Dr. K RAMAMURTHY Divisional Controller Mysore City Transport Division Karnataka State Road Transport Corporation.

Slides:



Advertisements
Similar presentations
Chubaka Producciones Presenta :.
Advertisements

2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
The Potential BRT in Asia
1 Transportation Operations and Financial Review Michael E. Finn, CFO.
Mobility plan for Geneva Airport employees. Constraints and needs for the mobility of Geneva airport staff Airport staff: all employees working in the.
Presentation to the Subcommittee on Highways and Transit and the House Committee on Transportation and Infrastructure Peggy Catlin, Deputy Executive Director.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Service Planning & Standards Unit 4: Service Planning & Network Design.
Intelligent Transportation System (ITS) Project Update TAC - July 21, 2015 Nick Perfili, FCDOT Department of Transportation.
Department of Transportation Transit Rebranding New Brand Identity City Council November 4, 2013.
Sustainability of Public Transport –BMTC best practices By Mr Anjum Parwez, IAS Managing Director BMTC, Bangalore A Presentation on.
Mr. Maqsood ahmed N ITS INCHARGE: CENTRAL CONTROL STATION MCTD, MYSORE Mr. Maqsood ahmed N ITS INCHARGE: CENTRAL CONTROL STATION MCTD, MYSORE.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
TEMPORAL VISUALIZATION OF DATA FROM THE FRENCH SENTINEL NETWORK.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
AUG SEPChange % Cong. Travel18.0%14.5%3.5% Travel Time Index Buffer Index PORTLAND CONGESTION REPORT September 2005 Month vs.
Finance Department Environmental Services City of Superior Superior Water Light & Power Wastewater Billing.
Intelligent Transport System (ITS) Dr. Ekroop Caur, IAS.
Finance Department Environmental Services
Agenda MC Aug 13.
APSRTC LIVE Tracking & Passenger Useful Systems
Enhance customer service access options;
The Business of Transportation
“Falcone - Borsellino Airport”
Payroll Calendar Fiscal Year
Baltimore.
SmartMeterTM Steering Committee Update – September 2012
Broward County Consolidated Communication Committee Update
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
13-block rotation schedule
I.E.S. Universidad Laboral
The Business of Transportation
Transit Signal Priority: The Importance of AVL Data
2018/2019 School Calendar July August September October November
Snapshot of the year, jump into some of the highlight moments shortly
Study 4 – Business Income Forms: Sum Insured; Loss Settlement
Irregularities in DoRIS
McDonald’s Kalender 2009.
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
PCS Day - Feedback 23th November 2016, Vienna.
PBIS Update November 2005.
PBIS Update December 2005.
2300 (11PM) September 21 Blue line is meridian..
Transit Integration and Efficiency Study Transit Advisory Committee
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
PBIS Update October 2005.
Bus services and contracts in London
GANTT CHART can be used for scheduling generic resources as well as project management. They can also be used for scheduling production processes and.
McDonald’s calendar 2007.
Broward Quality Performance Review
Prof. dr. Giedrius Vanagas
Sample ‘Scheduling Process’
A Climate Study of Daily Temperature Change From the Previous Day
Irregularities in DoRIS
Births as per Civil Registration System,
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Monthly Performance Report
Bay of Plenty Regional Council
RTC RIDE Service Improvement Recommendations
McDonald’s calendar 2007.
PLAYMATES LEARNING CENTER CALENDAR
ANCHORAGE POLICE DEPARTMENT DATA COLLECTION
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
PBIS Update January 2006.
2015 January February March April May June July August September
Performance Measurement
Presentation transcript:

Dr. K RAMAMURTHY Divisional Controller Mysore City Transport Division Karnataka State Road Transport Corporation

 To establish an intelligent system to improve quality & convenience of public transport  Ensure the delivery of safe, fair, reliable and environment-friendly transport system  To promote use of sustainable transport modes and enable commuters to make informed choices  To Optimize operations, improve fleet utilization, schedules, and vehicle availability with accurate information  To Optimize Resources and efficient utilization in peak hours

MIS Reports 3 Sl.Report No.Report Name 1MIS 1 BUNCHING OF BUSES 2MIS 2 SCHEDULE ADHERENCE REPORT 3MIS 3 BUS BREAK DOWN REPORT 4MIS 4 ROUTE DEVIATION REPORT 5MIS 5 MISSED TRIPS REPORT 6MIS 6 SCHEDULE DEPARTURE DAILY 7MIS 7 SCHEDULE ARRIVAL DAILY 8MIS 8 DAILY DEPARTURE PUNCTUALITY 9MIS 9 DAILY ARRIVAL PUNCTUALITY 10MIS 10 SCHEDULE PERFORMANCE REPORT 11MIS 11 DAILY OPERATIONAL SUMMARY 12MIS 12 CONTROL CHART Based on bus operations, ITS application generates 12 value added reports which are being used by depot managers and traffic operations team for analysis and continuous improvements.

Control room Understand Operations Monitor Service Performance Analyze, Identify & Address Issues Arrive at most effective model Enhance & Improve Efficiency Provide most Optimal Service

Measures of Performance Indicators Baseline April Temporal Survey-1 Temporal Survey-2 Temporal Survey-3 Temporal Survey-4 April 2016 Benchmark Trip Origin – Proportion of trips departing ± 5 minutes from scheduled time 1 9%*19%24%32%46%84%79% Trip Midpoint – Proportion of trips between -1 to +5 minutes of scheduled time 1 7%19%23%31%45%80%79% Trip Endpoint – Headway coefficient (headway standard deviation/mean headway) NA84%73% 64%-39% Performance Indicator: Schedule Adherence

Measures of Performance Indicator Baseline April Temporal Survey-1 (March 2013) Temporal Survey-2 (February 2014) Temporal Survey-3 (September 2014) Temporal Survey-3 (February 2015) APRIL 2016Benchmark Average wait time at bus stop 20 minutes 16 minutes 15.2 minutes 17.2 minutes 15.2 minutes 14 minutes 12 minutes Average travel time 30 minutes 30 minutes 30 minutes 30 minutes 30 minutes 30 minutes 30 minutes Total time (wait time + travel time) 50 minutes 46 minutes 45.2 minutes 47.2 minutes 45.2 minutes 44 minutes 42 minutes Performance Indicator: Passenger Waiting Time

Cars/jeepThree wheeler 4 wheeler TATA MAGIC Two Wheeler Private and MINI Buses KSRTC BUSES IN PERCENTAGE MODAL SHARE (PASSENGER) SOURCE: M&E survey 2015

Bunching- If two buses operating in same route pass by any bus stop within 5 min system records incident of bunching APRIL 2013APRIL2014APRIL2015APRIL

84% for all departing buses are within ±5 minutes of their scheduled time which is increased by 82% compared to the improvement in trip reliability from February % of the buses reached their midpoint within -1 to +5 minutes of their schedule time; this is a 84% improvement compared trip reliability from February The commuters wait time at bus stops has decreased from 17.2 minutes to 15.2 minutes when compared with the 3rd temporal surveys.

76.2% of new KSRTC users shifted due to ITS. Overall user satisfaction of ITS system is 75.4%. There is an increase from 32.5% to 53.0% in KSRTC commuters’ satisfaction level on Use of Bus Arrival Information at Bus Stops component. 63% of KSRTC commuters responded that they use bus schedule for planning their trip. This is increased by 21% compared to previous survey results. This is a positive sign. 77% of commuters’ responded that their preference of getting bus arrival information at bus stops itself. Shift from other modes to KSRTC bus within one year has increased by 13% compared to the previous temporal survey.

SL NO MIS REPORT ATTRIBUTE OCT 15 NOV 15 DEC 15 JAN 16 FEB 16 MAR 16 APR 16 1NO OF BUS STOPS SKIPPED NO OF SPEED VIOLATIONS NO OF SUDDEN ACCELERATION NO OF HARSH BRAKES IMPROVEMENTS IN OPERATIONAL EFFICIENCY COUNTS PER BUS PER TRIP

Measures of Performance Indicator Baseline April Temporal Survey-1 (March 2013) Temporal Survey-2 (February 2014) Temporal Survey-3 (September 2014) Temporal Survey-3 (February 2015) APRIL 2016 Benchmark Operating cost per km Rs Rs Rs Rs Rs Rs18.96 Rs Operating cost per passenger Rs. 6.84Rs. 5.85Rs. 6.31Rs. 6.15Rs. 5.5 Rs6.06 Rs OPERATING COST

Schedules Per day eff.kms Earning per bus Crew on roll Staff ratio Crew Ratio per schedule Productivity per employee

Load factor Dead km percentage CANCELLATION DUE TO LATE DEPARTURE (km) CANCELLATION DUE TO EARLY ARRIVAL(km)

MONTHTIMELYEARLYLATE Aug Sep Oct Nov Dec Jan Feb Mar Apr In Percentage

MONTH Difference FATAL % MAJOR % MINOR % INJURIES % DEATHS %

SL NOMONTHALERTS RECEIVED 1 Jul BASE DATA 2 Aug % 3 Sep % 4 Oct % 5 Nov % 6 Dec % 7 Jan % 8 Feb % 9 Mar % 10 Apr %

DIFFERENCE DIFFERENCE April May June July August September October November December January February March TOTAL

DESCRIPTIONAS PER FORM VACTUAL GIVENDIFF OT AS PER FORM V hrs hrs hrs Considering cost of Rs200 per hour overall reduction in OT given is 124 lakhs

DECEMBER 2015In percent(%)APRIL 2016In percent(%) IN Time >

 Using ITS application all the schedules optimized which resulted in reduction of 2314 km daily (844610km Annually)  Savings on lubricants & filters of preventive maintenance is 2.19 lakh (Avg cost of lub 20ps and filter 5ps per km)  Same effective km and revenue achieved with 8 less buses considering average cost of operation as 25 lakhs per bus per year approximately 146 lakhs saved on operating cost  Reduction of staff in central bus station resulted in approximately 35 lakhs savings on staff cost per annum  Based on optimization and effective usage of ITS application reduction in Over Time of 124 lakhs

YEAR SMSIVRSCOMMUTER PORTAL No of People Queried No of SMS received SMS Sent IVRS calls USERS PAGE VIEWS

To effectively utilize the ITS System KSRTC has set goals classified as: Immediate Medium term Long term

Promote mobile app to achieve modal shift Effective alignment of current business processes to achieve higher fleet and crew utilization Achieve 95% punctuality in operations Achieve 100% adherence to schedules To bring down cancellation to less than 1% To set service level improvement parameters(SLIP) and achieve Media Campaign and Public Outreach Program. Effective usage of ITS data by Traffic Police, City Corporation, District Authorities etc. Integrating ITS system within KSRTC existing IT solutions

Non-KSRTC commuters using KSRTC bus as their secondary trips have increased by 4% compared to previous temporal surveys. 48% of non-KSRTC commuters are private employment/businesses and 22% of non-KSRTC commuters are students. 84% of non-KSRTC commuters are using 2 wheelers and 3 wheelers. KSRTC has to target these groups of commuters to influence them to shift to KSRTC.

26