LCLS-II ES&H Requirements: Subcontractors

Slides:



Advertisements
Similar presentations
(Project Name) Site Safety Orientation. Family of Companies.
Advertisements

Cleveland Construction Safety Initiative Introductions Purpose of a 3SP Overview of Sections of a 3SP Pat McMillen – Gilbane Building Company Dave.
Job Loss Analysis Overview
© Business Review - Arabian Peninsula January 24, 2010 / Slide 1 ABB Contractors Business Partners John Hartnett May, 2010.
Contractor Safety Management
Participant Challenge Pilot Program Participant Stage One Assess, Learn and Develop.
Michael Scharfenstein FAC June 17, ES&H Status of Construction and Technical System Installations Michael Scharfenstein.
Richard Hislop FAC April 20-21, 2006 CONSTRUCTION SAFETY Richard Hislop LCLS Construction Safety Coordinator.
SLAC ES&H Overview Craig Ferguson March Operating Model ES&H Mission Critical Issues Challenges Path forward Topics October 2008.
Mike Scharfenstein CF Breakout - 12 November 2008 SLAC National Accelerator Laboratory 1 ES&H Status of Construction and Technical.
Safety and Health Programs
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Safety W. R. Casey NSLS-II ESH Manager CFAC 5/8/08.
Permit to Work Procedure Document Number: KOC.SA.004
M. Scharfenstein - ES&H Coordinator 8 June 2009
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
BUILD WITH US. ™ Contractors
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Process Safety Management
Safety and Health Program Section B of the Forest Activities Code.
Basics of OHSAS Occupational Health & Safety Management System
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
Safety Management. | Ongoing, structured Safety Committee Meetings Ongoing, scheduled Safety Inspections & Trending Relevant.
Injury and Illness Protection Program (IIPP) Instructor: Jerry Earley, CIH.
Health and Safety Policy
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Safety in Construction Contracts Presented By: Ramy besaiso Instructor : Eng: Eyad Haddad Chapter 10.
Standards for Technical Educators Occupational Safety & Health.
Chapter 12 – Fire/Life Safety Rick C. Erickson February 13, 2013 Hot Work Permits.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
NCSLI 2007 Training Records from an Auditors Viewpoint Shawn Mason Boston Scientific.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
IIPP An Overview of the Injury and Illness Prevention Program.
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.

SCG-SH-0200 Southern Company Generation Clearance Procedure Awareness Training for Contractors and Nonlisted Personnel.
Environmental, Safety, and Health
Managing Safe Work Permits
Installation Procurement Package
Focus on What's Important
ISO/IEC
Health and Safety Policy
Who is Responsible for Overhead Crane and Hoist Operations
U.S.D.A. FOREST SERVICE REGION 6
PTW – Permit To Work. What is PTW? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific time.
Temporary Works Co-ordination
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
OHS Staff Introduction Training
Roadmap to COR.
Pre-Qualification Process
Construction Safety Council Breaking New Ground February 7, 2001
Injury and Illness Prevention Program (IIPP)
Prevention through planning, control and monitoring Harold Chinogurei
Conventional & Experimental Facilities Dept.
Safety & Health Programs
Safety & Health Programs
CONVENTIONAL FACILITIES STATUS
M. Scharfenstein - ES&H Coordinator 14 May 2009
Emergency Action Plans
What Is VQIP? FDA required to establish a program to provide for the expedited review of food imported by voluntary participants. Eligibility is limited.
Ian Evans SSRL Safety Office
Integrated Safety and Environmental Management
Michael Scharfenstein Project ES&H Coordinator
CONVENTIONAL FACILITIES
Safety & Health Programs
Whose Job Is It? Responsibility for Laboratory Safety and Security
Installation Status & Operational Readiness Process
Richard Hislop Construction Safety Coordinator
ENVIRONMENTAL, HEALTH & SAFETY POLICY
Radiopharmaceutical Production
Presentation transcript:

LCLS-II ES&H Requirements: Subcontractors Jim Healy LCLS-II Project ES&H Representative

ES&H Information for Prospective Subcontractors $ → Comes primarily from DOE (DOE want to be assured money is well spent) Stanford owns contract with DOE (Stanford assure DOE we know what we are doing) SLAC manages contract for Stanford (SLAC assure Stanford we are doing it correctly) Subcontractor works efficiently and safely Flow down requirement to Subcontractors. Maintain vigilance with respect to ESH. + Subcontractor = Partnership LCLS-II Subcontractor expectations

ES&H Information for Prospective Subcontractors What you need to know! All work must be assessed for: ESH impacts (Safety) Regulations (OSHA, CAL-OSHA, 851) DOE Orders, Cal-OSHA, SLAC ES&H manual are fully applied. ES&H Manual web site: http://www-group.slac.stanford.edu/esh/eshmanual/ ES&H Manual, Ch 42 Subcontractor Construction Safety web sit http://www-group.slac.stanford.edu/esh/hazardous_activities/subcon_construction/policies.htm LCLS-II Subcontractor expectations

ES&H Information for Prospective Subcontractors Applies to Prime (GC) and Subtiers Project Staff Superintendent and/or foreman – demonstrated leader, trained & experienced, committed to quality & safety Safety rep – well versed in construction safety, demonstrated leader Code of Safe Practices; construction All work you perform is addressed; elevated work, demolition, etc. OSHA Recordable Rates (TRC / DART) Should be at or below corresponding BLS rates Moderately above = explain causes/trends, and specific steps taken to correct Workers’ Comp Experience Mod Rate (EMR) Goal is to be below 1.0 Injury and Illness Prevention Program (IIPP) Addresses authorities, responsibilities, compliance with safe and healthy work practices for your company. LCLS-II Subcontractor expectations

ES&H Information for Prospective Subcontractors Site Specific Safety Plan (SSSP) Detail of project scope – Identifies: Required training for workers Competent persons Specific plans and permits that will be needed, e.g., emergency plan, demolition plan, traffic plan, electrical work plan, hot work permit, etc. Collaborative process with SLAC Project Manager, Field Construction Manager (FCM), and safety staff (FSR) Must be completed before Notice to Proceed granted by Procurement. LCLS-II Subcontractor expectations

ES&H Information for Prospective Subcontractors All work must be planned, authorized, and released before it may be performed. Work is planned through careful consideration of scope and worker qualification, and hazards ID’d with controls an opportunity for critical thinking applied to what, when and where associated with the work to be done Work is authorized by the superintendent/foreman Ensures workers are properly trained and qualified, and that they understand the specific hazards and controls of their assigned work Ensures plans and permits are approved and available Job Safety Analysis (JSAs) documents authorized work WPC - This process is detailed, thorough, AND when done correctly adds value opportunity for critical thinking LCLS-II Subcontractor expectations

ES&H Information for Prospective Subcontractors Work is released each day at a coordination (tailgate) meeting with review and signature JSA: Job Safety Analysis Construction Tailgate Meeting: Tasks, hazards, controls, new equipment, hold points, what to do if conditions change, etc. discussed & documented with final FCM sign-off Construction Tailgate / Release Form: Sub-tier subcontractor designated representative General/Prime subcontractor designated representative Signed by every worker, superintendent/foreman LCLS-II Subcontractor expectations

Field Safety Overview Coordination: SLAC is a operational laboratory. Several subcontractors will be working in close proximity. No impact to SLAC operations. Impacts to other projects shall be minimized; communication & coordination Coordination with SLAC FCM for SLAC Facilities and other organization support and conflict issue resolution is required. Training: SLAC Construction safety orientation training required Badging: All employees must be badged through SLAC Security to work Certifications: Equipment Operators must be certified/licensed Equipment: Equipment must be in good operating condition; inspected daily, documented LCLS-II Subcontractor expectations

Field Safety Overview Safety:  A Priority The Goal is Zero Accidents every day; subcontractors are held responsible and accountable. Work Planning:  Flow down to GC. Written work plans and permits are required for high hazard work, i.e., Demolition, Excavation, Hoisting and rigging, Elevated work, Energy Isolation. SLAC is the Authority Having Jurisdiction (AHJ). Quality:  Organization, Management Plan. Quality Assurance plans are required and shall be enforced. Subcontractors are held responsible and accountable. LCLS-II Subcontractor expectations

NEXT… What shall be developed next: BID PACKAGE Include all ESH requirements in the Bid Package. Include all Security requirement: access, badge... SSSP (Site Specific Safety Plan ) To cover specific risks such as: Fluids handling, Pressure Tests, X-Ray. ORGANIZATION Ensure that ESH is fully developed in Org. Chart. ESH rep. to be identified wherever required. LCLS-II Subcontractor expectations

Sample logistics and traffic plan LCLS-II Subcontractor expectations