ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: –http://indico.cern.ch/categoryDisplay.py?categId=2957 The full shutdown planning.

Slides:



Advertisements
Similar presentations
TC meeting /11/14TC meeting2 ALICE LS1 plan from now till MarchWeeks Install TRD infrastructure46 TRD4&5 (and counterweights removal)47.
Advertisements

LS1 planning meeting Activities weeks 13, 14 & 15 22/3/13LS1 planning meeting - A.Tauro2.
ALICE planning meeting /12/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /12/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
TC meeting P2 planning wks 7&8 A.Tauro
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
winter shutdown preparatory meeting A.Tauro /1/12ALICE winter shutdown schedule - A.Tauro 1.
J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING.
winter shutdown planning A.Tauro
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
LS1 planning meeting Comments on LS1 schedule Schedule reviewed last week with Yann + TC…  sequence after OD looked too squeezed  therefore.
ALICE 5 o’clock meeting Wk 49
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
TS4 preparatory meeting TS4 – weeks Underground access possible in week 51 – as from Monday morning 9:30 –Ulli and Philippe will start.
winter shutdown preparatory meeting A.Tauro /12/11ALICE winter shutdown schedule - A.Tauro 1.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
ALICE TC meeting – Plans for the next technical stop A. Tauro.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
winter shutdown planning A.Tauro
winter shutdown planning A.Tauro
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
TS May 9-12 – Schedule SL instructions: Both magnets ramped down Monday May 9 th 7:00 latest Thursday: check with CCC before restarting magnets: – TE-EPC.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
ALICE planning meeting /2/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
TC meeting P2 planning wks 9&10 A.Tauro
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
ALICE 5 o’clock meeting Wk 49. INDICO You’ll find this meeting here: – The full shutdown planning.
winter shutdown planning A.Tauro /1/12ALICE winter shutdown schedule - A.Tauro 1.
ALICE 5 o’clock meeting Wk 49
TC meeting P2 planning wks 5&6 A.Tauro
TS2 preparatory meeting A.Tauro. General information LHC- TS2: from Monday 31st 6am, to Friday 4th 5pm LHC beam stops on Monday morning.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
TS3 preparatory meeting 14/9/2012 TS3: 17-21/
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
TS3 preparatory meeting A.Tauro. General information LHC-TS3: from Mon 9 6am, to Fri 13 5pm LHC beam stops on Mon morning at 6:00.
TC meeting P2 planning wks 3&4 A.Tauro
ALICE planning meeting /11/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
DCal-ALICE integration and installation plan and status A. Tauro.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
ALICE Installation: Planning Meeting Agenda: 1- ALICE shutdown schedule 2- Miniframe removal sequence.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
EYETS planning A.Tauro.
ALICE 5 o’clock meeting Wk 51.
ALICE planning meeting
Some arrangements for personnel safety 1- Procedures for access
TS2 preparatory meeting
LS1 planning meeting - A.Tauro
LS1 planning meeting
CMS Area Working Group Meeting
ALICE 5 o’clock meeting Wk
LHC-TS3 Coordination meeting #3
May 2017 Four Year Old Class S&T: red 2 S&T: yellow 3 S&T: blue 4 5 6
TS1 preparatory meeting
ALICE TC meeting – Plans for the next technical stop
M.Tavlet, H.Taureg - ALICE
Shutdown conclusion, LS1 and LS2 planning - A.Tauro
LHCb & EYETS
ALICE 5 o’clock meeting Wk
DAYS OF THE WEEK.
TRD GAS SYSTEM PRR Gas System Integration Gas building
Time management School of Rock.
Sunday Monday Tuesday Wednesday Sunday Monday Tuesday Wednesday
Assumption for a given sector
Extended Christmas Hours Thursday December 8th 9am -6:30pm Friday December 9th 9am -6:30pm Saturday December 10th 9am-6pm Thursday December.
Contact
Lovejoy Community Center April “2018”
2011年 5月 2011年 6月 2011年 7月 2011年 8月 Sunday Monday Tuesday Wednesday
Presentation transcript:

ALICE 5 o’clock meeting Wk 50

INDICO You’ll find this meeting here: – The full shutdown planning is here: –

13/12/105 o’clock meeting3 Access request Cavern and surface You should submit an ADI and a task procedure Two persons minimum Work breakdown structure – risk associated at each step ADI Task procedure Template EDMS Attach task procedure

13/12/105 o’clock meeting4 ALICE Christmas break schedule OpenExperiment TRD EMCal CloseExperiment Open L3 doors Close L3 doors

13/12/105 o’clock meeting5 UX25 access Rules for access restrictions: Removal/installation of shielding (restriction includes RB24 triplets) PX24 blocks: no access CR5 and UX25 PX24 beams (35t): no access CR1-5, Expo, and UX-25 All other blocks: no access to UX-25 LHC evacuation test (7/12 after 18:00 and 24/12 tbc) – no access UX25 Gas functional test (10/ hrs) – no access UX25 and CR1-5 AUG test (20/1) (Arrêt Urgence General – General Emergency Stop) – no access UX25 DSO test (12-13/1) (Department Safety Officer) – no access UX25 No access SX2 during manipulation of blocks in SX2 (except ACR and WRs)

13/12/105 o’clock meeting6 L3 (and MNF) access No Ventilation EMCal No Ventilation +AUG Wks 50 and 4: access (TPC) to be coordinated with TC (transport) Wks 1-2: no access during EMCal SMs insertion inside L3 (see day-by-day) When moving from low-beta to yellow platform: no access to MNF When inserting the module: no access L3 and MNF Watcher needed in wk 49 and from wk 4 onwards Wk 6 or 7 (tbd): Kr calibration – TPC T stability (all interventions to be agreed by TC/RC) Evac.

Day-by-day schedule UX25 and MNF - Wk 50

13/12/105 o’clock meeting8 Access status: 8: :00: UX25 cavern in Restricted mode –No access UX25 (except Transport and TC) From 18:00 - Cavern in General mode No access L3 (no ventilation) Activities: ALTEAD: MNF shielding: O-side wall Lift PMD CROCUS SPIE: removal L3 ventilation Philippe: cut SPD pipe (chillers) Activities after 18:00: TRD T0 Week /12 Monday

13/12/105 o’clock meeting9 Activities in UX25 - Week /12 Monday LV156 No access L3 (no ventilation) L3 ventilation LV156 MNF shielding

13/12/105 o’clock meeting10 Activities in MNF - Week /12 Monday No access L3 (no ventilation)

13/12/105 o’clock meeting11 Access status: 8: :00: UX25 cavern in Restricted mode –No access UX25 (except Transport and TC) From 18:00 - Cavern in General mode No access L3 (no ventilation) Activities: Gas upgrade (SG2): stop all gas systems. X-ray at night –Evacuation all Ar/H2 bottles (Fayet, morning) SPIE: new PMD ventilation (removal filter) –VIC at 10:30 (tbc) Activities after 18:00: Week /12 Tuesday

13/12/105 o’clock meeting12 Activities in UX25 - Week /12 Tuesday Open I-side door No access L3 (no ventilation) LV156 MNF shielding (green bridges) PMD ventilation

13/12/105 o’clock meeting13 Activities in MNF - Week /12 Tuesday No access L3 (no ventilation)

13/12/105 o’clock meeting14 Activities in UX25 - Week /12 Wednesday Open O-side door 18:00 to 8:00: access in general mode 8:00 to 18:00: no access UX25 (except Transport) TRD cooling TPC FEC Dismount back wall of laser hut Laser After 18:00 Normal hours (access to be coordinated with TC) VIP visit: Finance and Council Delegates – 16:30 (1hour) LV156 YP rails Release all TOF crates supports (Yannick- Samuel) Gas upgrade: stop all gas systems PMD ventilation

13/12/105 o’clock meeting15 Activities in MNF - Week 50 15/12 Wednesday 8:00 to 18:00: no access UX25 18:00 to 8:00: access in general mode

13/12/105 o’clock meeting16 Activities in UX25 - Week /12 Thursday Laser After 18:00 18:00 to 8:00: access in general mode 8:00 to 18:00: no access UX25 (except Transport) TRD cooling Arrival PMD team TPC FEC EN-EL Motorize L3-Dipole-Miniframe circuit breaker (T.Bourrel, 10:30) Delivery to P2 of 2 (last) EMCal modules Lower YP onto rails Release all TOF crates supports (Yannick- Samuel) PMD ventilation

13/12/105 o’clock meeting17 Activities in MNF - Week /12 Thursday 8:00 to 18:00: no access UX25 18:00 to 8:00: access in general mode Removal MNF staircase (access with ladder)

13/12/105 o’clock meeting18 Activities in UX25 - Week /12 Friday Laser After 18:00 Decoupling TPC-Space- Frame (Yannick- Samuel) 17:00 to 8:00: access in general mode 8:00 to 17:00: no access UX25 (except Transport) TRD cooling Lower TRD 16. No access low-beta platform TPC FEC

13/12/105 o’clock meeting19 Activities in MNF - Week /12 Friday Disconnect PMD services (after 20:00) 8:00 to 17:00: no access UX25 17:00 to 8:00: access in general mode

13/12/105 o’clock meeting20 Activities in UX25 - Week /12 Saturday Laser After 18:00 17:00 to 8:00: access in general mode 8:00 to 17:00: no access UX25 (except Transport) Decoupling TPC-Space- Frame (Yannick- Samuel)

13/12/105 o’clock meeting21 Activities in MNF - Week /12 Saturday Disconnect PMD services 8:00 to 17:00: no access UX25 17:00 to 8:00: access in general mode

13/12/105 o’clock meeting22 Activities in UX25 - Week /12 Sunday Access in general mode TRD team at CERN: 19 (PM) to 23/12

13/12/105 o’clock meeting23 Activities in MNF - Week /12 Sunday Disconnect PMD services Access in general mode

13/12/105 o’clock meeting24 DCS plans Wk 50 –Mon 13/12 – Tue 14/12 (daytime): Force upgrades and patches to all remaining systems Systems unavailable for short (~hrs) periods, frequent reboots –Support to detectors restarting/testing their systems after upgrades Detectors shall test functionality as much as possible André / Peter

13/12/105 o’clock meeting25 AOB -