Water Filtration Plant Improvements Project Summary

Slides:



Advertisements
Similar presentations
Amherst , MA, Drinking Water System Atkins Water Treatment Plant
Advertisements

TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
City of Oshkosh Water System. Public Works Utility Division Water Filtration Plant Water Distribution System Wastewater Collection System Pumping Stations.
Case Study: Disinfection byproducts in a recently constructed public water supply Maria O’Connell, P.E. Kristine Wheeler, P.E. New York State Department.
Brushy Creek Municipal Utility District Water Facility Project Status Update Presented at April 9, 2009 Board Meeting Joseph Jenkins, P.E., CH2M HILL.
Surface Water Treatment Plant
Calcite Contactors for Corrosion Control
City of Willits WTP Design and Funding Procurement Update February 24 th City Council Meeting Scott Buecker, P.E.
20,000 Barrel Per Day Produced Water Treatment System
WELCOME TO THE KENNEBEC WATER DISTRICT FILTRATION PLANT.
Stantec Environmental MQP By: Mike Enko & Alex Simpson 1.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.
Willamette Water Treatment Plant
NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration? ä Where should the plant(s) be located?
Molalla Water Treatment Plant Field Trip 4/24/07 Molalla Water Treatment Plant Field Trip 4/24/07.
History In 1932 Plymouth constructed its first wastewater treatment plant In 1959 they transferred the sewage utilities over to Plymouth Utilities.
Surface Water Treatment Plant. Fig 4-8: Flow Diagram of conventional surface water treatment plant (“filtration plant”)
Introduction to Environmental Engineering Code No. (PE389) Lec. 5 and 6.
BCE Environmental Engineering Water Treatment Mdm Nur Syazwani binti Noor Rodi.
Water Treatment CE 326 Principles of Environmental Engineering Department of Civil, Construction and Environmental Engineering Iowa State University March.
2015 Needs Assessment Our Strategy for Success Scott Torpie Washington State Office of Drinking Water.
Water System Planning Study
Vienna, 17th/18th February 2014 Heinz-Jürgen Brauch und Florian R
Scaling-Up Partnership Activities Mr. Serm Huekkhuntod, PWA Water Safety Conference 2010.
Cheri Cousens, P.E. – Executive Director September 15, 2010.
Water treatment Lilly Corradi.
Future Water Supply - for the Ashley Valley D. Gerard Yates Central Utah Water Conservancy District.
Processing, distribution and use of water.
ENCE 667 Project Performance Measurement Patuxent Water Treatment Plant Upgrade schedule analysis Presented by: Luis Rubio Isobo Tariah.
Committed to providing safe, high quality water and related business services earning customer trust and confidence. Louisville Water Company Capital Program.
Water in the Community: From Lake Ontario to us Thursday, March 25 th.
Southeast Energy/Water Interdependence Exercise Basic Drinking Water Treatment EPA-R4 Drinking Water Section April 25, 2007.
SETA Water treatment plant maintenance
Drinking Water Quality and Health
Natural Resources Waste Water Management. Wastewater entering the treatment plant includes items like: Wood Rocks Dead animals Wedding Rings  Unless.
Screening: Wastewater entering the treatment plant includes items like wood, rocks, and even dead animals. Unless they are removed, they could cause problems.
NC AWWA-WEA 2015 Annual Conference Monday, November 16, 2015 The Use of Chlorine Dioxide to Reduce TOC at Davidson Water, Inc. Water Treatment Plant.
Demonstration Project in Waste Water Treatment Delhi Jal Board, India Is Water Business Export Business? DHI, 14 October 2011 Peter Sand.
Water Treatment Plant Austin and Alison.
Introduction to Environmental Engineering Dr. Kagan ERYURUK
Date: Monday, May 11 th 2015 Topic: Water Purification Objective: To recognize the stages of it.
Water and Wastewater Treatment
What’s new in Water Treatment? Coagulants and Filter Aids Sticky Particles vs. Sticky Media Coagulants and Filter Aids Sticky Particles vs. Sticky Media.
Update on RCR Permitting
TRUMAN MIDDLE SCHOOL Presented by Counsilman ▪ Hunsaker Facility Audit.
Presented by: David S. Prinzhorn, P.E. Town Engineer/Public Works Director/Utilities Manager Town of Cave Creek.
December 10, 2009 TOWN OF PALM BEACH WATER COMMITTEE Discussion of Water Plant Options.
Energy Conservation Building Upgrades Alma School District.
University of Wyoming Environmental Engineering Senior Design Team Leah Birgen Brent Brouillard.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
1 Standards and Construction Specifications Manual Orange County Utilities February 13, 2007.
Workshop developed by RCAP/AWWA and funded by the USEPA
Amherst , MA, Drinking Water System Atkins Water Treatment Plant
welcome to the Kennebec water district filtration plant
RUSSELL - ROSSBURN WATER SUPPLY
Lecture # 11 Water treatment:.
Jim Flechtner, PE Executive Director April 26, 2018
مبانی کار تصفیه‌خانه‌های آب
Wastewater Facilities Upgrade Project
A Tale of Two Plants: How Combining WWTP and WTP Improvements in Reidsville is Setting the Stage for the Future Kevin Irby, P.E. Kevin Eason, P.E
Southwest Section AWWA 2018 – Baton Rouge, LA
Water purification in water treatment plant.
National Optimization Goals
The Project Overview and Status Report
Trihalomethanes Removal Evaluation
MANILLA WATER SUPPLY UPGRADE
Presentation transcript:

Water Filtration Plant Improvements Project Summary Groton Utilities Meeting Presentation January 30, 2017

Project Pricing: Sitework Electrical Mechanical Building Improvements WTP Rebuild $43,901,043 Engineering $4,198,508 Contingency $5,900,449 Mechanical Building Improvements Finished Water Storage DAF – Dissolved Air Flotation GAC – Granular Activated Carbon TOTAL PROJECT COST: $54,000,000 Mn Contractors Miscellaneous Process Control THM Removal Hazmat Removal Contingency Engineering

Project Facility History 1890’s Pumping Station 1938 – Unit 1 Construction 1947 to1952 – Unit 2 Construction 1960 – Unit 3 Construction 1974 – Sedimentation Basin Addition to Unit 3 1978 – Booster Station Added 1986 to 1989 – Spent Backwash Water & Sludge Lagoons 1989 – Chemical Feed Upgrades 1991 – Low Lift Pump Upgrade 1993 – Emergency Generators Replaced 2007 – SCADA system

Project History - Study & Preliminary Design 2007 – Sedimentation Basin Study & Recommendations 2008 – Pilot Study - Dissolved Air Floatation , Granular Activated Carbon and Manganese Contactors 2009 – Water Treatment Plant Evaluation & Conceptual Design Report Opinion of Construction Cost $30M to $46M 2013 – Preliminary Design of Improvements DAF/GAC/Mn Contactors Opinion of Construction Cost $29M to $41M Project Review with Drs. Knocke & Edzwald

Project History - Design 2014 – Value Engineering Study at 30% Opinion of Construction Cost $30M to $35M 2014 – Value Engineering Study at 60% Opinion of Construction Cost $37.5M 2014 – Pilot Testing of Manganese Contactors 2016 February – Final Design Sent to CTDPH for review 2016 Summer – Address CTDPH Comments August 2016 – Receive CTDPH approval to Bid the project

Project History – Bid Phase August 24, 2016 – Advertise For Bid September 2016 – Mandatory Prebid Conference for General Contractors September 2016 - General Contractor Site Visits November 8, 2016 – General Contractor Bids Received RH White Banton Carlin DOC Nickerson Walsh Base Bid $43.9 $44.6 $45.67 $45.7 $47.9 $51.95 w/Deducts $39.3 $40.8 $40.9 $41.6 $48.3 % Difference 1.6% 4% 4.1% 9% 18%

Architect Drawing

Overview of the Main Project Components

Overview of the Main Project Components ELECTRICAL – Upgrade of 60 year old electrical system MECHANICAL – Upgrade of 60 year old pump and piping systems ENERGY CONSERVATION – Building envelope/equipment/HVAC FIRE PROTECTION / EMERGENCY – Elevated Water Storage CLARIFICATION – Construction of dissolved air flotation system FILTRATION – Construction of deep bed granular activated carbon filters. MANGANESE REMOVAL – Retrofit manganese contactors PROCESS CONTROL – Supervisory control and data acquisition of all systems TRIHALOMETHANE REMOVAL – Construction of systems in storage tanks existing and new

Operators View of Importance Electrical Upgrade Convert to Modern Voltage Compatibility with GU electric system upgrade Replace Outdated Electrical Equipment Emergency Generators Odd Voltage Switchgear No Longer supported

Operators View of Importance Mechanical Pumping & Piping Aged Pumps (1948 to 1991) Variable Frequency Drives Increase Reliability & Efficiency Piping (Buried & Internal) Aged Pipe Inoperable Valves

Operators View of Importance Energy Conservation Upgrade Electrical System Building Envelop Improvements Insulation, new windows Modern Heating, Ventilation and Air Conditioning System Credits / Rebates Overall Energy Savings

Operators View of Importance Finished Water Storage Limited useable depth in the existing Increase for Fire Protection Backwashing Filters Capacity for Regional Demands Allow for WFP shutdowns for maintenance

Importance of Treatment & Chemical Systems CLARIFICATION Better at removing small light particles, color compounds, and algae than current sedimentation treatment Chemical application - same dose of coagulant is more effective at removing turbidity SAFETY – Operators don’t have to enter basins to remove solids

Importance of Treatment & Chemical Systems Filtration Granular Activated Carbon More effective at removing a wide assortment of contaminants, especially organics, than rapid sand filters Deep bed GAC is more effective than GAC-capped rapid sand filters (1930s technology with a “lid” of GAC) New filters will have filter-to-waste technology as required by regulations

Importance of Treatment & Chemical Systems Manganese Removal Contactors Retrofit Removes Mn without chemical treatment (currently CIO2; by-products = Chlorite, Chlorate Currently a Health Advisory for Mn (0.3 mg/L), not an MCL On test list for UCMR4 (2018-2020 sampling period) for possible regulation Regulated in Ontario, Canada

Operators View of Importance Process Control Upgrade Chemical Feed Systems SCADA Upgrades Increase Flexibility & Reliability Improve regulatory compliance

Importance of Treatment & Chemical Systems Trihalomethanes (THMs) Removal Regulations are Stricter Current Plant does not address removal of Precursors Form within Distribution System Trihalomethanes are compounds formed when chlorine comes in contact with natural organic matter in water; they are an issue for any WTP that uses surface water reservoirs as their source water Previous upgrades to current WTP were not able to address THM reductions, new plant processes and distribution system upgrade will achieve reductions in THMs (better turnover in Bailey Hill tank = less water age = less THMs

Project Pricing: Sitework Electrical Mechanical Building Improvements WTP Rebuild $43,901,043 Engineering $4,198,508 Contingency $5,900,449 Mechanical Building Improvements Finished Water Storage DAF – Dissolved Air Flotation GAC – Granular Activated Carbon TOTAL PROJECT COST: $54,000,000 Mn Contractors Miscellaneous Process Control THM Removal Hazmat Removal Contingency Engineering