subpart K Electrical Long recognized as a serious hazard.
Quality Risk Management
Electrical Safety Equipment
Personal Protective Equipment
OSHA’s Final Rule: Electric Power Generation, Transmission, and Distribution Electrical Protective Equipment Presented to: RESAP Area Administrators Presented.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Reduced Safety/Reliability: Arc Flash Hazard Example
Presented to: IEEE-IAS (Atlanta) Presented by: Michael D. Seal, P.E.
Overcurrent Protection— Fuses and Circuit Breakers
Murray State University
Developing a Comprehensive Electrical Program
Control of Hazardous Energy
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Hazard Identification & HAZOP (HAZard and OPerability studies)
Arc Flash Fundamentals & Compliance
Presentation transcript:

ELECTRICAL SAFETY TASK GROUP Task Group 5 Risk Assessment and Arc Flash Controls for Normal Operations Greg Christensen, INL Gregory.christensen@inl.gov July 18, 2016

PARTICIPANTS Scot Winningham Earl Myott Jennifer Martin Russ Moder Jerald Kinz Todd Kujawa Craig Shaw Kevin Gurbisz Tommy Martinez Jaqueline Mirabal-Martinez Matthew Giardina Jackie McAlhaney Earl Myott Russ Moder Mike Minard Glen Mirocha Frank Perrotta Glenn Anderson Greg Christensen Robert Fry Ray Joggerst Rick Ramirez Dan Evans Omar Al Atassi

BACKGROUND NFPA 70E 2015 Employers are responsible for assessing the risk from the arc hazard for employees that interact with electric equipment

BACKGROUND NFPA 70E recognizes arc flash hazards may exist even when equipment is in an enclosed condition. This includes operators whose only interaction is with the equipment in an enclosed condition. There are situations where opening or closing a switch or breaker has been a contributing factor to an arc flash event.

GOAL Develop a best practice for: Risk Assessment and recommendations for verifying proper installation, minimum maintenance requirements and no evidence of impending failure for assigning arc flash controls

BEST PRACTICE Elements of Best Practice Risk Assessment Verifying Proper Installation Minimum inspection, testing and maintenance requirements for overcurrent protection devices (OCPDs) Verifying no evidence of Impending failure Additional considerations i.e. engineering controls, configuration, environment, venting, egress, documentation, etc.

Documentation required! ASSESSING RISK Documentation required! Installed properly Maintained properly Doors closed and secured Covers in place and secured No evidence of impending failure Annex F Risk Assessment has 38 sample questions to ascertain compliance with first two criteria.

THRESHOLDS FOR ARC FLASH ≤ 125 KVA at < 240 V and < 1.2 cal/cm2 @480 Volts is exempted (assumes calculated in accordance with approved method in accordance with NFPA 70E or IEEE 1584)

VERIFY INSTALLATION Electrical Inspection Program – Task Based Risk Assessment 1) Permit - Obtain an Electrical Work Authorization Document or Electrical Installation Permit 2) Engineered - Engineering Design Document that has taken into consideration the environment and application of the equipment to be installed. 3) Inspection or Examination – Inspection performed by a qualified NEC inspector or an AHJ delegated to perform such inspections. 4) Approved or Accepted– The inspection is approved and documented by NEC Inspector or AHJ, & work authorization document or permit is closed. 5) Required Labeling – Visual indication that the installation was performed in accordance with the required by applicable standards. i.e. Stickered

VERIFY INSTALLATION Electrical Inspection Program – Task Based Risk Assessment Qualified Person’s Initial Observation of Equipment Installation – Real Time Risk Assessment 1) Covers in place (screws, fasteners are engaged) 2) All penetrations are closed or sealed (is venting in the front?) 3) Conduits, Fittings are secured and complete 4) Handle or Switching mechanism is intact (appears functional) 5) Equipment meets field labeling requirements (reviewed in last 5 yrs) 6) No Suspect/Counterfeit/Recalls 7) Field Modifications have been evaluated

VERIFY INSTALLATION Resources: NFPA 70 Definitions: Approved, Qualified Person, Authority Having Jurisdiction NFPA 70 Article 90.7 & 110.3 Examination, Identification, Installation and Use of Equipment NFPA 70 Article 110.2 Approval of Conductors and Equipment NFPA 70 Article 110.16 Arc Flash Hazard Warning Labels NFPA 70 Article 110.24 (A) Maximum Available Fault Current Labeling & (B) Modifications NFPA 70E 2015 Article 130.5 (D) Arc Flash Risk Assessment Equipment Labeling

OVERCURRENT PROTECTION Need to Maintain overcurrent protection

Power Breakers 3 – 5 year Cycle Cleaning and inspection Lubrication Thermal imaging Torqueing connections Mechanical exercise

Power Breakers Performance Testing Needed Secondary or primary current injection Instantaneous test to validate trip mechanism and arc flash calculation Ground fault, short term and long term delay to validate equipment protection

Molded Case Circuit Breakers 3 – 5 Year Cycle Cleaning and inspection, torque connections, Thermal Imaging - Energized, with loading greater than 40% of rating with covers removed Torque connections to ensure no hot spots Mechanical exercise

Molded Case Circuit Breakers Performance tests should be performed: Instantaneous testing performed to validate trip time of breaker and arc analysis results. Short Term and Long Term Delay should be performed to validate equipment protection

Fuses 3 - 5 Year Cycle Cleaning and inspection Check fuse clips for tightness

Tools Torqueing calibrated tools Document and record values Torque per manufacturer’s requirements Remote racking equipment

Resources and references NFPA 70E Standard for Electrical Safety in the Workplace 2015 Chapter 2 NFPA 70B Recommended Practice for Electrical Equipment Maintenance IEEE Recommended Practice for the Selection, Field Testing and Life Expectancy of Molded Case Circuit Breakers for Industrial Applications NEMA AB 4 Guidelines for Inspection and Preventative Maintenance of Molded Case Circuit Breakers Used in Commercial and Industrial Applications

IMPENDING FAILURE QUESTION: You can’t see inside or the back of the breaker

PRACTICAL CONCERNS 25 cal/cm2 Incident Energy Properly installed Properly maintained Cover on and secure no evidence of impending failure Risk = high consequence/low probability Consensus of the group some level of PPE is still recommended for this risk. = Serious injury if event occurs.

RISK High Probability Low Probability High Consequence Severity Low Consequence Frequency Upper left quadrant – Beware - here is the problem, the brain is telling you the likelihood (probability) is low so one may take no action to protect from an arc flash (the employee thinks properly installed, properly maintained … hence no PPE required) However if an arc flash does happen the results will be the same as in the upper right quadrant of this table.

PPE for OPERATIONS If bounding conditions are NOT met then arc rated clothing and PPE must meet the available incident energy level >40 cal/cm2 remote racking or other engineered control to remove the employee from the hazard zone should be employed Consider Hierarchy of Controls

PPE for OPERATIONS If risk assessment indicates the conditions for proper installation, maintenance and no evidence of impending failure are met: Underlayer must be non-melting Minimum for outer layer is non melting Arc rated clothing recommended > 1.2 cal/cm2

CONCLUSION Risk assessment to evaluate bounding conditions for proper installation, maintenance and no evidence of impending failure must consider many discreet factors to be effective and provide a high level of safety for breaker operations. See also EFCOG Best Practice #192 “Guide to Incorporating Risk Assessment into ISM for Electrical Safety”

POSSIBLE FUTURE GOALS Each site should evaluate implementation of this process Survey workers regarding their questions or concerns Identify lessons learned for implementation Study accident trends associated with breaker operations

QUESTIONS?