Kensington and parts of west Kinsgford PAMP Workshop: 22 nd June 2010.

Slides:



Advertisements
Similar presentations
North East Transport Consultative Forum Woodhill House, Aberdeen 2 nd October 2014.
Advertisements

December 13, 2010 Developing Bicycle Performance Measures for Integrated Multi-Modal Corridor Management.
Metropolitan Transport Strategy The next step – a visual context January 2006 Local Government Association of South Australia.
2015 Interregional Transportation Strategic Plan CTC Meeting December 10, 2014 Bill Figge, Acting Deputy Director Planning and Modal Programs.
DATS Bicycle Planning 2009 Bicycle Advisory Committee Kickoff Danville Area Transportation Study July 13, 2009.
School travel planning an engineer will love. School travel in Moonee Valley Need: A more planned and coordinated approach to active travel program delivery.
Meeting Agenda Stakeholder Participation Panel July 14, 2003 Welcome/Introductions Study Overview Tasks/Products/Schedule Traffic Patterns Break Key Project.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Comprehensive Plan Update Kevin O’Neill Seattle Bicycle Advisory Board September 2, 2015.
© 2007 PMP. All rights reserved. Wednesday 18 th July South Northamptonshire Council Open Space, Sport and Recreation Study and Green Space Strategy.
Palm Beach MPO Draft Complete Streets Policy Palm Beach MPO Draft Complete Streets Policy Advisory Committees September
21st October 2015 Stillorgan Village Area Movement Framework Plan PUBLIC CONSULTATION INFORMATION PERIOD DOCUMENT.
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
December 17, 2010 Developing Transit Performance Measures for Integrated Multi-Modal Corridor Management.
Light Rail Project Community Light Rail Support Plan Committee 14 August 2014 Kensington Kingsford.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
City of Belmont Comprehensive Bicycle and Pedestrian Plan Parks and Recreation Commission Meeting 11/4/2015.
An Assessment Of Traffic Impacts Upon Kensington And Parts Of Kingsford 13/07/09.
Pedestrian Master Plan Update Seattle Planning Commission Michelle Marx, Ian Macek, Kevin O’Neill May 26, 2016.
Healthy Community Element City of South Gate General Plan 2035 (adopted 12/08/09)
2035 General Plan Update Planning Commission Study Session on Draft Circulation Element February 2, 2016.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
Mobility for all Modes Update to the Transportation Chapter of the City’s Comprehensive Plan City Council May 27,
Planning Overview, Newbury Gary Lugg Head of Planning and Countryside.
Raumati Road Corridor Consultation and Corridor Assessment
Land west of Grace Crescent, Hardwick Presentation to Hardwick Parish Council 23/08/2016.
Moloto Road (R573) Safety Investigations
Pedestrian Facility Improvement Program
Rock Creek East II Livability Study
SMART URBAN FUTURES PRESENTATION
Welcome to Scottish Improvement Skills
Broadclyst Neighbourhood Plan
Place Standard How Good is Our Place?
Agenda – Morning Session
CCP: Monitoring and Evaluation
REGIONAL FREIGHT TRANSPORT PLAN
Project Management Team Meeting #3
Place Standard Irene Beautyman Planning for Place Programme Manager
Arlington Traffic Management Plan
Technical and Public Advisory Committee Meeting #3
VicRoads – Movement & Place
Draft Transportation Element September 6, 2017
Ministry of Transport Viet Nam
Understanding the drivers of children’s independent mobility
Grey County Transportation Master Plan
Loddon Campaspe Integrated Transport Strategy
Peter Molyneux Transport for the North.
FHWA Bicycle and Pedestrian Program
NVTA Countywide Pedestrian Plan of July 2016
The Regeneration of Swanley
San Mateo Countywide Transportation Plan update
Cullompton Neighbourhood Plan
Fishermans Bend Draft Framework Transport Recommendations
Place Standard How Good is Our Place?
SMART URBAN FUTURES PRESENTATION
REGIONAL FREIGHT TRANSPORT PLAN
VicRoads – Movement & Place
Understanding the drivers of children’s independent mobility
Loddon Campaspe Integrated Transport Strategy
Bicycle and Pedestrian Update to City Council
Sarno Road Corridor Study
Josephine County TSP Update
Sport and Recreation Infrastructure Programme
Roger Mackett, Kamal Achuthan and Helena Titheridge
Parks Highway Reconstruction: Lucas Road to Big Lake Road
Do Roads Connect or Divide? The Other Side of the Road
I Street Bridge Replacement Project
Focused General Plan Update Status Report & Visioning Overview
Presentation transcript:

Kensington and parts of west Kinsgford PAMP Workshop: 22 nd June 2010

Agenda Introduction Study area Workshop Purpose PAMP Study Progress Discussion Main pedestrian routes Key issues Key locations Route discussion Key improvements Closing remarks

Introduction PAMPs - RTA initiative started in 1998 PAMPs - consideration of all road user needs, including pedestrians Very little planning for pedestrians undertaken before the PAMPs initiative Different approaches for different Council areas

Aim of PAMP To coordinate funding and implementation of pedestrian investments. To improve planning for pedestrian safety, amenity, access and mobility To improve: Coherence Directness Safety Attractiveness Equity

Methodology We are here

Focus Group Workshop Opportunity for participants and relevant agencies to contribute to the preparation of the Plan Facilitate the exchange of information Increase the information base for the Kensington and parts of west Kingsford PAMP development Discuss strategic directions of the PAMP Identify issues and locations of concerns

Objectives Plan to improve facilities for pedestrians Reduce severance Improve accessibility to all pedestrian Integrate the pedestrian network and public transport links Consider land use changes in pedestrian planning Facilitate walking as a transport mode Further Council’s obligation under DDA

Study Area The study area focuses on the Kensington and west Kingsford area. As outlined in the Brief, the study area is bound by Todman Avenue and Alison Road to the north, Anzac Parade to the east, Gardeners Road to the south and South Dowling Street and Tunstall Avenue to the west.

Data Review Kensington/ Kingsford Traffic Impact Assessment, 2009 West Ward Disability Access Study, 2007 Recreational Needs Study, 2008

Pedestrian accident data fatal accidents 67 injuries Fatalities were recorded at: Day Avenue Anzac Parade Alison Road Tressider Avenue

Generators and Attractors UNSW Primary, High Schools and TAFE Retail and restaurant uses along Anzac Parade Bus routes Community Facilities Parks; Places of worship

Questionnaire Online questionnaire 91 online submissions received In general, the questions focussed on What are the travel patterns of residents in the area? Where are the major problem locations? What facilities and where could be upgraded to improve pedestrian safety, access and mobility?

Draft PAMP Network The high and low priority routes were established by examining the following factors: the location of pedestrian accidents hazardous locations identified through the community consultation process key pedestrian routes identified through the community consultation process the location of pedestrian generators and attractors; and path nature.

Discussion What are the main pedestrian routes in the study area? Where are the hazardous locations within the main pedestrian routes? Why? What issues do you feel are relevant to pedestrian access and mobility within those areas? High or low priority routes? Deficiencies along the identified routes? Any other comments? 21

Pedestrian Network Audit Checklist Accessible paths of travel Major intersections Pedestrian crossings Fixtures/furniture - seating, bus stops, rubbish bins Barriers to pedestrian movement Pedestrian volume estimates General comments 22

Final PAMP Five to ten year works schedule for pedestrian facilities Route network and prioritisation Policy direction for Council Implementation of the PAMP Ongoing communications between Council and other agencies 23

Kensington and parts of west Kinsgford PAMP Workshop: 22 nd June 2010