T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 1 SLHC Cal Trigger Upgrade SLHC Regional Calorimeter Trigger MicroTCA Development.

Slides:



Advertisements
Similar presentations
ROD R&D Status K. Johns, C. Armijo, J. Steinberg (U. Arizona) H. Chen, F. Lanni, J. Mead (BNL) L. Hervas (CERN) A. Meyer, A. Kielburg-Jeka, A. Straessner.
Advertisements

Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
Uli Schäfer JEM Status and Test Results Hardware status JEM0 Hardware status JEM1 RAL test results.
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
9 Mar 2011CMS Calorimeter Trigger Upgrade1 Sridhara Dasu (a), Rob Frazier (b), Tom Gorski (a), Geoff Hall (c), Greg IIes (c), Pam Klabbers (a), Dave Newbold.
Uli Schäfer JEM Status and plans Hardware status JEM0 Hardware status JEM1 Plans.
Uli Schäfer JEM Status and plans Firmware Hardware status JEM1 Plans.
1 Design of the Front End Readout Board for TORCH Detector 10, June 2010.
Development of an ATCA IPMI Controller Mezzanine Board to be used in the ATCA developments for the ATLAS Liquid Argon upgrade Nicolas Dumont Dayot, LAPP.
Prototype of the Global Trigger Processor GlueX Collaboration 22 May 2012 Scott Kaneta Fast Electronics Group.
T. Gorski, et al., U. Wisconsin, October 4, 2010 Calorimeter Trigger Upgrade Hardware R&D Program - 1 Calorimeter Trigger R&D Calorimeter Trigger Upgrade.
Pulsar II Hardware Overview Jamieson Olsen, Fermilab 14 April 2014
Atlas L1Calo CMX Card CMX is upgrade of CMM with higher capacity 1)Inputs from JEM or CPM modules – 40 → 160Mbps (400 signals) 2)Crate CMX to System CMX.
Micro-Research Finland Oy Components for Integrating Device Controllers for Fast Orbit Feedback Jukka Pietarinen EPICS Collaboration Meeting Knoxville.
W. Smith, et al., U. Wisconsin, Oct 13, 2011 Calorimeter Trigger Upgrade- 1 Calorimeter Trigger Schedule M. Bachtis, A. Belknap, M. Cepeda, S. Dasu, E.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
XTCA projects (HW and SW) related to ATLAS LAr xTCA interest group - CERN 07/03/2011 Nicolas Letendre – Laurent Fournier - LAPP.
Tom Gorski, U. Wisconsin, July 20, 2009 SHLC RCT - 1 CMS Calorimeter Trigger SLHC Regional Calorimeter Trigger System Design and Prototypes Tom Gorski.
UClinux console (HyperTerminal) Memec V2MB1000 prototyping board running uClinux on embedded Xilinx® MicroBlaze™ processor Development system with Xilinx.
T. Gorski, et al., U. Wisconsin, November 08, 2011 Calorimeter Trigger Upgrade - 1 Upgrade Cal. Trigger R&D M. Bachtis, A. Belknap, M. Cepeda, S. Dasu,
IPMI developments at LAPP dec 15, 2011IPMI developments at LAPP, L.Fournier1 Alain BAZAN, Fatih BELLACHIA,Sébastien CAP, Nicolas DUMONT DAYOT, Laurent.
Consideration of the LAr LDPS for the MM Trigger Processor Kenneth Johns University of Arizona Block diagrams and some slides are edited from those of.
Zentralinstitut für Elektronik Status of the MicroTCA TDC developments at FZ Jülich H. Kleines, M. Drochner, A. Ackens, P. Wüstner, P. Kämmerling, W.Erven.
1 Hardware Tests of Compute Node Carrier Board Hao Xu IHEP, CAS.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
TBD The Matrix Card Status and Plans Dr. John Jones Princeton University
AMC-based Upgrade of Compute Node Hao XU Trigger group of IHEP, Beijing PANDA DAQT and FEE Workshop, Rauischholzhausen Castle April 2010.
E. Hazen -- Upgrade Meetings1 AMC13 Project Development Status E. Hazen, S.X. Wu - Boston University.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- ACES ACES 2011 MicroTCA in CMS E. Hazen, Boston University for the CMS collaboration.
Eric Hazen1 Ethernet Readout With: E. Kearns, J. Raaf, S.X. Wu, others... Eric Hazen Boston University.
E. Hazen -- CMS Week HCAL Back-End MicroTCA Upgrade Status E. Hazen Boston University.
E. Hazen -- Upgrade Week1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- xTCA IG1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- Upgrade Week1 HCAL uTCA Readout Plan E. Hazen - Boston University for the CMS HCAL Collaboration.
E. Hazen - Detector Electronics1 Detector Electronics New Developments.
10/28/09E. Hazen FNAL Workshop1 HCAL DAQ / Timing / Controls Module Eric Hazen, Shouxiang Wu Boston University.
E. Hazen -- Upgrade Meetings1 AMC13 Project DAQ and TTC Integration For MicroTCA in CMS Status Report E. Hazen - Boston University for the CMS.
E. Hazen -- HCAL Upgrade Workshop1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
MicroTCA Introduction ● New telecom standard from PICMG ● 75mm high cards with ~ 10Gbit/sec serial backplane (up to 20 ports) ● Selected for SLHC trigger.
E. Hazen - Back-End Report1 AMC13 Status Update ● Version 1 (5Gb/s links, Virtex-6 chip) ● 15 modules built, all but 3 distributed to colleagues.
E. Hazen - CMS Electronics Week
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
AMC13 Project Status E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
The White Rabbit MCH Javier Serrano on behalf of Tomasz Włostowski
TWEPP 2010 – Aachen Development of a MicroTCA Carrier Hub
Novosibirsk, September, 2017
Test Boards Design for LTDB
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
E. Hazen - Back-End Report
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
AMC13 Status Report AMC13 Update.
Update on CSC Endcap Muon Port Card
CMS Calorimeter Trigger
ALICE Trigger Upgrade CTP and LTU PRR
HCAL Data Concentrator Production Status
uTCA A Common Hardware Platform for CMS Trigger Upgrades
Task T - CMS at LHC Global Calorimeter Trigger
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
xTCA interest group meeting
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
DAQ Interface for uTCA E. Hazen - Boston University
Table 1: The specification of the PSICM and the ePSICM Prototypes
CMS Calorimeter Trigger Phase 1 Upgrade
Presentation transcript:

T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 1 SLHC Cal Trigger Upgrade SLHC Regional Calorimeter Trigger MicroTCA Development Work T. Gorski, P. Klabbers University of Wisconsin April 28, 2010

T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 2 MicroTCA Prototype Crate uBlade Puma 600W Power Supply NAT MCH ELMA Enclosure and Backplane

T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 3 System R&D: RCT FPGA Firmware Environment Block Diagram Controller Mezzanine Card (CMC) BASE-X Ethernet to Fabric A (SLHC RCT Board) FPGA Flash (Xilinx FPGA) TTC & Trigger Pipeline(HDL) High Speed Links carrying Trigger Data, Clocks (Backplane and Front Panel) MAC Core Microblaze Processor (Firmware Core) Trigger I/O Interface (HDL) Processor Local Bus (PLB) Interface Simple Asynch. Interface ( Parallel I/O To other On-Board FPGAs) SDRAM Ctrllr IPMI Config (SPI) MODULE POWER Pwr Ctl & Monitoring

T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 4 Ethernet R&D: BASE-X Ethernet Development Platform (MicroTCA std) SATA cable running 1000BASE-X Ethernet Virtex-5 FPGAs running Echo server and client under Xilkernel and TCP/IP stack on two modified ML506 evaluation boards Performance: Running TCP/IP Stack under Xilkernel— XMT: 4-40 Mbps (traffic) RCV: Mbps

T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 5 Prototype Card Development (Both Boards in PCB Fab Stage) Controller Mezzanine Card (CMC) Rev A AVR32 Microcontroller IPMI Interface to MicroTCA System uTCA-SATA Test Card Base-X Ethernet test bed CMC Test Carrier

T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 6 Ethernet R&D: Initial MicroTCA BASE-X Ethernet Test (May/June 2010) ELMA MicroTCA Backplane NAT MCH (BASE-X Switch) BaseT Switch ML506 Board (SATA Cable) (SATA to Fabric A Test Board) (1000BASE-X Ethernet on UTCA Fabric A) (Iperf server runs on FPGA) PC (Running Iperf Client) (CAT-5 Cable) (Network Uplink)

T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 7 Hardware/Software R&D: Controller Mezzanine Card (CMC) 55mm x 45 mm module 84-pin PMC connector to AMC module Stands 10mm above main board Services IPMI function for module Geographical Address Main module 12V power control Passes IP address info from IPMI to FPGA Controls boot mode of FPGA via CPLD on main board Based on Atmel UC3A1 AVR32 Microcontroller Runs off of the +3.3V MicroTCA Management Power Software Development (C code in AVR FLASH) during Summer 2010 Use uTCA-SATA Test Card as a Mezzanine Carrier

T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 8 Trigger Algorithm R&D: 2x2 Firmware Test Bed 4 Aux Cards in a 2x2 test fabric TTC-based timing and link synchronization test bed Prototype Test Bed for Rocket I/O “Channel Bonding” for latency management For Testing Trigger Algorithms with Data Sharing C source code for test pattern generation RS-232 Hyperterminal interface

T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 9 Trigger Algorithm R&D: 2x2 Firmware Test Bed Fabric MHz OSC To BPCK1, Slots 0-3 4X (Passive) 4X 3X 4x4 Switches 4X Ch 14 & 15, CK2->CK3 (TTC) Input Card Level Processing Card Level

T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 10 SLHC RCT MicroTCA Activity Summary 10-Slot MicroTCA Crate now in lab CMC and uTCA-SATA test boards in PCB fabrication For building IPMI and embedded Base-X Ethernet capabilities into MicroTCA boards Learning how NAT-MCH supports these functions Developing expertise writing TCP/IP server applications to run in FPGA (e.g., HAL, JTAG) 2x2 Test Fabric constructed using 4 Aux cards and a test fixture PCB System synchronization and link data alignment work—Channel Bonding Test bed for multi-FGPA Trigger Algorithm firmware development Lessons learned in near-term activities to be put to work on SLHC RCT Trigger Prototype boards later in 2010