Part Approval / Compliance Data Submission via Jotform.com

Slides:



Advertisements
Similar presentations
Smart Connect – Supplier Portal Training Module 3 – Creation of Advance Shipment Notification.
Advertisements

Smart Connect – Supplier Portal Training Module 2 – Creation of Service Confirmation.
How To Submit Loans to Flanagan State Bank a/k/a “you are going to love this system”a.
Smart Connect – Supplier Portal Training Module 1 – System Overview.
Certification & Engineering Bureau CB notification Inquiries & Issues Nicolas DesMarais Certification Officer Agent d’Homologation TCB Workshop – February.
EDMR Electronic data submittal system Jeffrey A. Ewick, Section Chief Data and Information Services Section Electronic Discharge Monitoring Report.
Welcome Document Imaging System Training Dial in number: (559) Participant Access Code: #
Lead Management Tool Partner User Guide March 15, 2013
1 Instruction Manual for the Arabtec mySupplier System | version 1.0.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Delphi E&S Instructions for Submitting PPAP for Component Parts to the PPAP Dropbox on the Websitewww.delphisuppliers.com Revised.
Registration Solutions for your Event Management.
Suppliers without a Contract Purchase Order for Services.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
PMIS Introduction to Request New Catalog Item Training Presentation US Department of Health and Human Services.
SDA Formulas Online Webinar Please use the mute button or press #6 on your phones to mute the teleconference line If you have questions or technical problems.
SDA Formulas Online webinar Tomika Moore Senior Chemist, Nonbeverage Products Laboratory September 13, 2012.
ACCESSING AND UTILIZING THE PROVIDER PORTAL MEDICAL AUTHORIZATION UNIT 1.
Shipments Training Presentation for Raytheon Supply Chain Platform (RSCP) April 2016.
Production Part Approval Process
Engineering Change Request (ECR) Process Change Request (PCR)
Compatible with the latest browsers; Chrome, Safari, Firefox, Opera and Internet Explorer 9 and above.
How Can NRCS Clients Use the Conservation Client Gateway
Make-to-Stock Scenario Overview
2 Introduction to GHSP Supplier Delivery Expectations
Supplier Portal Self-Registration
Intracompany Stock Transfer Scenario Overview
Intercompany Project Time and Expenses Scenario Overview
Schools Leavers System
<NPI/Engineering Change/Phase Out>
Make-to-Stock Scenario Overview
Quality Assurance (Unplanned Inspections) Scenario Overview
Materials Engineering Product Data Management (ePDM)
Intracompany Stock Transfer Scenario Overview
Employee Self Service (ESS) Version 2.20.
Texas Instruments Supplier Portal- Web Invoice Overview
Part Approval / Compliance Data Submission via Jotform.com
ShipNow Putting control of shipments in the senders hands
ISO 9001 Awareness Training.
Suppliers without a Contract
CDRL E003 CFAT REPORT TEMPLATE
Manufactured Buildings
Freight Invoice Inquiry
Supplier Request for Engineering Approval
SQA01 Guidance Material: FAI Review
Click Training Agreements Module
Order-to-Cash (Project-Based Services) Scenario Overview
Order-to-Cash (Specified Products) Scenario Overview
To the ETS – PNG Continuation: Online Training Course
Distributor Want aka. Dis-WAnt
Intracompany Stock Transfer Scenario Overview
Employee Self Service (ESS) Version
Order-to-Cash (Specified Products) Scenario Overview
Order-to-Cash (Project-Based Services) Scenario Overview
Production Part Approval Process
AS 9100 Awareness Training.
Smart Connect – Supplier Portal Training
Smart Connect – Supplier Portal Training
Smart Connect – Supplier Portal Training
Vendor Management: New Vendor Request Processing
i2B LIMITED – i2B ERP Integration – 2019 Q1
SUPPLIER ELECTRONIC PCR TRAINING
Registration Step by step guide for suppliers
Using AIM (for Registered Students):
EDT Web Portal User Guide
Supplier EDI On-boarding Overview
Presentation transcript:

Part Approval / Compliance Data Submission via Jotform.com APPROVED

Director – Supplier Quality abccox@nmhg.com To ensure Quality is “built in” to HYG lift trucks, it is important for suppliers to confirm supplied parts comply to published standards and requirements. Since the implementation of our Supplier Quality Manual is 2001 it has been expected that all suppliers utilize a comprehensive Part Approval procedure to facilitate proof of compliance, when applicable new releases or changes occur. This enables HYG to process parts more effectively and efficiently and avoid delays and costs due to non-conformances identified upon receipt. To further facilitate the communication and confirmation of compliance, HYG has launched a simple web portal to receive the applicable data prior to receipt of the parts. HYG will use this data to confirm parts are fully compliant to the drawing including any critical to quality or Key characteristics. Suppliers are expected to take the appropriate steps to ensure internal processes execute and deliver the applicable Part Approval data prior to shipment of parts. Routing the parts through HYG Quality Assurance to be validated, due to the absence of data from the supplier, is considered a non-standard process and will likely result in notification of non-conformance. Therefore, it is extremely important to ensure your company has the necessary processes and procedures in place to ensure issuance of Part Approval to HYG prior to parts shipping. Although the portal is already available for use, HYG will begin officially using this portal for delivery of all Part Approval data August 1, 2013. The following slides will explain when , how and what to submit to HYG for future shipments. Please communicate these expectations to the appropriate staff A.S.A.P. and feel free to contact me if you have any questions. Director – Supplier Quality abccox@nmhg.com

(Per Section 4 of the HYG Supplier Quality Manual) When do I submit? (Per Section 4 of the HYG Supplier Quality Manual)

What do I submit? (Per Section 4 of the HYG Supplier Quality Manual) Unless you are informed otherwise, by HYG, a minimum of a level 2 Part Approval is required prior to the receipt of parts at any of our global manufacturing sites.

How do I Submit? A simple to use web portal has been set up at the link below to facilitate the delivery of compliance data prior to shipment of parts from your facility. https://form.jotformeu.com/22596898747377 https://form.jotformeu.com/22596898747377 NOTE: JOTFORM and Internet Explorer v11 are not compatible. Internet Explorer Versions 9 or 10 are required for use. Or try this instruction to allow v11 to work.

* = required field 1 part # per submission Allows responsible HYG quality person to be notified a submission was made. After completing required fields and uploading files click SUBMIT. System will allow multiple files to be uploaded one at a time but is limited in what file types it accepts (use .XLS…NO .XLSX)

Parts out of specification require direct communication with HYG Quality

Delivery Confirmation / Notification KEEP THIS E-MAIL! This link is your only access back to the record you submitted. After submission, e-mail notification is sent to Supplier Representative and Person identified in Send Notification to.

Disposition / Notification Options for Record of HYG Approval: This E-mail Access record via link and use PRINT FORM button. Request NYG quality rep. to send a PDF of the record. Signed Part Approval no longer sent by HYG. HYG Quality Representative will review the data submitted and update the record with a disposition. Supplier will get an e-mail advising the record has been changed once disposition is given.

In Summary Ensure all new parts fit, form and functional characteristics are compliant to the HYG drawing and Product Specification Requirement Document (PRD) if applicable. Have a system in place to ensure Initial Sample Inspection Reports (ISIR’s) and Part Approval Packages are submitted in advance of shipping parts to HYG. These documents will be referenced when receiving the parts into stock. Contact your HYG Quality representative if any part non-conformances are identified before shipping parts to HYG.

The requirements defined in this document are in alignment with the HYG Supplier Quality Manual released in 2001. The only change is the method of data delivery to HYG. Our goal is to make the submission of Part Approval data as simple as possible and to ensure the delivery of fully compliant parts to HYG Manufacturing. We appreciate your cooperation and your commitment to Quality. Chris Cox Director- Global Supplier Quality abccox@nmhg.com