Duct Free System.

Slides:



Advertisements
Similar presentations
Charging System Tests & Voltage information Checking the charging system with just a volt meter.
Advertisements

Operating Functions.
Daikin Altherma™ Troubling Shooting
2008 AQV, EH, DH and FJM Inverter Troubleshooting
HEAT PUMPS.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
AC-SSC-1 Installation and operation manual
Trane Variable Water Flow System
38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
13 SEER Ductless Mini Splits
Introduction To Programmable Logic Controllers
Cooling Only 38MFC/ 40MFC Heat Pump 38MFQ/ 40MFQ
PHSAUTOMOTIVESALSPHSAUTOMOTIVESALS Charging System tests & Voltage information Checking the charging system with just a volt meter.
© 2012 Rinnai America Corporation Rinnai Circ-Logic (RCL)
Product Introduction.
Daikin Australia Pty. Limited Ducted Split Systems 2011.
Project Goals And Objectives ____________________________________________________ Create a “smart”, customizable, all in one system Little to no learning.
2-Stage Heat Pump Defrost Options Defrost options: –30, 60, 90, 120 or Auto (Infinity/Evolution only) Defrost initiate temp: 32° F Defrost terminate temp:
General Troubleshooting Tips.
MDS COMMISSIONING.
Air Handler Terminology
Air Handler Terminology
TECHNICAL TRAINING 2008.
Pressure-Enthalpy and the Variable Refrigerant Cycle
Fan Coils Units Control
CUE – Make Any Pump an E-Pump
Service Section Technical Training December 2005.
 E4 HVACR Electrical Installation #3 Circuit breakers, disconnects, and fuses.
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. 5 August 2014.
We apply 120 VAC to the HM Unit (Remember to check polarity!) Our primary step down T/X provides power to terminal “X” and “COM” on the ignition control.
Service Section Technical Training. Sequential Controller SQ 1.0.
4.0 Equipment Installation Aspects (Section 4.7 System Controls)
Air condition installation
Refer to Service Manual for details Fault codes. To retrieve fault codes from the remote controller Press the ‘CHECK’ button for approximately.
IZFI Condensing Unit Installation & Commissioning.
2013 CHIGO Product CHIGO CMV VRF Control System.
shift to the Test Mode (Forced Operation).
UniTrane™ Terminals High Wall Fan Coil: W-Line Ducted Fan Coil: D-Line
Product Overview Analogue Input, 2fold, SM  Box  Sensor connections
Two Stage Communicating System
VRF Trouble Shooting 采用midea通用PPT模版, 参考《公司简介》PPT.
User Operation Presentation
1. How much current flows if you connect a ohm resistor to a 12
CHIGO VRF System Commissioning.
ABB i-bus® KNX Valve Drive Actuator VAA/A
5. Outdoor unit Installation
Blower-/Fan Coil-Actuator
7. Test operation.
Asahi/America Electric Actuators Series 94.
P. 1 FIELD SETTINGS INDOOR UNIT : –REMOTE CONTROLLER : INSPECTION MODE, FIELD SETTING, SERVICE MODE. OUTDOOR UNIT : –PUSH BUTTON + LED INDICATION : TEST.
Table of Contents Heat Pump Operation Charging Procedure Defrost Board
Fault codes.
R3 Controls, Valves, Accessories & Heat Pumps
Basic circuits Electrical circuits Electrical properties Ohm’s law
Technician Operation Presentation
Asahi/America Electric Actuators Series 94.
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
Model Output Current Battery Life BATPSU VDC 2A 1.2Ah BATPSU VDC 2.3Ah
Solstice All Options Gas Fired Fryer Service Presentation (CE-UK)
NRL NRL - Welcome to the NRL Sales Training Program
Universal Interrupted Electronic Oil Primary R7184U Training Module
NRL NRL - Welcome to the NRL Sales Training Program
Error codes for split systems
NRL NRL - Welcome to the NRL Sales Training Program
NRL NRL - Welcome to the NRK Sales Training Program
NRL NRL - Welcome to the NRL Sales Training Program
Presentation transcript:

Duct Free System

DFS Long Line Guide

DFS Long Line Guide

DFS Long Line Guide “ accessories ”

DFS Long Line Guide “ all specifications ”

DFS Long Line Guide “ DFS Pistons…”

New DFS Puron Units 40/38 MVC & 40/38MVQ

DFS PRODUCT CONCEPT 13 SEER fixed speed, R410A Carrier Phase 1: 115 volt 9 & 12 KBTU/Hr Cool only & heat pump 208/230 volt 18 KBTU/Hr Cool only Phase 2: 12 KBTU/Hr cool only & heat pump 18 heat pump 24 KBTU/Hr cool only & heat pump Carrier brand picture

High wall unit’s Control The remote control and emergency control are the only way to operate and control the highwall units. 76 F set point No wired control available. Remote control only or emergency button. One way communications.

High wall display board ( Cooling and Heat Pump ) 9 K

High wall display board ( Cooling and Heat Pump ) 12 K

High wall display board ( Cooling Only 018 & 024 )

High wall display board ( Cooling and Heat Pump 018 & 024 )

Operating Conditions Cooling: Heating: Outdoor Ambient: 55° F – 125° F Low ambient: -20° F to 55° F Indoor Set point range: 64° F – 85° F Heating: Outdoor Ambient: 5° F – 75° F Low ambient: -20° F to 55° F Indoor Set point range: 55° F – 80° F

Operation… Run time: Reversing valve: Temperature offset: Minimum run time – (3 seconds), none…. Minimum off time – 3 minutes Reversing valve: Energized in the heating mode Temperature offset: 1°C above and below set point. 3.6°F swing

System Wiring 009 & 012 K units Field Wiring 35 VDC 115 V

System Wiring 012 K units Field Wiring 35 VDC 208/230 V

System Wiring 18 & 24 K units 208/230 V Field Wiring The “S” terminal – signal terminal carriers a 24vdc voltage. However if you measure VAC from the “S” terminal to L1 or L2 you will measure approximately 200VAC. There are no amps behind this voltage > 0.5ma.

High wall (system) trouble shooting LED’s indicators: solid or flash code for errors

Line lengths….. Unit’s charged for 25’ Minimum line of 10 feet… If line set is over 25’ a crankcase heater is required…

Service Manual – board voltages

Service Manual – flow charts

Service Manual – flow charts

Service Manual – sequences

Service Manual – sequences

Service Manual – long line/charge

Service Manual – piping diagram

Service Manual – wiring diagram