IEC61400-12-1 Ed 2 Collaboration IEA Task 32 Round Robin & PCWG Worked Examples NREL, Colorado, US 10 th August 2016 IEC Task 32: Luke J Simmons (DNV GL)

Slides:



Advertisements
Similar presentations
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Advertisements

Starting Planning for the 2010 Policy Key Issues Notes for the TAC Executive Committee April 8, 2009 Phil Hattis, AIAA VP for Public Policy.
Ad Hoc Bulk Electric System Task Force Update RPIC February 19, 2009.
Policy Advisory Group (PAG) & Technical Advisory Committee (TAC) Leader Primer Presented by: Devin A. Jopp, Ed.D. President & CEO.
4/25/20151 The Code-Making Process National Electrical Contractors Association.
Technical update on ISO 9001:2015 Colin MacNee Duncan MacNee Limited
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
PCWG 9 th Meeting: 12 December Glasgow Introduction, Agenda and Review of Actions.
1 PCWG Peter Stuart 02 September Agenda (1) 2 Morning Session: 10am-1pm – “Welcome” Peter Stuart (RES) – “Review of Actions.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
Registration and Assessment There are 3 periodic assessments throughout the PhD: Assessment 1: the Research Plan (by 8 weeks) All students must complete.
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Evitherm MTR 07 Sept 04 Phill Giles Thermal Technology Consulting (TTC) Evitherm project mid-term review Work Package 2 Phill Giles Thermal Technology.
Power Curve Working Group Update New Orleans 15 th September 2015.
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
Tripartite meeting Beijing, 8-9 November 2008 Status and Early Experience of CSRs Gary Horn Director Rules & Standards, ABS IACS Hull Panel Chair.
PCWG 15 th Meeting December 2015 – Kings Langley PCWG 2016 Roadmap: Detailed Survey Results.
PCWG-Share-01 Initial Results PCWG Meeting Kings Langley 9 th December 2015 Peter Stuart (RES), Lee Cameron (RES), Alex Clerc (RES) & Andy Clifton (NREL),
8th October Aarhus PCWG-Share-01 Introduction.
Doc.: IEEE /263r0 Submission José A. Gutierrez July-2002 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
IEC TC93 Liaison Report DASC SC Alex Zamfirescu IEC USNC Technical Aadviser TC93 Convener IEC TC93 WG2 September,
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
In-session workshop on safety standards Vienna, 19 July 2016 Page 1 /13.
The CED’s & DED’s role in the Tenure & Promotion of Agents
Research Interest Group (RIG) Chair Orientation
PCWG 2016 Update 20th May 2016 Peter Stuart.
IEC FDIS 2016 Worked Example Industrial Project
IEC FDIS 2016 Consensus Analysis Project
PCWG 2016 Update Wednesday, 13 December 2016 Glasgow, Scotland
IEC FDIS 2016 Worked Examples Ellie Weyer, AWS True Power
PCWG Intelligence Sharing Initiative Update
PCWG Intelligence Sharing Initiative Update 13 December 2016
IEA Task 32 Power Performance Uncertainty Round Robin
Children Services Committee Project 4 Update
WIND And Solar ENERGY CONVERSION MODEL GUIDELINES Consultation update – September 2016 Presented by Marcelle Gannon.
PCWG 2016 Roadmap & Meeting Overview
IEC TC93 Liaison Report to DASC Alex Zamfirescu IEC USNC TA TC93 Convener IEC TC93 WG2 September 2004.
PCWG Intelligence Sharing Initiative
B2B Working Group 30 November, 2016
Road Manager Module National Heavy Vehicle Regulator
Sept 2002 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Overview of the FEPAC Accreditation Process
IEC Activities affecting HSSC Hannu Peiponen Chair of IEC TC80
Review of Professional Standards A National Conversation
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
SKADS Controller’s Meeting Timeline Annual Financial Report
Potential Milestones A timeline to finish in one year
doc.: IEEE <doc#>
Preparing for NCPDP Joint Technical Work Group Meetings
doc.: IEEE <doc#>
Reliability Standards Development Plan
Road Manager Module National Heavy Vehicle Regulator
Item 6.1 COICOP revision Conclusions: The Working Group participants generally agreed with the proposed new structure for COICOP with some reservations.
IEC TC93 Liaison Report DASC SC Alex Zamfirescu IEC USNC Technical Aadviser TC93 Convener IEC TC93 WG2 September,
NERC Reliability Standards Development Plan
IEEE IMT-Advanced Review Process
Strategic Planning Timeline Overview
IEEE IMT-Advanced Review Process
Comments on IMT-Advanced Review Process
NERC Reliability Standards Development Plan
IEEE IMT-Advanced Review Process
9th meeting of the Expert Group on Reporting (22 March 2011)
Editing Board Meeting Status Expert Groups (Transmission, Axle)
The Code-Making Process
Lunar Calibration Workshop Status of the preparation
Presented to the CEOS WGISS October 10, 2019
Green Document for WG 47 on Fires in Tumble Dryers
Presentation transcript:

IEC Ed 2 Collaboration IEA Task 32 Round Robin & PCWG Worked Examples NREL, Colorado, US 10 th August 2016 IEC Task 32: Luke J Simmons (DNV GL) & David Schlipf (Stuttgart University) PCWG: Peter Stuart (RES), Lee Cameron (RES) & Andrew Lawrence (RES)

Document StageDocument Stage DescriptionIEC Ed 2 Status CDV Committee Draft for Voting Feedback Stage: Document is sent to the various National Committees for comment. Once the feedback is received the TC (Technical Committee) integrated the feedback and prepares the FDIS. Completed FDIS Final Draft International Standard Approval Stage: Document is sent to the National Committees for voting. At this stage no comments or requests for change are accepted although typographical errors can be pointed out for correction by IEC prior to publication. If, after the FDIS vote, the publication is approved, no more changes of a technical nature can be made to it. Only obvious editorial mistakes can be corrected. Translation of FDIS to French presently in progress to be followed by issue of English/French FDIS to national committees for voting mid- August to October. Publication of IS (International Standard) Final Stage: The IEC generates the cover pages and prepares the document for publication. The document is published and put on sale in the IEC Web Store. Note that editorial errors not captured prior to publication can still be issued as corrigendum by IEC throughout the life of a specific publication. Expected Late 2016/Early 2017 For a useful overview of the lifecycle of an IEC standard see IEC Status

IEC Task 32 & PCWG Collaboration Overview The PCWG & IEA Task 32 are collaborating on a round robin exercise and associated set of spreadsheet worked examples. IEC Task 32 is running a round robin on the application of IEC Ed 2 using LiDAR data. The round robin will have particular focus on the uncertainty methodology of the new standard (informative Annex E). The PCWG is seeking to develop a set of worked examples showing how to apply the uncertainty method defined in the new standard. Once complete these worked examples will serve as both an educational tool and as a benchmark for the PCWG analysis tool. Expected Outcome: The combination of the round robin and supporting work examples are intended to build industry understanding and consensus of the new edition of IEC

Proposed Timeline (2016) July and August: Distribute round robin dataset and instructions to registered participants. 01 September: Results due to be summarized and presented at PCWG meeting on 07 September in Pamplona September: Present a summary of results and then investigate differences and identify clarifications to be provided in a second exercise, if justified. October: Request second round robin be conducted, results due by end of month. November: Collect final results, prepare summaries for PCWG meeting in Glasgow week of 12 December. December: Presentation of final results at December PCWG meeting. Round Robin (IEA Task 32)Worked Examples (PCWG) July & August: Preparation of work examples. Initial presentation of examples at August PCWG Meeting. September: Preparation of full suite of worked examples at September PCWG Meeting. Release of worked examples on PCWG DropBox. October & November: IEA32 & PCWG feedback on worked examples. December: Public publication of work examples (ww.pcwg.org)

IEC Task 32 Round Robin: How to Participate? Please register by sending an to the IEA Task 32 Operating Agent Representative David Schlipf Please state in your registration o Name and Institution, Member country o Stakeholder role (e.g. system developer, end user, lidar supplier, academic, …). o Do you intent to participate in the round robin and also attend the workshop? Please register by the end of August Upon registration, the participants will receive a set of instructions for participating in the round robin. Participation in the round robin is not a commitment to attend the workshop. An invitation and details for the workshop will be provided at a later date.

IEC Task 32 Round Robin: Analysis Pathways

Worked Examples Worked Example References: [1] Lawrence, A., (2016), Power Curve Measurement Using Method of Bins, TC TC , Issue 01 [2] Lawrence, A., (2016), E.2 Combining Uncertainties [3] Lawrence, A., (2016), E.3.1 Cat A Uncertainty in Electric Power [4] Lawrence, A., (2016), E.13.2 Cat B Uncertainty in Electric Power [5] Lawrence, A., (2016), E.13.3 Cat B Uncertainty in the wind speed measurement [6] Lawrence, A., (2016), E.10 Cat B Uncertainty in Air Density [7] Lawrence, A., (2016), E Cat B Uncertainty for Method related components

Worked Example: Power Curve Measurement Using Method of Bins

Questions?