B2GM, July 2013, Blacksburg, VA B2GM Summary 1 Blacksburg, VA, July 4-7 Executive changes Spokesperson: Peter Krizan -> Tom Browder IB Chair: Eunil Won.

Slides:



Advertisements
Similar presentations
H.-G. Moser Max-Planck-Institut fuer Physik 2 nd open meeting July 4, 2008 Report on PXD Session.
Advertisements

The Belle Silicon Vertex Detector T. Tsuboyama (KEK) 6 Dec Workshop New Hadrons with Various Flavors 6-7 Dec Nagoya Univ.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Embedded Pitch Adapters a high-yield interconnection solution for strip sensors M. Ullán, C. Fleta, X. Fernández-Tejero, V. Benítez CNM (Barcelona)
Status and outlook of the Medipix3 TSV project
Construction and Installation of the CLIC Experimental Area
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
19 November 2009 Christian Irmler (HEPHY Vienna) APV25 and Origami Scheme 4 th Open Meeting of the Belle II Collaboration.
SuperKEKB 3nd open meeting, July Hans-Günther Moser MPI für Physik PXD Summary Other talks in software, SVD and DAQ sessions.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
FPCCD Vertex detector 22 Dec Y. Sugimoto KEK.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
Jyly 8, 2009, 3rd open meeting of Belle II collaboration, KEK1 Charles University Prague Zdeněk Doležal for the DEPFET beam test group 3rd Open Meeting.
Construction and Status of the Origami Module Prototype C. Irmler, M. Friedl HEPHY Vienna.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
DEPFET Workhop, Ringberg, June Ladislav Andricek, MPG Halbleiterlabor Lessons learned from EMCMs assembly status - next steps.
7th PXD/SVD Workshop, Prague, January 2015 Rainer Richter, MPG Halbleiterlabor 1 Pilot Run - Status and Plans PXD9-6 Rainer Richter for the MPG Halbleiterlabor.
2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
,C. Kiesling, 10th BPAC Meeting, KEK, Japan, Feb. 7-9, VXD Commissioning Organizational Matters (in response to the BPAC October report) Overall.
Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.
C. Kiesling, B2GM PXD Session, KEK, March , Towards a Neural z-Vertex Trigger for the CDC News from the DEPFET Collaboration New Schedule.
EMC issues for cabling and racks layout design. (Belle II – Grounding) F.Arteche.
Hybrid Boards for PXD6 5th International Workshop on DEPFET Detectors and Applications Sept Oct Christian Koffmane 1,2 1 Max-Planck-Institut.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
PXD ASIC review, October 2014 ASIC Review 1 H-.G. Moser, 18 th B2GM, June 2014 Date and Location MPP, October 27, 10:00 – October 28, 16:00, Room 313 Reviewers:
VXD Workshop, Valencia, Jan Ladislav Andricek, MPG Halbleiterlabor 1 pilot module assembly - lessons learned -
PA and Origami Status and Plan Koji Hara (KEK) Jan. 21, th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors and Applications.
SVD IR mechanics status S.Tanaka SVD mechanics session.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
6 th Belle PAC, KEK, February 26 and PXD - EVO, 5/March/2012 Ladislav Andricek, MPI für Physik, HLL 1
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Hans-Günther Moser, PXD PXD Summary 1 PXD Sessions: Highlights 1)Sensor production 2) EMCM (& bump bonding) 3)System Simulations 4)Power Supplies and Services.
Jelena Ninković Testing PXD6 - summary and plans Jelena Ninkovic for the HLL team.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Module Assembly - Overview and SWB bumping -
H.-G. Moser, 6 th PXD/SVD workshop, Pisa, Oct PXD Summary 1 DEPFET Sensors production yield inter-metal insulation EMCM electronic tests ASICs Schedule.
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
Beam abort in KEKB and Background measurement by SVD 8 Feb T. Tsuboyama (KEK)
VXD mechanics issues S.Tanaka. Remaining issues (short term) SVD ladder mount table –Mount arm design(KEK+SVD) –Origami cooling pipe assembly procedure.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
DEPFET workshop, Kloster Seeon, May 2014 Summary 1 Highlights Technical Coordination TB report schedule remarks.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
News From KEK S.Tanaka. FY2010 prelim. run schedule 2 Long-term Scheduling Committee (Uno) Max. : 12-May ~ 30-June actual run time is not decided yet.
DEPFET Workshop, May 2016 Ladislav Andricek, MPG Halbleiterlabor 1 o Documentation o Transition to “Production Mode” o Please update docu and place it.
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
Testsystems PXD6 - testing plans overview - by Jelena NINKOVIC Hybrid Boards for PXD6 - by Christian KOFFMANE Source measurements on DEPFET matrices using.
Latest results of EMCM tests / measurements
 Silicon Vertex Detector Upgrade for the Belle II Experiment
Schedule So far: academic exercise to check if all makes sense
Markus Friedl (HEPHY Vienna)
B2GM Sessions PXD I: Wednesday, June 6, 16:50-20:20
Update on the SVD construction
7th Belle II VXD Workshop, Prague
Discussion items SVD mechanics session.
The SOI Issue – Material for PXD9
Origami, PA 2015 Sep. 10 Koji Hara (KEK).
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
Planning for the TDR KEK schedule: Technical Design Report (TDR)
BPAC, 17 October 2017 VXD GND/EMC Markus Friedl (HEPHY Vienna)
EUDET Extended SC meeting 31 August 2009
Status of SOI Pixel Development
Electronics Sub-Group
Group Organization Toru Iijima / Nagoya
SVD group organization, schedule, milestones
Presentation transcript:

B2GM, July 2013, Blacksburg, VA B2GM Summary 1 Blacksburg, VA, July 4-7 Executive changes Spokesperson: Peter Krizan -> Tom Browder IB Chair: Eunil Won -> Zdenek Dolezal Aihara-san will remain as EB chair Masa Yamauchi  Yoshihide Sakai (Belle II Project Manager) SVD detector co-leaders (T. Tsuboyama, M. Friedl)  (K. Hara, C. Irmler) Computing/software position will be modified: “Computing” T. Hara, “Software”, T. Kuhr New physics co-coordinator (Bostian Golob ->(P. Urquijo, K. Trabelsi)

B2GM, July 2013, Blacksburg, VA New Belle II Members 2

B2GM, July 2013, Blacksburg, VA Statistics 3

B2GM, July 2013, Blacksburg, VA DEPFET Production 4 Sensor production started in July batches with 13 and 18 wafers Batch 1: FOL finished, Metal layers waiting for EMCM Batch 2: started Feb. 2013, 18 wafers Batch was split in wafers processing fine (ahead by 21 days) Batch 3: tailing (~ 7 steps behind)

B2GM, July 2013, Blacksburg, VA Batch 1 faster than planned (300d/360d, can be done in 220 days) Wait for EMCM test before start of metal layer processing: Batch 2/3 another 100/120 days for FOL, will be finished well before end of 2013 Expect the first sensors to be ready in July 2014, as scheduled! PXD9 Production 5 Calender Days Production steps Split

B2GM, July 2013, Blacksburg, VA EMCM 6 Electrical dummy: Metal layers only, to be complemented with ASICs tests electrical functionality of the module routing cross talk, voltage drops, RC-delays processing issues (shorts, interruptions) Absolutely mandatory to test EMCM before metal processing is started. 1 st batch of EMCMs failed because of a processing error 2 nd batch (wafers for process development) => 3 good EMCMs They are now at IZM, Berlin for ASIC bonding. New batch with EMCMs in production (8 x 7 ready soon) Plan is to achieve ‘production go’ by end of September Despite the setbacks the EMCM productions turned out to be extremely useful in order to improve our design and technology We still have enough contingency in to meet our schedule (first sensors ready in July 2014)

B2GM, July 2013, Blacksburg, VA TC report (Ushiroda-san) 7

B2GM, July 2013, Blacksburg, VA TC Report: RVC 8

B2GM, July 2013, Blacksburg, VA TC report: Background 9

B2GM, July 2013, Blacksburg, VA Conclusions 10 PXD: Attendance low, finished our session in < 3h lack of discussion on RVC and Assembly/Installation => need to be well prepared for BPAC (VXD hat ~ 8h session!) Background becomes acceptable but not enough safety margin Factor 2 is suggested Do we have to increase the gold layer in the beam pipe ? Belle II: change in management collaboration still growing TOP on the critical path