ACEC Presentation September 22, 2016

Slides:



Advertisements
Similar presentations
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
Advertisements

DC Water Town Hall Meeting Series 2013 General Manager George S. Hawkins.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee November 9, 2010 Information Item Master Water.
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
JULY BUDGET WORKSHOP NO FISCAL YEAR ENTERPRISE FUNDS Innovation will serve to keep the plan in the forefront of all that we do. Our actions.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
FISCAL YEAR BUDGET MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
FY Budget Presentation to Board of Finance March 31, 2014 SWPCA William P. Brink, Executive Director Rhudean Bull, Administration Manager.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Norwalk, Connecticut: A Public-Private Partnership Case Study Mayor Alex Knopp U.S. Conference of Mayors Urban Water Council October 2004.
IBM Smarter Cities Challenge City of Tucson Award Recipient for 2013 November 14, 2012.
Paul A. Weghorst Executive Director of Water Policy
1 Department Department of of Public Utilities Presentation of Study Results August 2006.
DRA Advocacy Joe Como, Acting Director. 2 DRA Facts The Voice of Consumers, Making a Difference! 3  History: CPUC created DRA (formerly known as the.
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
WATER DEPARTMENT BUDGET WORKSHOP FY16 RECOMMENDED BUDGET March 12, 2015.
U.S Conference of Mayors August 2004 Mayor’s ’04 Metro Agenda Bipartisan Priorities Statement Directed for candidates in Presidential and Congressional.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Battery Backup Workshop Issues Joseph Mardesich Senior Director- Engineering Comcast California Region February 2, 2009.
City Manager’s Proposed Budget for Fiscal Years 2010 and 2011 City of Palo Alto Finance Committee May 19, 2009 Public Works Department- Enterprise Funds.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
1 Why Budgeting Matters NC Local Government Budget Conference Wilmington, NC July 2007.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Pasadena Water and Power Public Hearing Date Water Capital Improvement Charge Pasadena City Council Meeting November 16, 2015 Agenda Item #13.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Long-Term Financial Planning Plan of Finance 1 Debby Cherney, Deputy General Manager Charles Turner, Director of Finance
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
1 Water Department FY 2014 Sources and Uses FY 2014 Sources Retail Sales$54,788,834 Wholesale Sales646,250 Other Operating Revenues145,000 Non-Operating.
City of Palo Alto Utility Rate Changes FY 2013 Facility Managers’ Meeting August 16, 2012 Ipek Connolly, Senior Resource Planner.
Presented By: Budget & Research Department Karen Rhodes-Whitley FY STATUS REPORT & THREE-YEAR FINANCIAL FORECAST SUMMARY FISCAL YEARS
Kevin Burnett Presented by CITY OF TULARE, CALIFORNIA.
Public Hearing – FY 2017 – 2021 Recommended Capital Improvement Program Budget April 25, 2016.
What are they and how are they calculated? May 2015.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
BGE Smart Grid Initiative Stakeholder Meeting September 17, 2009 Wayne Harbaugh, Vice President, Pricing and Regulatory Services.
UTILITY PARTNERSHIP CITY OF STOCKTON & OMI / THAMES WATER SERVICE CONTRACT.
Approval of FY-2016 Capital Budget and the 10-Year Capital Plan February 11, 2015.
Status Update on USEPA Compliance Sausalito City Council February 26, 2013 SMCSD Directors Raymond Gergus, President Bill Ring, Vice President Ann Arnott.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
CSA 7 – Boulder Creek. YOUR SANITATION FACILITY Facility Includes the Following Five Pump Stations –Total of 10 pumps 16,553 feet of collection lines.
Asset Degradation Modelling at Townsville Water
JEA’s Initiatives and Capital Improvements Program
Proposed Draft Financial Plan April 10, 2017
Portugal Cove - St. Philip’s
Irvine Ranch Water District Distributed Energy Storage Case Study
RUSSELL - ROSSBURN WATER SUPPLY
SMUD - Whole Foods Energy Storage System
Narragansett Electric Rate Classes
City of Madras System Development Charges
City of Sisters, OR 2017 Water & Sewer Rate Study
ACEC Presentation September 22, 2016
Large User True-up Process
Microgrids and Energy Storage for Smart City Planning
System Development Fees
Eric Hanssen, P.E., LEED AP, CEM ANTHC Rural Energy Initiative
Dana Heiberg, Senior Planner February 5, 2018
Rose Drive Friends Church Solar Project Proposal
Cost of Service and Rate Study
City of Lebanon, Missouri Electric Department
City of Valdosta Utilities Department.
City of Rehoboth Beach Water and Wastewater Financial and Rates Review
FEE INCREASES Public Work Shop June 2, 2018.
Metropolitan Mayors Caucus Illinois Energy Bills
WECC 2019 Scenarios – Scoping
Meeting the challenge: Electrification and Climate Change
Farmer City Fiscal Year
FY2019 Proposed Budget Open House
UM 1856 PGE’s Energy Storage Proposal – Commission Workshop #1
Presentation transcript:

ACEC Presentation September 22, 2016 Chris Hassert, PE Planning & Engineering Director

Discussion Items Staff Overview Group Focus Areas Capital Improvement Program Water/Sewer Rates Campus Solar/Battery Project

ASSIGNED FACILITIES, SYSTEMS OR PROGRAMS Water Resources Engineer Planning and Engineering Team TITLE ASSIGNED FACILITIES, SYSTEMS OR PROGRAMS   Water Resources EIT Process Control Assistance Water Resources Engineer Water Distribution System & Hydraulic Modeling Sewer Collection System, RWDS, IWDS Senior WR Engineer Asset Mgmnt, CGTF & Site 80, CAP WTP SROG Support, CWTP, Water Campus Reclamation Plant Principal WR Engineer Water/Sewer Planning & Development Interface Process Control Lead for CAP WTP, Chaparral WTP, Campus/AWT All Potable and Recharge wells, Westworld, Desert Mtn

Planning and Engineering Functions Master Planning Infrastructure Improvement Plans (IIPs) CIP Development Asset Management IGAs and Other Agreements Studies and Evaluations Other Challenges – Salinity, Invasive Species, etc.

Planning and Engineering Functions Troubleshoot system issues Develop project scopes and budgets Engaged in design and construction Guide developers Manage groundwater wells Treatment plant process control Hydraulic model management Monitor sewer flows Pilot test new technologies

Scottsdale Water Capital Improvement Program (CIP)

How do we pay for system capital needs? Water and Sewer Rates – Monthly billing of customers pays for operating costs and asset rehab and replacement Development Fees – Pays for growth Water Development Fee Sewer Development Fee Water Resources Development Fee Agreement Revenue - Cost recovery Golf courses, adjoining systems

Scottsdale Water CIP FY16/17 to FY20/21 Took effect on July 1, 2016 CURRENT 5-YR CIP $176.7 M   AVERAGE YEARLY CIP $35.3 M HIGHEST YEAR (FY 16/17) $70.3 M LOWEST YEAR (FY 19/20) $21.2 M NOTE: Approximately $131M of available funds going into this FY

CIP FUNDING BREAKDOWN FY17-FY21

Water Infrastructure Projects Waterline replacements BPS upgrades Large meter replacement Reservoir rehab Well rehab and replace Membrane replacement Telemetry upgrades Security enhancements Treatment plant mods Other asset mgmnt. driven items

Highlighted Water Projects Reservoir Rehab Gaseous Cl2 Conversions Electrical Upgrades BPS Upgrades FLW Transmission Main East Shea Improvements TGTF Design & Construction

Reclamation Infrastructure Projects Sewer replacements Sewer lining and manhole rehab Odor control Lift station upgrades Membrane replacement Telemetry upgrades Security enhancements Treatment plant mods Advanced treatment mods Other asset mgmnt. Driven items

Reclamation Projects Sewer Assessment Program Lift Station Upgrades Pumpback Rehab Telemetry Upgrades Campus Treatment Facility Mods Gainey Structural Repair

Asset Management Data base

Water and Sewer Rate Adjustment History Fiscal Year Water Sewer Combined 2010/11 - 0 - 2011/12 2012/13 2013/14 (1.8%) 4.0% (0.2%) 2014/15 (1.2%) (0.3%) 2015/16 1.3% 2.6% 1.6% 2016/17 Cumulative (0.5%) 5.4% 1.1% Rate reductions resulted from rate structure changes driven by cost of service study results and revenue stability.

Water Campus Solar Project Solar Services Agreement (SSA) with SolarCity for 2.3MW of solar infrastructure 2000 kWh Tesla lithium-ion battery storage 20-year agreement No capital required by Scottsdale Water SolarCity finances, designs, builds, operates and maintains system SSA approved by Council on July 5, 2016

Project Location – Scottsdale Water Campus

Project Benefits Estimated $1.4M energy savings over 20-year agreement Solar/Battery combination reduces demand charges on electric bill Project will offset 10% of electric grid supplied power to Campus with clean renewable energy Battery storage will serve as an additional power back-up in the event of a regional power outage

Battery Storage Benefits Illustrated Trim Peak Demand Reduce Demand Charges Lower Bills Demand Spike Batteries Trim Demand Spikes