Linac4-PSB 160 MeV connection readiness review Tuesday 30 August 2016 30 August 2016 Linac4-PSB 160 MeV connection readiness review 2.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
Tomasz Ladzinski GS/ASE. LASS Annual Maintenance & Tests General Principles Each winter shutdown preventive maintenance of EIS takes place. It is followed.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
LHC Fire & Gas Detection Rui Nunes ST/AA/AS. Rui Nunes ST/AA/AS - STTC 21 Feb 2000 Project Goals Install in LHC –Fire Detection –Flammable Gas Detection.
LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.
1 1. Some recent views ( ) 2 Linac tunnel
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Access system M. Gruwé (AB/OP) Thanks to TS/ASE group Extended LTC meeting March 3 rd 2008.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
CATHI Final Review Meeting, September 2014E.Zografos1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
LHC ACCESS SYSTEM 1 EDMS: January 2008 Global Tests of the LHC Access system Outcome P. Ninin, T. Petterson, S Grau, T. Ladzinski 18 th January.
 Based on 2+2 Roman Pot Stations on each side of ATLAS at ~ 240 m from the Interaction Point  Aim in Run 2 at measuring the total cross section and.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Serge Pittet (Work-Package holder) Konstantinos Papastergiou (Work-unit: Sirius converters) CERN Technology Department | Electrical Power Converters 12.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
Nature of workgroup(s) involvedconsequences if not done consolidate beam dumpEN/STIcontinue running with obsolete dump, and without spare upgrade beam.
Duy Phan, EN-STI-RBS. Description of the hazards  An Oxygen Deficiency Hazard (ODH) exists when the concentration of O2 ≤ 19.5 % (by volume)  Cold burns.
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
SPS Personnel Protection System Renovation Project
Linac4-PSB 160 MeV connection readiness review
MEDICIS Safety Alarms Systems
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
BE-ICS activities for LIU Project
BE-ICS Activities during the LS2 Period (15 min)
EHN1 Extension planning
CENF – Personnel Protection System Preliminary Study
CENF – Personnel Protection System Preliminary Study
Activités SPS pour BE/ICS Systèmes d’Alarmes YETS
BE-ICS activities for LIU Project
RWTCS Steering Commitee
HL Consolidation Day Analysis of needs from BE-ICS
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
X-ray Pump-Probe Instrument
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
Electron Beam Systems ETC and Methodology
PSS verification and validation
PSS0 Configuration Management,
Radwaste: status & way forward
North Area Safety Review 2019
LCLS Control System Personnel Linac & BC2 Controls progress
Access Control for CERN Experimental Areas
East Hall under construction
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2

BE-ICS Rui Nunes, D. Chapuis, L. Hammouti, D. Raffourt 30 August 2016 Linac4-PSB 160 MeV connection readiness review 3 Equipment status (Linac4 and LIU-PSB) Rui Nunes - BE/ICS Table of Contents: Overview Access Control PPS Overview Alarm Systems Overview Controls List of activities Work status Additional information Summary

30 August 2016 Linac4-PSB 160 MeV connection readiness review Current SWY sectorization 4 Equipment status (Linac4 and LIU-PSB) Rui Nunes - BE/ICS EDMS /4.5/Switch_Yard-V4.4.pdf

30 August 2016 Linac4-PSB 160 MeV connection readiness review Current LN2 sectorization 5 Equipment status (Linac4 and LIU-PSB) Rui Nunes - BE/ICS EDMS /4.0/LINAC2-V3.1.pdf

30 August 2016 Linac4-PSB 160 MeV connection readiness review Current LN4 sectorization 6 Equipment status (Linac4 and LIU-PSB) Rui Nunes - BE/ICS EDMS /4.0/Linac4-V4.pdf

With the connection of LN4 and dismantling of LN2, the current Linac2 machine shall become a sector of the Switchyard machine (SWY). 30 August 2016 Linac4-PSB 160 MeV connection readiness review Overview PS PSS (access) 7 Equipment status (Linac4 and LIU-PSB) Rui Nunes - BE/ICS

30 August 2016 Linac4-PSB 160 MeV connection readiness review LN2  SWY (version 1) 8 Equipment status (Linac4 and LIU-PSB) Rui Nunes - BE/ICS

30 August 2016 Linac4-PSB 160 MeV connection readiness review LN2  SWY (version 2) 9 Equipment status (Linac4 and LIU-PSB) Rui Nunes - BE/ICS

30 August 2016 Linac4-PSB 160 MeV connection readiness review Version 1 vs Version 2 10 Equipment status (Linac4 and LIU-PSB) Rui Nunes - BE/ICS

ProsCons Version 1Less modification of Access Layout Complete LN2 areas not accessible during beam Move Access point again when LN2 area is re-used for LN5 Verson 2Dismantling of LN2 during beam Less equipment and doors Installation of eventual new LN5 can be done during beam 30 August 2016 Linac4-PSB 160 MeV connection readiness review Version 1 vs Version 2 11 Equipment status (Linac4 and LIU-PSB) Rui Nunes - BE/ICS Cost of implementation is identical for versions 1 and 2

30 August 2016 Linac4-PSB 160 MeV connection readiness review Current SWY and LN2 Alarms Layouts 12 Equipment status (Linac4 and LIU-PSB) Rui Nunes - BE/ICS EDMS /2/Z29-SESEV SWITCH-YARD-( ).pdf EDMS /2/1-Z28-SESEV LINAC-2-( ).pdf

Fire Detection In principle not affected, but > 15y old and in need of renewal To be verified if changes in ventilation impact fire detectors Evacuation and BIW LN2 disconnected from Control Panel in Bat 354 SWY sirens and «break glass» lines are prolonged from SWY into new sector BIW warning flashes and sirens on top of access point must be recabled from building August 2016 Linac4-PSB 160 MeV connection readiness review Overview Alarms 13 Equipment status (Linac4 and LIU-PSB) Rui Nunes - BE/ICS

For ICS controls applications: Contributions to work packages from the equipment groups Additional requests or upgrade requests to BE-ICS should be transmitted via equipment groups according to the project needs. 30 August 2016 Linac4-PSB 160 MeV connection readiness review Overview Controls 14 Equipment status (Linac4 and LIU-PSB) Rui Nunes - BE/ICS

30 August 2016 Linac4-PSB 160 MeV connection readiness review List of activities 15 Equipment status (Linac4 and LIU-PSB) Rui Nunes - BE/ICS PS PPS (Access Safety System 1. Study of new Instrumented safety functions allocation 2. Cabling of new AP & doors 3. Disconnection of LN2 EIS-f and EIS-a 4. Moving Access Point 5. Installation of separator grid for SWY Enclosure 6. Installation/modification of new sector doors & patrol boxes 7. Connection of new EIS-f to SWY 8. Modification of safety programs + wired logic 9. Loading programs on site 10. System commissioning tests 11. DSO tests Detailed EXCEL list is annexed

30 August 2016 Linac4-PSB 160 MeV connection readiness review List of activities 16 Equipment status (Linac4 and LIU-PSB) Rui Nunes - BE/ICS Evacuation & BIW 1. Disconnection of LN2 Evac and BIW from SESEV (Bat 354) Includes de-programming LN2 & non-regression tests 2. Cabling pulling from Bat Connection of new elements to SESEV (Bat 359) Includes calibration on new siren lines 1. System commissioning tests 2. DSO tests Detailed EXCEL list is annexed

30 August 2016 Linac4-PSB 160 MeV connection readiness review Risks / Mitigation 17 Equipment status (Linac4 and LIU-PSB) Rui Nunes - BE/ICS No particular risks identified Take care only of DIMR for work in activated areas

PS PPS functional specification is under work But Preliminary Risk Analysis needs to be reviewed Studies for Evac & BIW not started 30 August 2016 Linac4-PSB 160 MeV connection readiness review Work status 18 Equipment status (Linac4 and LIU-PSB) Rui Nunes - BE/ICS

Strong interdependences with other groups EN-EL for cable and fiber pulling EN-ACE for grid and door construction Manpower Use of existing contracts Lead time to trigger action would be approx 1-2 months Issues / Concerns Design and approval of the concept before implementation Preliminary Risk Analysis (APR) Design and approval of layout (definition of EIS-f/m) & sectorization (EIS-a) Software Specification Documents for safety instrumented functions (SIF) :DSL Test & deployment in platform before production in LN4-SWY-PSB Definition of new type of separator door : Ventilation conformity? Ventilation impact on Fire Detection ? Transitory measures Access control during works ? 30 August 2016 Linac4-PSB 160 MeV connection readiness review Additional information 19 Equipment status (Linac4 and LIU-PSB) Rui Nunes - BE/ICS

Readiness by end 2016 Difficult given current status Risks / Mitigation summary? No particular risks were identified. Preliminary approximate cost estimate PS PPS : kCHF Evac & BIW : 35 kCHF 30 August 2016 Linac4-PSB 160 MeV connection readiness review Summary 20 Equipment status (Linac4 and LIU-PSB) Rui Nunes - BE/ICS