Fundamentals and Implementation

Slides:



Advertisements
Similar presentations
Wireless Controllers. Building block for remote control & alarming Functions Local control Measurement SMS alarming Remote control via SMS Data transmission.
Advertisements

SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
VSE Corporation Proprietary Information
Dr. HABEEB HATTAB HABEEB Dr. HABEEB HATTAB HABEEB Office: BN-Block, Level-3, Room Ext. No.: 7292 UNITEN.
12-Port IP Power Manager IPM  Product Overview  Product Features  Applications  Comparison Presentation Outline 2 / 15.
An Introduction to SCADA Fundamentals and Implementation Supervisory Control And Data Acquisition.
SCADA SYSTEM CLASSIFICATION
 A system consisting of a number of remote terminal units (or RTUs) collecting field data connected back to a master station via a communications system.
Secure Systems Research Group - FAU 1 SCADA Software Architecture Meha Garg Dept. of Computer Science and Engineering Florida Atlantic University Boca.
Distributed Control Systems Emad Ali Chemical Engineering Department King SAUD University.
Introduction to Automation Chapter 4 Introduction to Automation Dr. Osama Al-Habahbah The University of Jordan Mechatronics Engineering Department.
An Introduction to SCADA Fundamentals and Implementation
SCADA and Telemetry Presented By:.
G650 Generator Protection & Control System
REMOTE SITE MANAGEMENT SOLUTION. AGENDA 2  About KoçSistem  Current Situation in Base Stations  Remote Site Management System: Sitelink  Sitelink.
SCADA FOR WATER DISTRIBUTION IC DEPT. GECGn SEC28.
REAL-TIME SOFTWARE SYSTEMS DEVELOPMENT Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
1 Monitor System Reliability alarm on demand, sag/surge, and etc. Perform Advanced Power Quality Analysis provide real-time trending. Centralized.
 AUTOMATION  PLC  SCADA  INSTRUMENTATION  DRIVES & MOTORS.
WELCOME TO SEMINAR ON SCADA WELCOME TO SEMINAR ON SCADA Presented by: ANIL KUMAR RAUT Adm No:33IE/2k.
Unit 5 CONTROL CENTERS AND POWER SYSTEM SECURITY.
1 Weblite Product Introduction. 2 Control Equipment via the Internet 8 Universal Inputs 8 Universal Outputs software selectable as analog or digital signals.
Topics of presentation
REAL-TIME SOFTWARE SYSTEMS DEVELOPMENT Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Employment of scada system in water purification and transmission system.
SEMINAR ON P.L.C. SUBMITTED BY HRIDAY MUKHERJEE AMIT DEBNATH SOMNATH SHIL
An overview of I&C Systems in APR 1400 Parvaiz Ahmed Khand December 28, 2007.
PART1 Data collection methodology and NM paradigms 1.
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
Lesson 1 PLC BASICS. PLC Definition  Programmable Logic Controllers are industrial computers that control machine and other applications.  PLC have.
Artificial Intelligence In Power System Author Doshi Pratik H.Darakh Bharat P.
OPERATES SCADA OPERATION SYSTEM Explain the operational SCADA
SCADA SCADA TRAINING AJAY K BASU
Chapter 4 Introduction to Automation
Automation Technologies SCADA SENSORS HMI
Chapter 19: Network Management
Maintain, Manage And Monitor Outdoor Systems Remotely
Lesson 3 SCADA.
What is ASEMR /ASKUE/ and the Need for Its Implementation
SHORT CIRCUIT MONITORING BY USING PLC & SCADA
SCADA for Remote Industrial Plant
PRESENTATION ON AUTOMATION,PLC AND SCADA
The University of Jordan Mechatronics Engineering Department
DT80 range Modbus capability
Chapter 4 Introduction to Automation
PLC: Programmable Logical Controller
Fundamentals and Implementation
How SCADA Systems Work?.
The Programmable Logic Controller
An Introduction to SCADA Fundamentals and Implementation
NAT , Device Discovery Chapter 9 , chapter 10.
Introduction to Cloud Computing
CORPORATE PROFILE JUNE 2016
Programmable Logic Controllers (PLCs) An Overview.
SCADA Communication and Architecture Principles
Water & Irrigation Control systems
PLC / SCADA / HMI Controllers: Name : Muhammad Zunair Comsats University Date: 28-October-2018.
Your Solution for: Energy Smart Management Real Time Power Monitoring Fuel Theft Prevention Technical presentation.
INFRASTRUCTURE SOLUTIONS
Substation Automation System
Instrumentation and control
Training Module Introduction to the TB9100/P25 CG/P25 TAG Customer Service Software (CSS) Describes Release 3.95 for Trunked TB9100 and P25 TAG Release.
Automation Committee Workshop Presentation 2
Chapter 2: Operating-System Structures
REMOTE POWER MONITORING OF MARINE SITES
ACOE347 – Data Acquisition and Automation Systems
Plc & scada applications
Chapter 2: Operating-System Structures
Process Dynamics and Control:
Power monitoring software
Presentation transcript:

Fundamentals and Implementation The University of Jordan Mechatronics Engineering Department Supervisory Control And Data Acquisition (SCADA) Fundamentals and Implementation Dr. Osama Al-Habahbeh

SCADA Control Examples Electric power generation, transmission and distribution: Electric utilities detect current flow and line voltage, to monitor the operation of circuit breakers, and to take sections of the power grid online or offline. Manufacturing: manage parts inventories for just-in-time manufacturing, regulate industrial automation and robots, and monitor process and quality control. Buildings, facilities and environments: Facility managers use SCADA to control HVAC, refrigeration units, lighting and entry systems. Traffic signals: regulates traffic lights, controls traffic flow and detects out-of-order signals. Water and sewage: State and municipal water utilities use SCADA to monitor and regulate water flow, reservoir levels, pipe pressure and other factors. Mass transit: regulate electricity to subways, trams and trolley buses; to automate traffic signals for rail systems; to track and locate trains and buses; and to control railroad crossing gates.

What is scada ? SCADA stands for “supervisory control and data acquisition ”. It generally refers to a control system: a computer system monitoring and controlling a process Supervisory control means monitoring & controlling the parameters of equipment

Types of Processes SCADA controlling process can be Industrial process Infrastructure process Facility process industrial process Infrastructure Process facility

MULTI POINT SCADA The multipoint SCADA system is one in which several remote stations are controlled & supervised from one central control Centre RTU (01) RTU (03) Control Centre RTU (04) RTU (02)

Sub Systems of SCADA System: A HMI human machine interface Remote Terminal Units (RTUs) Programmable Logic Controller (PLCs) Communication infrastructure

COMPONENT DESCRIPTION A Human Machine Interface or HMI is the apparatus which presents process data to a human operator, and through this, the human operator monitors and controls the process. Remote Terminal Units (RTUs) connecting to sensors in the process, converting sensor signals to digital data and sending digital data to the supervisory system

COMPONENT DESCRIPTION Programmable Logic Controllers (PLCs) used as field devices because they are more economical, versatile, flexible, and configurable than special-purpose RTUs. Communication infrastructure connecting the supervisory system to the Remote Terminal Units.

COMPLETE SCADA PROCESS .

A HUMAN MACHINE INTERFACE…. EXAMPLE

RTU Hardware Feature CPU & volatile memory. Secure power supply Communication capability Real time clock and watchdog timer

Features of SCADA : Real Time & Historical Trend : If your batch fails or plant trips, you can simply go to historical trend data & do the analysis. You can have better look on the parameters through the trend.

Features of SCADA : Alarms : Alarms have a very critical role in automation. Generally we have alarm states for each inputs/outputs Security : You can allocate certain facilities or features to the operator, process people, engineering dept. & maintenance dept.

Practical uses of SCADA: SCADA is used as a control mechanism for chemical plants, electricity generation, electric power transmission, electricity distribution, district heating. Used for process control.

Advantages : Cheaper Continuous Operation Reliable Improves maintenance, operation, customer service Few operators control large no. of individual assets Provide rapid response to emergencies

Disadvantages: Lack of trained persons Initial capital investment

SCADA Layout TRANSPORT SYSTEM Remote Telemetry Unit (RTU) SCADA MASTER UNITS HUMAN COMPUTER INTERFACE POWER DISTRIBUTION SYSTEM WATER PROCESS PLANT PETROCHEMICAL PLANT SCADA Layout

Alarms from remote equipment TELECOM SCADA SYSTEM 16 Digital i/o 2 Analogue inputs 2 control outputs 1 RS232 port SITE monitoring Time Sync Pager Notification 10 RouteT LAN Remote Telemetry Units (RTU) Sites 1-8 MASTER Controller Rs232 monitoring Dial-up remote Access Alarms from remote equipment

SCADA system functions: 1. Data acquisition 2. Networked data communication 3. Data presentation 4. Control

A SCADA system performs four functions: These functions are performed by four kinds of SCADA components: Sensors (either digital or analogue) and control relays that directly interface with the managed system. Remote telemetry units (RTUs). These are small computerized units deployed in the field at specific sites and locations. RTUs serve as local collection points for gathering reports from sensors and delivering commands to control relays.

A SCADA system performs four functions: 3. SCADA master units. These are larger computer consoles that serve as the central processor for the SCADA system. Master units provide a human interface to the system and automatically regulate the managed system in response to sensor inputs. 4. The communications network that connects the SCADA master unit to the RTUs in the field.

SCADA Data Acquisition SCADA system needs to monitor hundreds or thousands of sensors. Sensors measure: Inputs and outputs e.g. water flowing into a reservoir (input), valve pressure as water is released from the reservoir (output). Discrete inputs (or digital input) e.g. whether equipment is on or off, or tripwire alarms, like a power failure at a critical facility.

SCADA Data Acquisition 3. Analogue inputs: where exact measurement is important e.g. to detect continuous changes in a voltage or current input, to track fluid levels in tanks, voltage levels in batteries, temperature and other factors that can be measured in a continuous range of input. For most analogue factors, there is a normal range defined by a bottom and top level e.g. temperature in a server room between 15 and 25 degrees Centigrade. If the temperature goes outside this range, it will trigger a threshold alarm. In more advanced systems, there are four threshold alarms for analogue sensors, defining Major Under, Minor Under, Minor Over and Major Over alarms.

SCADA Data Communication A communications network is required to monitor multiple systems from a central location. TREND: put SCADA data on Ethernet and IP over Synchronous Optical Networking (SONET). SECURITY: Keep data on closed LAN/WANs without exposing sensitive data to the open Internet.

SCADA Data Communication Encode data in protocol format (use open, standard protocols and protocol mediation) Sensors and control relays can’t generate or interpret protocol communication - a remote telemetry unit (RTU) is needed to provide an interface between the sensors and the SCADA network. RTU encodes sensor inputs into protocol format and forwards them to the SCADA master; RTU receives control commands in protocol format from the master and transmits electrical signals to the appropriate control relays.

SCADA Data Presentation SCADA systems report to human operators over a master station, HMI (Human-Machine Interface) or HCI (Human-Computer Interface). SCADA master station has several different functions: Continuously monitors all sensors and alerts the operator when there is an “alarm” Presents a comprehensive view of the entire managed system, Presents more detail in response to user requests Performs data processing on information gathered from sensors Maintains report logs and summarizes historical trends.

Selection of RTU’s RTUs need to: Communicate with all on-site equipment Survive an industrial environment. Rugged construction and ability to withstand extremes of temperature and humidity (it needs to be the most reliable element in your facility). Have sufficient capacity to support the equipment at a site (though should support expected growth over a reasonable period of time). Have a secure, redundant power supply for 24/7 working, support battery power and, ideally, two power inputs.

Selection of RTU’s Have redundant communication ports e.g. secondary serial port or internal modem to keep the RTU online even if the LAN fails (multiple communication ports easily support a LAN migration strategy) Have nonvolatile memory (NVRAM) for storing software and/or firmware. New firmware downloadable over LAN to keep RTU capabilities up to date without excessive site visits

Selection of RTU’s Control local systems by themselves (Intelligent control) according to programmed responses to sensor inputs Have a real-time clock to accurately date/time stamp reports Have a watchdog timer to ensure that the RTU restarts after a power failure

Selection of SCADA Master A SCADA master should display information in the most useful ways to human operators and intelligently regulate managed systems. It should : Have flexible, programmable soft controls to respond to sensor inputs Allow programming for soft alarms (reports of complex events that track combinations of sensor inputs and date/time statements). Automatically page or email directly to repair technicians and provide detailed information display in plain English, with a complete description of what activity is happening and how to manage it.

Selection of SCADA Master Have tools to filter out nuisance alarms (to prevents operators from loosing confidence and stop responding even to critical alarms) Support multiple backup masters, in separate locations (primary SCADA master fails, a second master on the network automatically takes over, with no interruption of monitoring and control functions) Support multiple open protocols to safeguard the SCADA system against unplanned obsolescence.